Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20011A307 + (Second Interim Significant Const Deficiency Rept 26 Re Feedwater Isolation Valves - Temp Maint of Actuators,Anchor Darling.Supplier Submitted Drawings for Shrouds & Space Heaters to Be Installed.Final Rept Expected by 820615)
- ML20023C362 + (Second Interim Significant Const Deficiency Rept Scd 71 Re Failure to Properly Review Condition Identification & Work Authorization for Reportability.Initially Reported on 830211.Forms Being Reviewed.Final Rept Expected by 830815)
- ML20086T440 + (Second Interim Significant Const Deficiency Rept 95 Re HPSI Pumps A/Ab Failing to Start on Safety Injection Actuation Signal.Final Rept Will Be Submitted by 840330)
- ML20077D107 + (Second Interim Significant Const Deficiency Rept 76 Re Damage to Pressurizer Heaters During Hot Functional Testing. Thirty Pressurizer Heaters Scheduled for Replacement by 830815.Final Rept Will Be Submitted by 830915)
- ML20083F637 + (Second Interim Significant Const Deficiency Rept 92, HPSI Sys Performance. HPSI Pump a Stage Channel Rings 5,7 & 8 Found Out of Spec & Machined to within Spec.Next Rept by 840201)
- ML20052D805 + (Second Interim Significant Const Deficiency Rept 47 Re GE AKR-30/50 Circuit Breakers Closing Spring Screw.Final Rept Will Be Submitted by 820531 Rather than 820430)
- ML20083N208 + (Second Interim Significant Const Deficiency Rept 99 Re Safety Injection Tank Isolation Valve.Vendor Response to 840327 Insp Awaited.Final Rept Will Be Submitted by 840427)
- ML20087D261 + (Second Interim Significant Const Deficiency Rept 97 Re Diesel Generator B Turbocharger Failure.Official Response from Cooper Energy Svcs Re Cause to Be Completed by Late Mar 1984.Final Rept Will Be Submitted on 840406)
- ML20071J969 + (Second Interim Significant Const Deficiency Rept 77 Re Inadequate Containment Purge Valve Closure Time & Flow Rate.Hardware Corrective Action Complete.Final Rept Will Be Submitted by 830630)
- ML20084H380 + (Second Interim Significant Const Deficiency Rept 103 Re Radflex Wall Penetrations.Insp & Repair of Nine Remaining Penetrations Scheduled to Be Completed by Early May 1984. Final Rept Due by 840515)
- ML20083N834 + (Second Interim Significant Const Deficiency 102,re Failure to Install Dowels & Shear Blocks.Corrective Action & Documentation Review Scheduled to Be Completed in mid-Apr 1984.Final Rept Will Be Submitted on 840427)
- ML20053E894 + (Second Interim Significant Const Deficiency Rept 45 Re Akr 50 Relay Bell Switch Mounting Failure.Required Matls Presently Onsite Awaiting Installation.Most Devices Energized Making Replacement Difficult.Final Rept by 820630)
- ML20080M111 + (Second Interim Significant Const Deficiency Rept 86 Re Burned 3A-S Safety Inverter Output Capacitor Wiring. Supporting Documentation Under Review W/Expected Completion by 831007.Final Rept Expected by 831019)
- ML20083P735 + (Second Interim Significant Const Deficiency Rept 100 Re Terminations to Knox Fuse Blocks,Ge 4,160-volt Switchgear. Corrective Action & Insps Completed.Documentation Review Scheduled for Completion on 840413 & Final Rept by 840419)
- ML20073P361 + (Second Interim Significant Const Deficiency Rept 63 Re Procurement of Spare/Replacement Parts.Review Expanded to Include Purchase Orders for Plant Equipment & Consumables Prior to 820701.Final Rept to Be Submitted by 830729)
- ML20072F248 + (Second Interim Significant Const Deficiency Rept 74 Re T-B Undersize Schedule 80 Socket Welds.All Rework Completed Except for Two Flanges.Final Rept Expected by 830729)
- ML20087G228 + (Second Interim Significant Const Deficiency Rept 94 Re Chemical Vol Control Sys Heat Trace Temp Drift.Corrective Action & Documentation Review Scheduled for Completion by Late Mar 1984.Final Rept Will Be Submitted by 840406)
- ML20076E426 + (Second Interim Significant Deficiency Rept 82-04 Re Potential Problem in Westinghouse Solid State Protection Sys.Initially Reported on 820806.Design Changes Being Reviewed.Next Rept Expected by 830731)
- ML20066B915 + (Second Interim Significant Deficiency Rept Re Contact Leads on Hma Relays Supplied by Ge.Initially Reported on 820818. Insp of All Relays Completed 820930 W/No Defects Noted.Rept for Hma Relays Will Be Submitted on 831031)
- ML20084A156 + (Second Interim Significant Deficiency Rept 107 Re Defective Agastat GP Relays.Initially Reported on 831129.Caused by Inadequate Spring Tension on Movable Contact Arm & Corrosion Buildup on Contact Surfaces.Final Rept in 30 Days)
- ML20085H609 + (Second Interim Significant Deficiency Rept 83-08 Re Impact of Thick Wall Fittings on Diesel Generator Exhaust Piping Sys.Initially Reported on 830627.Corrective Action Awaiting Engineering Evaluation.Next Rept Will Be Submitted 831028)
- ML19354C401 + (Second Interrogatories Directed to Applicants Re Encl Preliminary Evacuation Time Study of Plume Exposure Emergency Planning Zone Around Wh Zimmer Nuclear Power Station,Unit 1. W/Certificate of Svc)
- ML20053D056 + (Second Interrogatory for Onsite Insp.Certificate of Svc Encl.Related Correspondence)
- ML022750090 + (Second Interval ASME Section XI Inservice Inspection Program Plan Revision 1)
- ML20069A797 + (Second Interval ISI Plan, Rev 5 ISI Program,Rev 3)
- ML20091P464 + (Second Interval ISI Program Plan)
- ML20072P671 + (Second Interval Inservice Insp Program Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept)
- ML20092P561 + (Second Interval Inservice Insp Program, Final Rept)
- ML20151Y280 + (Second Interval Inservice Insp Program,Cooper Nuclear Station, Technical Evaluation Rept)
- ML18155A273 + (Second Interval Inservice Insp Program,Class 1,2 & 3 Components & Supports)
- ML20210L271 + (Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept)
- ML20155F814 + (Second Interval Inservice Insp Program,Haddam Neck Plant Technical Evaluation Rept)
- RS-04-168, Second Interval Inservice Inspection Program Relief Request 12R-50 + (Second Interval Inservice Inspection Program Relief Request 12R-50)
- RS-04-104, Second Interval Inservice Inspection Program Relief Request I2R-46 + (Second Interval Inservice Inspection Program Relief Request I2R-46)
- RS-05-023, Second Interval Inservice Inspection Program Relief Request I3R-01 + (Second Interval Inservice Inspection Program Relief Request I3R-01)
- ML022700137 + (Second Interval, Third Period Refueling Outage-12, Inservice Inspection Summary Report)
- ML20009D939 + (Second Issue of Criteria for Re-Evaluation of Concrete Masonry Walls for IE Bulletin 80-11)
- ML17207A373 + (Second Joint Motion for Addl Suspension of Discovery Procedures Until 791101.ASLB 790423 Order Granting Delay Until 790801 Has Allowed Negotiations to Be Conducted. Negotiations Should Be Continued.Certificate of Svc Encl)
- ML18319A013 + (Second Joint Status Report)
- ML18319A012 + (Second Joint Status Report)
- ML17145A317 + (Second Joint Status Report (DC Cir.)(Case No. 16-1004) 05/23/2017)
- ML16159A261 + (Second Joint Status Report Regarding Track 2 Schedule Deferral)
- ML20248D240 + (Second Joint Status Rept.* Discovery in Proceeding Commenced W/Each Party in Proceeding Responding to Initial Request for Production of Documents & Four Preliminary Depositions Taken by Licensee During Wks of 890904 & 11.W/Certificate of Sv)
- ML021280419 + (Second Letter to Dr. Yehia F. Khalil - Level 1, Revision 3 Standardized Plant Analysis Risk (SPAR) Model for the Millstone 3 Plant)
- 05000275/FIN-2010007-06 + (Second Level Undervoltage Relay Time Delay to Initiate Load Shed and Sequencing Upon the Diesel Generator is Adequate to Assure Plant Safety)
- PMNS20200635, Second Meeting on Draft Interpretive Rule for Vllw Disposal Activities + (Second Meeting on Draft Interpretive Rule for Vllw Disposal Activities)
- ML20127D090 + (Second Meeting on Nuclear Regulatory Matters Between Us & Japan, Japanese Presentation (First Day))
- ML20127D108 + (Second Meeting on Nuclear Regulatory Matters Between Us & Japan, Japanese Presentation (Third Day))
- PMNS20220359, Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) + (Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood))
- ML031420831 + (Second Meeting with South Texas Project to Discuss STP 1, Reactor Vessel Bottom Mounted Instrument Penetration Leakage Issue)
- ML20132A829 + (Second Memo Re Discovery Matters Concerning Univ of Houston Addressed to Author in Capacity as Tx Pirg Director.Notes Resignation from Position as of 790601.Forwards)