WBL-21-042, Unit 2 - Emergency Plan Implementing Procedure Revision

From kanterella
Jump to navigation Jump to search
Unit 2 - Emergency Plan Implementing Procedure Revision
ML21245A252
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/02/2021
From: Anthony Williams
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
WBL-21-042
Download: ML21245A252 (1)


Text

' TENNESSEE VALLEY AUTHORITY Post Office Box 2000, Spring City, Tennessee 37381 WBL-21-042 September 02, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Watts Bar Nuclear Plant, Unit 1 and Unit 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048 Emergency Plan Implementing Procedure Revision 10 CFR 50.54(q)(5) 10 CFR 72.44(f)

Pursuant to Title 10, Code of Federal Regulations (10 CFR) 50.54(q)(5), and 10 CFR 72.44(f),

the Tennessee Valley Authority (TVA) is submitting a description of change to the Watts Bar Nuclear Plant (WBN) Radiological Emergency Plan (REP ). The affected document is the WBN Emergency Plan Implementing Procedure (EPIP) listed below:

EPIP 8 Revision Title 34 Personnel Accountability and Evacuation Description of Changes EPIP-8 revision 34 enacted the following changes: Effective Date 08/24/2021

  • Minor/editorial revision to correct typographical errors and other format correct ions.
  • Formatting and corrected referenced Attachments typographical errors.
  • Added "Nuclear Security" to first use of "NS" abbreviation.
  • Corrected a typographical error in Attachment 4 (Radiation Protection - Assembly And Accountability Actions) title.
  • Changed the formatting of some steps in the procedure.