' I Vepco VIRGINIA ELECTRIC AND POWER COMPANY Surry Power Station
. /'I I:: I 27
. J '-: ~; L AlO : ~ D P. o. Box 315 Surry, Virginia 23883 July 24, 1979 Docket No:
50-280 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100
. I
- /
Atlanta, Georgia 30303
\\ ' ' '.
~ ~ ~ - ~--.J-~_i...:~-~~----;__.:_.,* j~.:~~
~':"".:'"-" __......,._ '-"~.......
Subject:
IoE. Bulletin No. 79-13
Dear Sir:
In accordance with the provisions of IE Bulletin 79-13, VEPCO supplements our earlier reports for Surry Power Station with the following:
As of this date, the following welds have rejectable indications:
"A" S.G.
Wf/3 Wi/4 Wf/5 W1113 "B" S.G.
Will Wl/10 "C" S.G.
Wf/5 Wf/6 Wl/11 Wl/9.
14-WFPD-17-601 Small area of rejectable porosity, (reported to NRC 07-16-79).
Two small linear indications in the root area, (reported to NRC 07-16-79).
Small area, lack of fusion - reject (reported 07-23-79).
Small areas of rejectable incomplete fusion (reported to NRC 07-12-79).
14-WFPD-13-601 Small area of rejectable porosity, (reported to NRC 07-12-79).
Small area of slag/incomplete fusion - reject 14-WFPD-9-601 Small area of rej ectable porosity, (reported to NRC 07-16-79).
Small area of rejectable incomplete fusion, (reported to NRC 07-16-79)..
Small area of rejectable incomplete fusion, (reported to NRC 07-16-79).
Small area of rejectable incomplete fusion, (reported to NRC 7-23-79).
7qo433 UL !lCIAL coh.
cp
"C" S.G.
Wlll3 W/114 2 -
July 24, 1979 14-WFPD-9-601 (Continued)
Small area of slag - reject (reported 07-23-79).
Small areas of slag/incorrect fusion - reject (reported Oi-23-79).
This completes the R.T. of all feedwater lines in #1 Containment.
Repair work is in progress.
The total number of rejectable welds is 12.
OYournw~*
. -r-~-
- w. L. Stewart Station Manager