Attachment to L-2018-024 Page 1 of 1 Summary of Changes to Turkey Point Plant Radiological Emergency Plan, Revision 63 AR 2162227 Implementation Date: 1/5/2018 The Turkey Point Plant Radiological Emergency Plan was revised to incorporate the following changes:
Appendix D Emergency Action Levels (EALs) were revised to implement changes due to updated design basis document changes to reflect elimination of the Auxiliary Building Laundry Room exhaust fan:
RU1 values for:
o PRMS R-14, Plant Vent from 6.4E+4 cpm to 7.4E+4 cpm o RAD 6304, Plant Vent SPING from 3.2E-4 µCi/cc to 3.7E-4 µCi/cc RA1 value for :
o RAD 6304, Plant Vent SPING from 3.2E-2 µCi/cc to 3.7E-2 µCi/cc RS1 value for :
o RAD 6304, Plant Vent SPING from 2.0E-1 µCi/cc to 3.3E-1 µCi/cc RG1 value for :
o RAD 6304, Plant Vent SPING from 2.8E+0 µCi/cc to 3.3E+0 µCi/cc Editorial changes included updates to:
Letters of Agreement with offsite response organizations Response facility titles Offsite organization titles Onsite emergency facilities map - Figure 2-6 Plant normal operating organization - Figure 2-3 Clarify the means by which the Emergency Coordinator may communicate information to the Recovery Manager (page 4-2)
Change TLD to Dosimeter of Legal Record in Step 5.1.6 Replace page 1 of 5 of Figure 5-1, Protective Action Recommendations Based on Plant Conditions and Offsite Does Estimates, to correct a typographical error in note(1)
Add clarifying statements to note(1) on page 2 of 5 of Figure 5-1 to incorporate revisions made to 0-EPIP-20134 regarding the Containment High Range Radiation Monitoring System (CHRRMS) channels RD-3/4-6311A/B Revise Table 5-4, Evacuation Time and Traffic Capacity Estimates, to reference the most current evacuation time estimate data Correct typographical error in Appendix C by deleting outdated note Revise main steam line radiation monitor nomenclature to reflect current equipment identification o Changed RAD 6426 (DAM1) to MSL 3[4]-RAD 6426 A, B, C for EALs RU1, RA1, RS1, RG1 Revised Appendix D threshold value description for RA2 to be consistent with NRC SER dated 12/14/09