ML18004B678
| ML18004B678 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/07/1987 |
| From: | Zimmerman S CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NLS-86-487, NUDOCS 8701140304 | |
| Download: ML18004B678 (3) | |
Text
REQ I'NFORMATION DISTRIBU N
STEM (R IDS>
ACCESSION,NBR: 8701140304 DQC. DATE: 87/Ol/OP NQTARIZED:
NO DOCKET 4 FACIL:50-'400 Bhearon Harris Nuclear Power Plant~
Unit 1> Carolina 05000400 AUTH.,NAIIE AUTHOR AFFILIATION ZlNNERNANiB. R.
Carolina Poller Zc Light Co.
/
RECIP. NANE RECIPIENT AFFlLIATION DENTON> H. R.
Office of Nuclear Reactor.Regulationi Director (post 851125
SUBJECT:
Discusses implementation of instrumentation used to 'detect inadequate core cooling sos> per SER License Condition 8. Addi calibr data vill be collec+ed at vaT ious power levels throughout ascension to fUll poUJer.
DISTRIBUTION CODE:
B001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amd+s 8c Related Correspondence NOTES: Application for permit reneual filed.
05000400 REC IPIENT ID CODE/NAME PWR-A EB PWR-A FOB PWR-A PD2 PD PWR-A PSB INTERNAL ACRB 41 ELD/HDB1 IE/DEPER/EPB 36 NRR BWR ADTS I
NRR E
04 EXTERNAL: BNL(ANDTS ONLY)
LPDR 03 NSIC 05 COPIEB LTTR ENCL RECIPIENT ID CODE/NAME PWR-A EICBB PWR-A PD2 LA BUCKLEY'S B 01 PWR-A RSB ADM/LFNB IE F1LE IE/DGAVT/GAB 21 NRR PWR-B ADTB NRR/DHFT/NTB RN/DDANI /MIB DNG/DSS (ANDTS)
NRC PDR 02 PNL GRUEL> R COPIES LTTR ENCL 2
2 1
1 2
1 1
1 1
1 1
TOTAL NUMBER OF COPIES REGUlRED:
LTTR 33 ENCL 88
~ ~
he I, ]r",
!l
.l*'e')
r
)
~j h
'r t$
~
h vv
~v P
'h fr' Ih'gWpfhj(r rehr r
',i>>
eC I
~ t ter.
il
~e I
II H
E e
'r h
lh 'r v
r '$r
I'
" v eh ~i lh
Pg
- ggQg, Carolina Power & Light Company SERIAL: NLS-86-087 JAN 07 1987 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-000/LICENSE NO. NPF-53 INADEQUATECORE COOLING INSTRUMENTATION
Dear Mr. Denton:
Carolina Power R Light Company (CPRL) hereby submits an implementation letter for the instrumentation used to detect inadequate core cooling at the Shearon Harris Nuclear Power Plant.
This implementation letter is being submitted as required by Safety Evaluation Report (SER) License Condition No. 8 and as committed to in CPRL letter dated May 29, 1986.
The instrumentation used to detect inadequate core cooling include the following three subsystems:
(1) subcooling margin calculated by the Emergency Response Facilities Information System (ERFIS) computer, (2) core exit thermocouple system, and (3) reactor vessel level instrumentation system (RVLIS). This instrumentation has been installed and preoperational tests have been completed.
Startup tests and calibrations for which the core must be in place have also been completed.
This instrumentation is operational as required by this license condition. However, it should be noted that additional calibration data must be collected at various power levels throughout the ascension to fullpower.
If you have any questions on this subject or require additional information, please contact me.
Yours very truly, 3DK/bmc (51053DK) cc:
Mr. B. C. Buckley (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Dr. 3. Nelson Grace (NRC-RII) 8701140304 870107 PDR ADOCK 05000400 P
PDR S R. Zi merman nager Nuclear Licensing Section ool
>0 411 Fayettevilte Street 8 P. O. Box 1551 8 Raleigh, N. C. 27602