Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Summary of Changes to the Quality Assurance Program Manual". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • NMP1L3371, Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-10  + (Summary of Changes, Quality Assurance Topical Report, NO-AA-10 & Decommissioning Quality Assurance Program, NO-DC-10)
  • JAFP-84-0598, Summary of Changes,Mods & Tests Implemented During 1983,per 10CFR50.59  + (Summary of Changes,Mods & Tests Implemented During 1983,per 10CFR50.59)
  • JAFP-88-0004, Summary of Changes,Tests & Experiments Implemented at Plant During 1986,per Requirements of 10CFR50.59  + (Summary of Changes,Tests & Experiments Implemented at Plant During 1986,per Requirements of 10CFR50.59)
  • ML20210E457  + (Summary of Changes,Tests & Experiments Performed at Aerotest Radiography & Research Reactor (Arrr),For Period 980701 Through 990630. with)
  • ML20116P038  + (Summary of Changes,Tests & Experiments That Had Been Implemented During June 1996)
  • ML20094J950  + (Summary of Changes,Tests & Experiments for Hope Creek Generating Station Unit 1,Jan & Feb 1992)
  • ML20101G263  + (Summary of Chernobyl Followup Research Activities)
  • ML21257A382  + (Summary of Clarification Cal with Holtec Decommissioning International, Llc. Regarding Second Follow-On Emergency Preparedness Request for Additional Information)
  • ML25226A211  + (Summary of Clarification Call with APS to Discuss Draft RAI PVNGS Units 1, 2, and 3 and Independent Spent Fuel Storage Installation (ISFSI) Emergency Planning License Amendment (EPID L-2025-L)
  • ML17082A311  + (Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02)
  • ML21217A070  + (Summary of Clarification Call with Pacific Gas and Electric Company Regarding Trailer City Final Status Survey Report)
  • ML23180A145  + (Summary of Clarification Meeting with Zionsolutions, LLC Regarding 2023 Confirmatory Surveys for the Zion Nuclear Power Station, Units 1 and 2)
  • ML071590154  + (Summary of Clarification Phone Call Regarding Pilot Plant (Shearon Harris) Transition to National Fire Protection Association Standard 805)
  • ML071650065  + (Summary of Clarification Telephone Call with Progress Energy Regarding Pilot Plant (Shearon Harris) Transition to National Fire Protection Association Standard 805)
  • ML19331C342  + (Summary of Class 9 Subcommittee 800509 Meeting Re near-term OLs & Future Designs)
  • ML23181A034  + (Summary of Classification Meeting with TMI-2 Solutions, LLC Regarding the Process for Consultation Under Section 106 of the National Historic Preservation Act of 1966 as Related to the Historic and Culture Resources Review License Amendment)
  • ML17352A640  + (Summary of Closed Audit for the Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0 and Wcap-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio.)
  • ML24096A040  + (Summary of Closed Call U.S. Nuclear Regulatory Commission Review of Westinghouse Electric Company Topical Report WCAP-18446-P_NP, Rev 0, Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs)
  • ML19282B651  + (Summary of Closed Call with Gle on September 30, 2019, to Discuss RAI on a Transportation Security Plan)
  • ML21028A638  + (Summary of Closed Follow-up Call to Discuss U.S. Nuclear Regulatory Commission Review of HDI Topical Report HI-2200750, Rev.0, Holtec Spent Fuel Pool Heat Up Calculation Methodology and Initial Draft RAIs)
  • ML23006A252  + (Summary of Closed Hybrid Meeting with Framatome Inc. and the U. S. Nuclear Regulatory Commission for Topical Report, Anp 10339P, Revision 0, Arita - Artemis/Relap Integrated Transient Analysis Methodology)
  • ML25134A299  + (Summary of Closed Meeting - Louisiana Energy Services, L.L.C. (Dba) Urenco USA, Docket Number 70-3103)
  • ML21341B447  + (Summary of Closed Meeting Between NRC Staff and X Energy, LLC for Pre-submittal Discussion of Topical Report Control Room Staffing Analysis Methodology)
  • ML14133A059  + (Summary of Closed Meeting Between Representatives of the Army Corps of Engineers, Nuclear Regulatory Commission, Federal Energy Regulatory Commission, Exelon Generation Co, LLC, and PPL Susquehanna, LLC, to Discuss Dam Failure Analysis)
  • ML14139A344  + (Summary of Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Analysis)