Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137H544 + (Submits ISA Summary for Dcp,Replacing ISA Document Submitted to NRC on 970219)
- BECO-95-036, Submits ISI Plan for 1995 Refueling Outage 10 as Required by 10CFR50.55a + (Submits ISI Plan for 1995 Refueling Outage 10 as Required by 10CFR50.55a)
- BECO-LTR-96-091, Submits ISI Plan for 1996 on-line & 1997 Refueling Outage 11 + (Submits ISI Plan for 1996 on-line & 1997 Refueling Outage 11)
- 3F0396-08, Submits ISI Program Relief Request 95-030,Suppl 2,revising Response to RAI Re Reactor Vessel Stress in Structural Integrity Rept SIR-95-135 + (Submits ISI Program Relief Request 95-030,Suppl 2,revising Response to RAI Re Reactor Vessel Stress in Structural Integrity Rept SIR-95-135)
- ML20029D405 + (Submits ISI Special Rept of SG Tubes,Per Surveillance Requirement 4.4.4.5(b) of App a Tech Specs.Encl 1 Provides Steam Generator Internal Location Ref Guide)
- HNP-99-027, Submits ISI Summary Rept for CP&L Hnp.Rept Covers Insps Performed at HNP During Cycle 8 Operations,Including Refueling Outage 8 in Second 10-yr ISI Interval + (Submits ISI Summary Rept for CP&L Hnp.Rept Covers Insps Performed at HNP During Cycle 8 Operations,Including Refueling Outage 8 in Second 10-yr ISI Interval)
- ML20072H071 + (Submits IST Program Plan for Pumps & Valves Program Scope Update,In Response to Weakness Identified in Program Scope During Recent Regional Insps of IST Program (May 1993 at Braidwood & Jan 1994 at Byron))
- ML18153D377 + (Submits IST Program Relief Request Clarification,Per NRC SER for Plant ASME Section XI IST Program Plan,Received by .Relief Requests P-11 & P-1 Encl)
- BECO-93-142, Submits IST Program Relief Requests RV-42 & 43 for Review & Approval. Requests Necessary Due to Mods Made to Facility During Recent Refueling Outage. Relief Request RV-03 to Maintain Compliance W/Ansi/Asme OM-1 Also Encls + (Submits IST Program Relief Requests RV-42 & 43 for Review & Approval. Requests Necessary Due to Mods Made to Facility During Recent Refueling Outage. Relief Request RV-03 to Maintain Compliance W/Ansi/Asme OM-1 Also Encls)
- ML19246A721 + (Submits Identified Areas to Be Addressed During Seismic Pipestress Reanalysis)
- ML20153E679 + (Submits Illustration of B&W Boron Dilution Calculation Methodology)
- ML19345C641 + (Submits Immediate Rept Per IE Bulletin 80-17.On 801112, While Performing Periodic Test 2.1.8P,determined That Channels a & C Would Not Trip Turbine on High Exhaust Pressure.Channels a & C Recalibr & Sys Returned to Svc)
- U-602765, Submits Impact of Changes & Errors in ECCS Evaluation Methodology or Application,On Calculated Peak Fuel Cladding Temperature for Postulated LOCA for CPS + (Submits Impact of Changes & Errors in ECCS Evaluation Methodology or Application,On Calculated Peak Fuel Cladding Temperature for Postulated LOCA for CPS)
- ML20210E483 + (Submits Impact of Changes or Errors in ECCS Evaluation Models Used by W.Description of Changes, 1998 Annual Notification of Changes to W SBLOCA & Large Break LOCA ECCS Evaluation Models, Provided as Attachment 1)
- ML20198S416 + (Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide)
- ML20080M542 + (Submits Implementation Date for Requirements of Reg Guide 1.97,per Generic Ltr 82-33.Requirements Will Be Complied by End of Unit 2,Cycle 4 Outage Scheduled for 870902)
- ML20076J862 + (Submits Implementation Dates Associated W/Recently Issued TS Change Requests for Facility)
- ML19261F141 + (Submits Implementation Dates for Fire Protection Sys W/ Justification for Each Component)
- ML18004B678 + (Submits Implementation Ltr for Instrumentation Used to Detect Inadequate Core Cooling Sys,Per SER License Condition 8.Addl Calibr Data Will Be Collected at Various Power Levels Throughout Ascension to Full Power)
- ELV-03163, Submits Implementation Plan for ERDS Program,Per NUREG-1394, Rev 1 & 910813 Publication of Final Rule in Fr.All NRC Required Plant Parameters Will Be Transmitted from Existing Emergency Response Facility Computers to Pc Workstations + (Submits Implementation Plan for ERDS Program,Per NUREG-1394, Rev 1 & 910813 Publication of Final Rule in Fr.All NRC Required Plant Parameters Will Be Transmitted from Existing Emergency Response Facility Computers to Pc Workstations)
- ML20085L172 + (Submits Implementation Program Plan for Emergency Response Data Sys,Per NUREG-1394.Site Survey Questionnaire, Containing Data Point Library & Plant Attribute Library, Will Be Submitted by 920310)
- ML20138M155 + (Submits Implementation Rept Re NUREG-0737,Item II.F.2, Inadequate Core Cooling Instrumentation Per NRC .Saturation Margin Meters Installed Before Refuel III & operational.Pressure-temp Display Added to SPDS)
- ML19247B801 + (Submits Implementation Schedule Re Measurement Control Plan)
- ML20203L346 + (Submits Implementation Schedule for ATWS Mitigating Sys Actuation Circuitry,Per NRC SER on Westinghouse Owners Group Generic Design.Circuitry Will Be Installed & Functional Prior to Jul 1989)
- ML20063Q247 + (Submits Implementation Schedule for Cable Tray Support Program.Util Proposes Deferral of Portion of Remaining Activities Until After Current Unit 2 Cycle 4 Refueling Outage,Per 900817 Meeting.Tva Presentation Matl Encl)
- ML20078E128 + (Submits Implementation Schedule for GL 93-04, Rod Control Sys Timing)
- ML19350C922 + (Submits Implementation Schedule for Items Affected by NUREG-0696,in Response to Generic Ltr 81-10.Requirements for Emergency Response Facilities,Per TMI Action Plan Item III.A.1.2,to Be Implemented Via License Application Process)
- ML20003A894 + (Submits Implementation Schedule for Mods to Scram Sys Described in Util 801027 & 1215 Ltrs.Schedule Is Dependent Upon Optimum Procurement of Environmentally & Seismically Qualified Differential Pressure Transmitters & Valves)
- ML20151L239 + (Submits Implementation Schedule for Proposed Fire Protection Mod of Auxiliary Bldg HVAC Sys.Advises of Manpower Adjustments to Accomodate 881020 Unit 2 Outage)
- ML20129J599 + (Submits Implementation Schedule for Rod Control Sys Changes in Response to GL 93-04, Rod Control System Failure & Withdrawal of Rod Control Cluster Assemblies)
- L-88-441, Submits Implementation Schedules for Generic Ltr 86-10, Implementation of Fire Protection Requirements. Integrated Schedule Monthly Summary Rept Will Provide Updated Schedule Changes & Restatus Mod 25 Re Alternate Shutdown Panel + (Submits Implementation Schedules for Generic Ltr 86-10, Implementation of Fire Protection Requirements. Integrated Schedule Monthly Summary Rept Will Provide Updated Schedule Changes & Restatus Mod 25 Re Alternate Shutdown Panel)
- ML19296C316 + (Submits Implementation Schedules for TMI Lessons Learned Task Force short-term Requirements Re Environ & Seismic Testing of Acoustic Accelerometers & Charge Amplifiers)
- ML20096C024 + (Submits Implementation Status Rept of Resolutions for Dcrdr Heds,Per 861126 & s.Results of Evaluation of Heds & Justification for Deletions from Dcrdr Resolution Effort Will Be Provided by 930205)
- ML13322A968 + (Submits Implementation Status for TMI Action Plan Items at Facilities,Per NRC)
- L-90-380, Submits Implementation Status,Per Generic Ltr 83-28,Items 3.2.1 & 3.2.2 Re Generic Implications of Salem ATWS Events. Summary of Actions Completed Listed + (Submits Implementation Status,Per Generic Ltr 83-28,Items 3.2.1 & 3.2.2 Re Generic Implications of Salem ATWS Events. Summary of Actions Completed Listed)
- JPN-96-015, Submits Implementation of Interim Recommendations of BWR Owner Group Regulatory Response Group Re Viton CRD SSPV Response Time Delay + (Submits Implementation of Interim Recommendations of BWR Owner Group Regulatory Response Group Re Viton CRD SSPV Response Time Delay)
- ML19341A704 + (Submits Implemented Changes Called for by NUREG-0619, BWR Feedwater Nozzle & Control Rod Drive Return Line Nozzle Cracking. Implementation Program Includes Sys Mod,Feedwater Nozzles,Operating Procedures,Insp & Leak Testing)
- ML20023B799 + (Submits Improvement Program to Decrease Personnel Error/ action-related Events.Two Types of Personnel Awareness Programs Initiated.Training Staff Increased & Instructor Matls Upgraded)
- ML20204H268 + (Submits Inadequate Core Cooling Instrumentation (Icci) Sys Implementation Ltr Rept.Application for Amend to License DPR-40 Re Icci Will Be Submitted)
- ML20217J699 + (Submits Incident & Event Info Re Use of Nuclear Material Events Database (NMED) as Central Listing of Lost or Stolen Sealed Source & Devices)
- ML20211M932 + (Submits Incident & Event Info on SP-99-057 Re National Domestic Preparedness Office Activities)
- ML20212E285 + (Submits Incident Investigation Team Roster Update. Informs That Some Current Roster & Proposed New Candidates Have Not Retained Clearances)
- ML20082H390 + (Submits Index of Allegations of Intimidation/Harassment of Util Employees,Per ASLB Oct 1983 Hearing Session Request. Allegations Either Adequately Addressed in Record or Invalid Prima Facie)
- ML20148K807 + (Submits Individual Permit Application for Temporary Operation of Detroit Diesel Ptms 900 Compressor.Fee Paid)
- ML20148K811 + (Submits Individual Permit Application for Temporary Operation of Detroit Diesel Ptms 900 Compressor.Fee Paid)
- ML20138E263 + (Submits Individual Plant Exam in Accordance W/Gl 88-20, Individual Plant Exam for Service Accident Vulnerabilities - 10CFR50.54(f) & NUREG-1335, IPE Guidance)
- ML19312C154 + (Submits Individual Radiation Exposure Rept for K-Mac Janitorial Svc Employee,Tg Mize,Terminated 760531.W/o Encl)
- ML19317D479 + (Submits Individual Radiation Exposure Repts for Terminated Employees & Temporary Personnel Whose Assignments Completed)
- ML20078L787 + (Submits Individuals Currently Included in NRC Operator License Tracking Sys That No Longer Require Operator Licenses at Plant Unit 3 Ses)
- ML20117N852 + (Submits Industrial Security Plan Rev 15,App A.Changes Reflect Operation of Sdms Will Be Submitted IAW Requirements of 10CFR50.54(p).Plan Withheld)
- ML16341B656 + (Submits Info & Account of OL Status in Response to on Behalf of Constituent B Delano)