Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Second Interval ISI Program Plan". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20011A307  + (Second Interim Significant Const Deficiency Rept 26 Re Feedwater Isolation Valves - Temp Maint of Actuators,Anchor Darling.Supplier Submitted Drawings for Shrouds & Space Heaters to Be Installed.Final Rept Expected by 820615)
  • ML20023C362  + (Second Interim Significant Const Deficiency Rept Scd 71 Re Failure to Properly Review Condition Identification & Work Authorization for Reportability.Initially Reported on 830211.Forms Being Reviewed.Final Rept Expected by 830815)
  • ML20086T440  + (Second Interim Significant Const Deficiency Rept 95 Re HPSI Pumps A/Ab Failing to Start on Safety Injection Actuation Signal.Final Rept Will Be Submitted by 840330)
  • ML20077D107  + (Second Interim Significant Const Deficiency Rept 76 Re Damage to Pressurizer Heaters During Hot Functional Testing. Thirty Pressurizer Heaters Scheduled for Replacement by 830815.Final Rept Will Be Submitted by 830915)
  • ML20083F637  + (Second Interim Significant Const Deficiency Rept 92, HPSI Sys Performance. HPSI Pump a Stage Channel Rings 5,7 & 8 Found Out of Spec & Machined to within Spec.Next Rept by 840201)
  • ML20052D805  + (Second Interim Significant Const Deficiency Rept 47 Re GE AKR-30/50 Circuit Breakers Closing Spring Screw.Final Rept Will Be Submitted by 820531 Rather than 820430)
  • ML20083N208  + (Second Interim Significant Const Deficiency Rept 99 Re Safety Injection Tank Isolation Valve.Vendor Response to 840327 Insp Awaited.Final Rept Will Be Submitted by 840427)
  • ML20087D261  + (Second Interim Significant Const Deficiency Rept 97 Re Diesel Generator B Turbocharger Failure.Official Response from Cooper Energy Svcs Re Cause to Be Completed by Late Mar 1984.Final Rept Will Be Submitted on 840406)
  • ML20071J969  + (Second Interim Significant Const Deficiency Rept 77 Re Inadequate Containment Purge Valve Closure Time & Flow Rate.Hardware Corrective Action Complete.Final Rept Will Be Submitted by 830630)
  • ML20084H380  + (Second Interim Significant Const Deficiency Rept 103 Re Radflex Wall Penetrations.Insp & Repair of Nine Remaining Penetrations Scheduled to Be Completed by Early May 1984. Final Rept Due by 840515)
  • ML20083N834  + (Second Interim Significant Const Deficiency 102,re Failure to Install Dowels & Shear Blocks.Corrective Action & Documentation Review Scheduled to Be Completed in mid-Apr 1984.Final Rept Will Be Submitted on 840427)
  • ML20053E894  + (Second Interim Significant Const Deficiency Rept 45 Re Akr 50 Relay Bell Switch Mounting Failure.Required Matls Presently Onsite Awaiting Installation.Most Devices Energized Making Replacement Difficult.Final Rept by 820630)
  • ML20080M111  + (Second Interim Significant Const Deficiency Rept 86 Re Burned 3A-S Safety Inverter Output Capacitor Wiring. Supporting Documentation Under Review W/Expected Completion by 831007.Final Rept Expected by 831019)
  • ML20083P735  + (Second Interim Significant Const Deficiency Rept 100 Re Terminations to Knox Fuse Blocks,Ge 4,160-volt Switchgear. Corrective Action & Insps Completed.Documentation Review Scheduled for Completion on 840413 & Final Rept by 840419)
  • ML20073P361  + (Second Interim Significant Const Deficiency Rept 63 Re Procurement of Spare/Replacement Parts.Review Expanded to Include Purchase Orders for Plant Equipment & Consumables Prior to 820701.Final Rept to Be Submitted by 830729)
  • ML20072F248  + (Second Interim Significant Const Deficiency Rept 74 Re T-B Undersize Schedule 80 Socket Welds.All Rework Completed Except for Two Flanges.Final Rept Expected by 830729)
  • ML20087G228  + (Second Interim Significant Const Deficiency Rept 94 Re Chemical Vol Control Sys Heat Trace Temp Drift.Corrective Action & Documentation Review Scheduled for Completion by Late Mar 1984.Final Rept Will Be Submitted by 840406)
  • ML20076E426  + (Second Interim Significant Deficiency Rept 82-04 Re Potential Problem in Westinghouse Solid State Protection Sys.Initially Reported on 820806.Design Changes Being Reviewed.Next Rept Expected by 830731)
  • ML20066B915  + (Second Interim Significant Deficiency Rept Re Contact Leads on Hma Relays Supplied by Ge.Initially Reported on 820818. Insp of All Relays Completed 820930 W/No Defects Noted.Rept for Hma Relays Will Be Submitted on 831031)
  • ML20084A156  + (Second Interim Significant Deficiency Rept 107 Re Defective Agastat GP Relays.Initially Reported on 831129.Caused by Inadequate Spring Tension on Movable Contact Arm & Corrosion Buildup on Contact Surfaces.Final Rept in 30 Days)
  • ML20085H609  + (Second Interim Significant Deficiency Rept 83-08 Re Impact of Thick Wall Fittings on Diesel Generator Exhaust Piping Sys.Initially Reported on 830627.Corrective Action Awaiting Engineering Evaluation.Next Rept Will Be Submitted 831028)
  • ML19354C401  + (Second Interrogatories Directed to Applicants Re Encl Preliminary Evacuation Time Study of Plume Exposure Emergency Planning Zone Around Wh Zimmer Nuclear Power Station,Unit 1. W/Certificate of Svc)
  • ML20053D056  + (Second Interrogatory for Onsite Insp.Certificate of Svc Encl.Related Correspondence)
  • ML022750090  + (Second Interval ASME Section XI Inservice Inspection Program Plan Revision 1)
  • ML20069A797  + (Second Interval ISI Plan, Rev 5 ISI Program,Rev 3)