y*
I
'v LOUISIANA 142 DELARONDE STREET POWER & LIGHT P O. BOX 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345 g
UTruTIES SYSTEM April 5, 1984 W3K84-0816 Q-3-A35.07.102 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
REFERENCE:
LP&L letter W3K84-0507 dated March 9, 1984
}M@MDMS %
Dear Mr. Collins:
j
SUBJECT:
Waterford SES Unit No. 3 APR I3 m Docket No. 50-382 I
Significant Construction Deficiency No. 102
" Failure to Install Dowels and Shear Blocks" Second Interim Report The above referenced letter indicated submittal of the Final Report to the USNRC on April 6, 1984.
At the present time, remaining corrective action and the documentation review is scheduled to be completed in mid April 1984. The Final Report will be submitted to the USNRC on April 27, 1984.
Very truly yours, T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8404190302 840405 PDR ADOCK 05000 g -
S
~_L E d 7
. es
^D Mr. John T. Collins April 5, 1984 W3K84- 0816 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington. D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339
-Mr. W. A. Cross 7910 Wo'odmont Avenue Suite 1200 Bethasda,' Maryland 20814 7
a-s 1
{.}-;c t-2