Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077B191 + (Submits Suppl Response to NRC GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance)
- BSEP-96-0072, Submits Suppl Response to NRC GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs + (Submits Suppl Response to NRC GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs)
- RBG-26189, Submits Suppl Response to Re Violations Noted in Insp Rept 50-458/85-31.Commitment to Revise Surveillance Test Procedures to Incorporate Mods to Integrated Leak Rate Test Procedure 1-PT-57-1 Scheduled for Completion by 871231 + (Submits Suppl Response to Re Violations Noted in Insp Rept 50-458/85-31.Commitment to Revise Surveillance Test Procedures to Incorporate Mods to Integrated Leak Rate Test Procedure 1-PT-57-1 Scheduled for Completion by 871231)
- ML18011A761 + (Submits Suppl Response to Violation Noted in Insp Rept 50-400/94-21 Per 950106 Telcon.Util Informs That Review of Correspondence from Util to NRC Initiated Involving Initial Screening of Responses to GLs & NRC Bulletins)
- ML20095E133 + (Submits Suppl Response to Violations Noted in Insp Repts 50-348/94-28 & 50-364/94-28.Corrective Actions:Mov Setpoint Revised to Reflect New Thrust Requirements & Thrust Output Capabilities)
- ML20086G561 + (Submits Suppl Rev to Tech Specs Section 3.8.3.1,pp 3/4 8-15 Re Footnote & Bases Expansion)
- ML20063E576 + (Submits Suppl Status Rept & Application for Extension of Commissions 930816 Order,Approving Transfer of License to Update Commission on Status of Official Bondholders Committee of Great Bay Power Corp Bankruptcy Proceeding)
- ML20247P233 + (Submits Suppl TS Design Features Section 5.6.4,capacity by Adding Max Heat Load for Fuel Stored in Refueling Canal & Prohibiting Storage of Fuel in Cask Storage Pit)
- ML20077F177 + (Submits Suppl ULNRC-3042 Re NRC Approval of ASME Code Case N-498-1 for Use at Plant)
- ML19242A302 + (Submits Suppl to ,Clarifying Use of Newer Editions of ASME III Code,Suppl Addenda & Code Cases in Lieu of Base Code)
- B13066, Submits Suppl to 1987 Annual Environ Operating Rept.One Environ Protection Plan Noncompliance Noted + (Submits Suppl to 1987 Annual Environ Operating Rept.One Environ Protection Plan Noncompliance Noted)
- ML19320C974 + (Submits Suppl to 800130 Water Proccessing & Processed Water Disposition Plan for 1980 (Revision 2) & 1981 (Revision 1). One Oversize Drawing Available in Central Files Only)
- ML20081A353 + (Submits Suppl to 830901 Comments on Idvp Final Rept & Sser 18 Re Reissuance of Suspended License for Fuel Loading & Low Power Operation.License Reissuance Opposed. Certificate of Svc Encl)
- ML20199L929 + (Submits Suppl to 860516 Response to Violations Noted in Insp Repts 50-424/86-09 & 50-425/86-04.Corrected P&Ids Used for Walkdowns as of 860620.Flow Chart, Document Consistency Flow, Encl)
- ML20213G015 + (Submits Suppl to 870427 Response in Opposition to Lilco Motion for Expedited Commission Consideration,W/Encl Answer of Suffolk County,State of Ny & Town of Southhampton to Lilco Second Renewed Motion for Summary Disposition)
- ML18005B016 + (Submits Suppl to 890222 Request for Amend to License NPF-63 Re RHR Min Flow Requirements During Refueling Operations. Tech Spec Change Request Revises Surveillance Requirement 4.9.8.2.2 to Impose Min Flow Requirement of 900 Gpm)
- ML18005B017 + (Submits Suppl to 890222 Request for Amend to License NPF-63 Re RHR Min Flow Requirements During Refueling Operations. Tech Spec Change Request Revises Surveillance Requirement 4.9.8.2.2 to Impose Min Flow Requirement of 900 Gpm)
- ML17305A275 + (Submits Suppl to 890327 Response to Violation Noted in Insp Rept 50-529/89-03.Schedules for Implementation of Revised Radiological Effluent (Re) Program & Associated Training Encl.Procedures Governing Re Activities Revised)
- A08283, Submits Suppl to 890727 Response to Generic Ltr 88-20, Suppl 1, Individual Plant Exams for Severe Accident Vulnerabilities + (Submits Suppl to 890727 Response to Generic Ltr 88-20, Suppl 1, Individual Plant Exams for Severe Accident Vulnerabilities)
- ML20076E307 + (Submits Suppl to 910315 Application for Amend to License NPF-30,revising Tech Spec 3.4.6.2 Re RCS Pressure Isolation Valves,Per 910808 Telcon)
- ML18100A626 + (Submits Suppl to 930611 Request for Amend Re Boron Concentration Reduction,In Response to NRC Concerns for Bases Used to Calculate Boron Concentration in RCS at Given Temp.Concentration Based on Listed WCAP Topical Repts)
- ML18100A627 + (Submits Suppl to 930611 Request for Amend Re Boron Concentration Reduction,In Response to NRC Concerns for Bases Used to Calculate Boron Concentration in RCS at Given Temp.Concentration Based on Listed WCAP Topical Repts)
- ML20108D500 + (Submits Suppl to 960126 TS Change Request for One Time Rev to TS 3.6.1.1,3.6.1.2,3.6.1.8 & 3.6.1.9,informing of Addl Compensatory Action to Be Taken to Provide Addl Protection to CR Personnel in Event of Significant RCS Leakage)
- LR-N970273, Submits Suppl to 970131 & 0314 Applications for Amends to Licenses DPR-70 & DPR-75,revising TS on Pressurizer Power Operated Relief Valves.Suppl Issued to State That Conclusion of NSHC Remains Valid + (Submits Suppl to 970131 & 0314 Applications for Amends to Licenses DPR-70 & DPR-75,revising TS on Pressurizer Power Operated Relief Valves.Suppl Issued to State That Conclusion of NSHC Remains Valid)
- ML20216E298 + (Submits Suppl to 970926 Application for Amends to Licenses NPF-11 & NPF-18 Re Addition of Ventilation Filter Testing Program to Ts,In Response to NRC Question 5 in)
- BSEP-95-0105, Submits Suppl to ASME Code Relief Request non-code Repair of SW Piping + (Submits Suppl to ASME Code Relief Request non-code Repair of SW Piping)
- B15168, Submits Suppl to Amend Request on 941209 Re TS SR for DG at Plant + (Submits Suppl to Amend Request on 941209 Re TS SR for DG at Plant)
- BSEP-96-0041, Submits Suppl to Amends to Licenses DPR-71 & DPR-62, Implementing performance-based Containment Lrt Requirements + (Submits Suppl to Amends to Licenses DPR-71 & DPR-62, Implementing performance-based Containment Lrt Requirements)
- ML20077S022 + (Submits Suppl to Application for Amend to Licenses NPF-72 & NPF-77 Re Main CR Ventilation Sys)
- ML18116A400 + (Submits Suppl to Earlier Repts in Accordance W/Ie Bulletin 79-13 Re Defective Feedwater Welds.Lists Welds W/Rejectable Indications.Radiography 99% Complete)
- ML20054F739 + (Submits Suppl to Evaluation of NUREG-0737,Item II.E.4.2(7), Containment Isolation Dependability - Isolation on High Radiation. Calculation of Acceptable Offsite Doses Is Acceptable Alternative to NRC Position)
- NPL-98-0438, Submits Suppl to Extend Commitment Date Re Response to Violations Noted in Insp Repts 50-266/97-15 & 50-301/97-15. Hardware Changes to Enhance Availability of Lights Have Been Identified + (Submits Suppl to Extend Commitment Date Re Response to Violations Noted in Insp Repts 50-266/97-15 & 50-301/97-15. Hardware Changes to Enhance Availability of Lights Have Been Identified)
- IR 05000002/1998003 + (Submits Suppl to Insp Rept 50-002/98-03 Conducted on 981016-20.Inspectors Reviewed Operating Log Book Entries from 970304-0828,to Verify That Reactor Staffing Met Min Requirements of TSs)
- ML19354E870 + (Submits Suppl to Interim Rept of Investigation 89-02 in Matter of RA Fortuna)
- ML20087F341 + (Submits Suppl to License Amend Request Re Post Accident Monitoring TS Conformance to Std TS)
- CY-97-075, Submits Suppl to Licensee Original Re Post Shutdown Decommissioning Activities Rept.Encl Consists of New Addl Info for Aug 1997 Subject Rept + (Submits Suppl to Licensee Original Re Post Shutdown Decommissioning Activities Rept.Encl Consists of New Addl Info for Aug 1997 Subject Rept)
- ML20003H731 + (Submits Suppl to Mapleton Intervenors 810116 Presentation. Requests That Judicial Notice Be Taken of Executive Order 11514.NEPA Requires EIS to Be Prepared)
- 3F0997-01, Submits Suppl to NRC Ltr Re Protection Against Dynamic Effects of Loca.In Addition,Issue Being Tracked by NRC as Inspector Followup Item 50-302/95-15-02.W/one Oversize Drawing + (Submits Suppl to NRC Ltr Re Protection Against Dynamic Effects of Loca.In Addition,Issue Being Tracked by NRC as Inspector Followup Item 50-302/95-15-02.W/one Oversize Drawing)
- B15166, Submits Suppl to Original Amend Request on 950124 Re Acceptance Criterion for Measured RCS Flow Rate for four- Loop Operation + (Submits Suppl to Original Amend Request on 950124 Re Acceptance Criterion for Measured RCS Flow Rate for four- Loop Operation)
- B15131, Submits Suppl to Original Request Made by Util on 941208 Re Change to Alternate Testing Method of Approved Relief Requests + (Submits Suppl to Original Request Made by Util on 941208 Re Change to Alternate Testing Method of Approved Relief Requests)
- ML18136A006 + (Submits Suppl to Previous Rept Required by IE Bulletin 79-13.Provides List of Welds That Have Rejectable Indications)
- ML19345A340 + (Submits Suppl to Proposed Change 11 to Tech Specs,Modifying Arrangement & Location of Neutron Detectors Incorporated in Design of Special Tube Assemblies Re Irradiation of Reactor Vessel Matl Specimens)
- ML19345A320 + (Submits Suppl to Proposed Change 15 to Tech Specs,Adding Maint Instruction 506E4 Requiring Equipment Access Opening to Be Closed During Changes in Core Geometry)
- ML20137Z753 + (Submits Suppl to Proposed Change,Allowing Operation of Containment Purge Ventilation Sys During Modes 4 & 3 During Startup from Each Respective SG Replacement Outage)
- ML20154B093 + (Submits Suppl to RAI Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC Heat Removal Pumps, Per 980723 Telcon with NRC)
- ML19316B067 + (Submits Suppl to Re Organizational Changes to Be Incorporated in Nusco Nuclear Engineering & Operations Group Effective 800401 & QA Program Topical Rept Nu-QA-1)
- ML19323C984 + (Submits Suppl to Re Plans for Adding Auto Start to Motor Driven Emergency Feedwater Pump.Design Change Will Be Tested During Startup.Difficulties Have Arisen in Acquiring Environmentally & Seismically Qualified Timers)
- ML20128N361 + (Submits Suppl to Rejoinder to Licensee Response to 2.206 Petition .Full-scale Bus Drills Appropriate & Should Be Conducted W/O Prior Notice to Participants.Mayor of Harrisburg,Pa to PA Inst for Clean Air Encl)
- ML18139C311 + (Submits Suppl to Relief Request from ASME XI Requirement Re 10-yr Inservice Insp Intervals.Suppl Supports Continued Insp & Would Eliminate Duplicative Insps)
- LR-N970181, Submits Suppl to Request for Change to TSs Section 6.0, Administrative Controls Re Salem & Hope Creek Generating Station Units 1 & 2 + (Submits Suppl to Request for Change to TSs Section 6.0, Administrative Controls Re Salem & Hope Creek Generating Station Units 1 & 2)
- ML20151X020 + (Submits Suppl to Request for Change to Tech Specs Re Ultimate Heat Sink Temp Limits.Util Determined,Info Contained in Attachment to Ltr Does Not Alter Conclusions Reached in 10CFR50.92)