ML20087G228
| ML20087G228 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/01/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 94, W3K84-0430, W3K84-430, NUDOCS 8403190368 | |
| Download: ML20087G228 (2) | |
Text
r g
1 Lo u s siama
,42 o<m,0Noe s1
<<1 POWER & LIGHT p o Box coos. NEW ORLEANS LOUISIANA 70174 1504) 366 2345 U$0$lOY$
- h. arch 1, 1984 WW A A- 0430
% M @ B DWES'^)5 o7 94 i
MAR - 91984
! I Mr. John T. Collins qj Regional Administrator, Region IV M
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
REFERENCE:
LP&L letter W3K84-1975 dated December 16, 1983
Dear Mr. Collins:
SUBJECT:
WaterfoJd SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 94
" Chemical Volume Control System (CVCS) Heat Trace Temperature brii "
Second Interim Report The above referenced letter indicated submittal of an Update or Final Report to the USNRC on March 1, 1984.
At the present time, corrective action, and documentation review are scheduled to be completed by late March 1984.
The Final Report will be submitted to the USNRC on April 6, 1984.
Very truly yours.
V $ - int $
T. F. Cerrets Corporate Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555
/
8403190368 840301 14-}7/I PDR ADOCK 05000382 4L S
PDR 8 I i
L
F.
Ai d-Mr. John T. Collins
-March 1, 1984 W3K84-0430 Page 2 ec:- Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operationc 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 I
h
,_..,-,,_.-,,_,,.,___._..,,-.,..,.-,._._,-..,,.,--..y_,
-