PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 1881 1981 PHILADELPHI A. PA.19101 1215)841-5003 JOSEPH W. G ALLAGHEn stacimic recoucT om espantessm?
January 21, 1981 Re: Docket Nos. 50-277 50-278 NUREG 0619 Mr. Darrell G.
Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation US Muclear Regulatory Commission
'4a sh i n g t on, DC 20555
Dear Mr. Eisenhut:
This is a follow-up to our le"ter sent to you on December 24, 1980, and concerns NUREG C519, "MiR Feedwater Nozzle and Control
~
Rod Drive Return Line (CRDRL) dezzle Cracking".
Philadelphia Electric Company has been following the technical developments concerning the nozzle cracking problems described in NUREG 0619 on a continuing basis and has already implemented many of the changes called for by the NUREG.
The following is a point by point description of our implementation program at Peach Bottom:
Part I-Feedwater Nozzles 1.
flozzle Modification
'de have completely implemented clad removal and installation of " triple sleeva" spargers on Peach Bottom Unit No. 2 during the Spring of 1980 and have scheduled the same job for Unit No. 3 for the Spring of 1931.
2.
System-Modification - the following modifications are j
scheduled for completion prior to June 30, 1983 g
s
\\
1I 8101270 M p
Pago=2 A.
Feedwater system low flow controller.
A " low-flow" control valve will be provided on one of the three discharge lines from the reactor feed pumps on each reactor unit.
The control valve will be installed in-parallel with the existing feed pump discharge valve and will be provided with controls to more effectively control reactor water level during startup, eliminating the need to " jog" the feed pumps, B.
Reroute of'the reactor water cleanup system.
The reactor water cleanup system return line to the reactor will be modified such that the RWCU flow is returned to both feedwater lines.
3 Operating Procedures A.
Reactor Water Cleanup flow will be directed to_all feedwater nozzles during low flow conditions prior to turbine loading after the system modifications described in 2B above are implemented.
3.
The Peach Bottom heat cycle consists of three trains of five feedwater heaters havin; drains which cascade to the next lower pressure heater.
Sufficient extraction steam pressure must be available to establish proper drain flous during unit startup.
Normally, sufficient pressure does not exist until the turbine has been loaded to 103.
Therefore, it is-our intent to place the feedwater heaters in service as soon as practical with the fifth heaters valved into service at about 10%
turbine load, the fourth heater at about 20%, and the third heater at approximately 25% turbine load.
C.
A low-flow feedwater flow control system will be provided on one of the three reactor feed pumps for each reactor unit as noted in 2A.
This system will facilitate control of reactor water level during unit startups such that. feed pump on-off operations will be eliminated and feedwater temperature fluctuations will be minimized.
p Pago 3 D.
It is the: intent of Philadelphia Electric Company to operate the' Peach Bottom units to minimize the amount of time during which highly subcooled feedwater is supplied to the reactor vessel.
4 Inspection Ne will initiate an inspection program as described in Table 2' of the NUREG for " triple-sleeve spargers with two piston-ring seals, clad removed".
5.
Leak Testing - We currently have no plans-to install an on-line leak detection system, however, we will apprise the Commission should we decide to install such a system.
Part II Control Rod Drive Return Line (CRDRL) Nozzles (Item numbers from Section 8 of NUREG 0619) 1.
Mozzle Inspections - The nozzle on each unit was inspected with liquid penetrant and repaired.
This inspection was repeated at the time each nozzle was capped after sustained operation in the isolated mode.
2.
CRDRL Valved Out - Both units were operated with the l
CRDRL valved out as an interim measure, but this is no longer necessary since they were cut and capped.
3 Rerouting of the CRDRL - We have chosen to not exercise the option of rerouting the CRDRL.
4 Cap CRDRL Mozzle Without Reroute - The Peach Bottom vessels are both 251-inch BWR/4's and as such we have chosen to exercise the option of not rerouting the CRDRL.
I A.
In accordance with the Staff Position we have installed equalizer valves between the cooling water header and the exhaust water header on Unit No. 2 and have scheduled a similar installation on Unit No. 3 in the Spring of 1931.
B.
Since our exhaust water header is stainless steel, the addition of flush ports is not necessary.
Pego 4 C.
The replacement of carbon steel-pipe in the flow stabilizer loop with stainless steel.-is not considered applicable to Peach Bottom due to its unique system configuration.
Filters, with high differential pressure. alarms, are presently installed for protection of the~ control rod drives from the carbon steel ~corrosio.n product carryover from the stabilizer loop.
.These filters are not in a location where their clogging would interfere with the cooling flow.
We completed testing on Unit No. 2, after all modifications were completed, to verify concurrent two CRD pump operation, satisfactory CRD operation, and required return flow capacity to the vessel.
Similar testing will be performed on Unit No. 3 at the-completion of the system modification in 1931.
5.
Pressure Coatr el Station to Cooling Water Header - The pressure control station is not required if the CRDRL is not rerouted.
6.
This section is not applicable to operating plants.
l l
l 7.
Procedure for Achieving Maximum'CRD flow to the RPV - We have established an operating procedure for achieving flow to the RPV in excess of the boil-off-rate.
l It is our determination that the above steps, when completed, will constitute compliance with the objectives of NUREG 0619 as applicable to Peach Bottom Units-2 and 3. If you have any questions or require additional information, do not hesitate to contact us.
j i
l Very truly yours, d
W
m
-. y (k.
.g
'.'Cn?"f n'"IC A LT't l0 F DF' t'9 vLV O'T A ' t r-
.ns.
. C 9 ff?t T Y.n y n*;t L Angt o;[I A l.,
2T. ','. P.a l l a r,h e r, keina-f i r s t. dei l ar svo rn, ' d e po s e s and 9 M '? 9
- That he is'"anner of'tSe "lectric ursduction 7e,artment
~ o f ' 1'hll a d e lp hia tiectric Conoany: that-he Sas read.rhe forea,oina resannse concerning "rinen - 0 519 and ' nous the contents tSereof:
and that th e statenents and natters. set. forts therein are t rtie
-and correct to the best of his Ic n o w l e d a e, infornation an! Selief.
LJ 0 &(w 3
~
v a
9ubscribed and.svorn to 4 l S$
A before ne.this day of
" ~
13 33 i
"o y 'uhlic 9
9 o 3e D,W 1
Eu serH-43 d j.
7
, netvy c.c. m %. -
~~
b yy Comm ten v_ s.m. a. a 'gu
.\\.
s 5 e-e