Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 WBL-20-037 August 6, 2020 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Subject:
Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90, NPF-96 NRC Docket No. 50-390, 50-391 Emergency Plan Implementing Procedures Revision 10 CFR 50.54(q)(5) 10 CFR 72.44(f)
In accordance with the requirements of 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the Tennessee Valley Authority (TVA) is submitting a description of changes to the Watts Bar Nuclear Plant (WBN) Radiological Emergency Plan. The affected document is the WBN Emergency Plan Implementing Procedures (EPIP) listed below:
EPIP 5
7 Revision 53 41 Description of Changes EPIP-5 Title General Emergency Activation and Operation of the Operations Support Center (OSC)
Effective Date 07/22/2020 07/23/2020 WBN EPIP-5 was updated to correct Appendix H (page 2) Protective Action Recommendation (PAR) flowchart.
EPIP-7 WBN EPIP-7 was updated to correct the sequence of steps in Appendix G and dosimetry reference to Dosimeter of Legal Record (DLR).
U.S. Regulatory Commission WBL-20-037 August6,2020 Page2 The above changes were evaluated in accordance with 10 CFR 50.54(q)(3) and determined that the changes did not reduce the effectiveness of the Emergency Plan.
There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Mike White, Emergency Preparedness Manager, at (423) 365-3232.
nthony L. Williams IV Site Vice President Watts Bar Nuclear Plant cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector