MONTHYEARML21300A0272021-10-28028 October 2021 Clarification Call, Summary of October 21, 2021, Clarification Call with Pacific Gas and Electric Company Regarding Final Status Survey Report HBL-21-010, Survey Unit OOL01-03 ML21287A2512021-10-26026 October 2021 Meeting Summary 2021-10-13 Humboldt Bay Independent Spent Fuel Storage Installation (ISFSI) ML21217A0702021-08-0505 August 2021 Summary of Clarification Call with Pacific Gas and Electric Company Regarding Trailer City Final Status Survey Report ML21158A1132021-06-28028 June 2021 License Amendment Application - Revision of the License Termination Plan - May 3, 2021 Request for Additional Information Response Clarification Call ML19296A0952019-10-28028 October 2019 Summary of the August 26, 2019, Public Meeting Near the Humboldt Bay Power Plant Regarding the Establishment and Operation of Community Advisory Boards ML13357A8082013-12-24024 December 2013 B. Watson Memo Meeting Summary of December 5, 2013 Humboldt Bay on License Termination Plan ML13357A7952013-12-24024 December 2013 B. Watson Memo Meeting Summary of December 5, 2013 Meeting with PG&E on Humboldt Bay Emergency Plan ML13274A0572013-10-0202 October 2013 August 20, 2013 Summary of Meeting for Humboldt Bay ML1107001862011-03-15015 March 2011 Summary of Public Meeting with Pacific Gas & Electric to Discuss Decommissioning Actions Related to Humboldt Bay, Unit 3 ML0731201642007-10-23023 October 2007 Summary of Meeting to Discuss Humboldt Bay Power Plant Unit 3 Plans and Schedule for the Fossil Repowering Project ML0706105072007-03-15015 March 2007 Summary of Meeting with Pacific Gas & Electric to Discuss for Decommissioning and License License Termination of Humboldt Bay (Hbpp), Unit 3 and Plans for the Fossil Repowering Project and Its Interface with Hbpp ML0503303912005-02-0202 February 2005 Summary of Meeting with Pacific Gas and Electric Company to Discuss the Application for the Humboldt Bay ISFSI (Tac No. L23683) ML0502403142005-01-25025 January 2005 Summary of Meeting Between the Nuclear Regulatory Commission Staff and Pacific Gas and Electric Regarding the Humboldt Bay Power Plant Special Nuclear Material Control and Accountability Project ML0412101482004-04-29029 April 2004 Summary of Meeting with Pacific Gas & Electric and Holtec Regarding Plans Related to the Installation of a Single-Failure-Proof Crane at Humboldt Bay ML0402801032004-01-26026 January 2004 Memorandum to L. Camper from J.R. Hall - 12/19/2003 Summary of Meeting with Pacific Gas and Electric Company Regarding the Humboldt Bay Independent Spent Fuel Storage Installation License Application (TAC No. L23589) ML0320601582003-07-24024 July 2003 Summary of Meeting with Pacific Gas and Electric Company Regarding a Proposed Independent Spent Fuel Storage Installation at Humboldt Bay 72-27 (TAC L23589) ML0203505932002-02-0101 February 2002 Memo to C. L. Miller from: T. J. Kobetz Subject: Summary of the January 24, 2002, Meeting Between the Nuclear Regulatory Commission Staff and Pacific Gas and Electric, Co. Enclosures: 1.) Attendance List; and 2) PG&E Project Slides ML0200802402002-01-0808 January 2002 Memo to C. L. Miller from: T. J. Kobetz Subject: Summary of the December 21, 2001, Meeting Between the Nuclear Regulatory Commission and Pacific Gas and Electric Company (TAC No. L23358) Attachment: Attendance List ML0037739982000-11-30030 November 2000 Memo to S. Shankman from: T.J. Kobetz Subject: Summary of the November 17, 2000, Meeting Between the NRC and Pacific Gas and Electric Co. Attachments: 1.) Attendance List; 2.) Pge Slides ML17252A0301976-03-24024 March 1976 Summary of Meeting Regarding BWR Feedwater Nozzle Cracking 2021-08-05
[Table view] |
Text
August 5, 2021 LICENSEE: Pacific Gas and Electric Company FACILITY: Humboldt Bay Power Plant, Unit 3
SUBJECT:
SUMMARY
OF AUGUST 4, 2021, CLARIFICATION CALL WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING TRAILER CITY FINAL STATUS SURVEY REPORT, THE HUMBOLDT BAY POWER PLANT, UNIT 3 The U.S. Nuclear Regulatory Commission (NRC) conducted a clarification call with Pacific Gas and Electric Company, the licensee, on August 4, 2021. The purpose of the meeting was a clarification teleconference to ensure NRC staff understands certain aspects of the final status survey report (FSSR) for Trailer City that was submitted on May 21, 2020 (Agencywide Documents Access and Management System Accession No. ML20142A287) for the Humboldt Bay Power Plant, Unit 3.
The meeting began with opening remarks by the NRC staff, followed by introductions of the attendees. A list of attendees is enclosed.
The NRC staff asked the licensee to explain why the survey boundaries for the OOL09-10-FSR survey were inconsistent with the survey boundaries for OOL09-10 when the final survey report (FSR) area is supposed to be backfilled in the original survey unit. The Licensee explained that after completing remediation of the Trail Buffer Zone by excavation, the licensee subsequently backfilled the excavation utilizing soil from on-site that had been screened through the GARDIAN system which is a bulk material measurement system used to screen trucks containing soil. The licensee said that the backfill actually extended outside of the excavation area (the OOL09-10 survey unit boundaries) as needed to contour portion of a catch basin in the previously surveyed and neighboring Duck Pond survey unit (a Class 3 survey unit). The licensee describes the OOL09-10-FSR survey unit as a Class 1 open land area of 1,771 m2 which includes materials used as backfill in the OOL09-10 survey unit and nearby. The licensee said the same was true for the OOL09-09-FSR survey unit which borders the OOL09-10-FSR survey unit.
The NRC staff informed the Licensee that the NRC staff believes that no additional requests are needed for the Trailer City FSSR at this time.
Pacific Gas and Electric Company At this meeting, the NRC staff made no regulatory decisions about the merits of the Trailer City FSSR.
Please direct any inquiries to me at (301) 415-6822 or Amy.Snyder@nrc.gov.
Sincerely, Signed by Snyder, Amy on 08/05/21 Amy M. Snyder, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No.: 50-133 License No. DPR-7
Enclosure:
As stated