Watts Bar Nuclear Plant, Post Office Box 2000 Spring Gity, Tennessee 37381 May 23,2017 ATTN: Document Contro! Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Subject.

Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391 Emergency PIan Implementing Procedure Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.5a(qX5), and 10 CFR 72.44(f), the following Emergency Plan lmplementing Procedure (EPIP) has been revised with administrative and editorial changes:

EPIP Revision Title Personnel Accountability and Evacuation 10 cFR 50.4 10 CFR 50, Appendix E, Sectron V 10 CFR 50.54(qX5) 10 cFR 72.4 10 cFR 72.44(f)

Effective Date 05/0 1t2017 0031 The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plans. The revisions include added steps to perform site announcements and adding Local Law Enforcement Agencies as optional to call for traffic control.

There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, d @23) 365-3232.

Respectfully, Site Vice President Watts Bar Nuclear Plant

U.S. Regulatory Commission May 23,2017 Page 2 cc: