Second Interim Significant Const Deficiency Rept 74 Re T-B Undersize Schedule 80 Socket Welds.All Rework Completed Except for Two Flanges.Final Rept Expected by 830729
ML20072F248
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/15/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, 74, Q-3-A35-07-74, Q-3-A35-7-74, W3I83-0210, W3I83-210, NUDOCS 8306270310
Download: ML20072F248 (1)


Text

__- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l Louisiana ,42 os< noNoe s1eeer P O W E R & L 1 G H T! R O. BOX 60n8

  • NEW ORLEANS. LOUISIANA * (504) 366 2345 70174 UTsuTIES SYSTEM June 15,1983 W3I83-0210 Q-3-A35.07.74 Mr. John T. Collins, Regional Administrator, Region IV 7-- -

U. S. Nuclear Regulatory Commission l

[F'!'.!'\ ]

611 Ryan Plaza Drive, Suite 1000 .I I-~

~ ~

?

  1. i Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382

[ g Significant Construction Deficiency Report No. 74 "T-B Undersize Schedule 80 Socket Welds" Second Interim Report

Reference:

LP&L Letter W3I83-Oll3 dated April 8, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than June 15, 1983.

At the present time all rework has been completed with the exception of two flanges. A Final Report will be submitted to the USNRC by July 29, 1983.

Very truly)yours,,

w~

F. J. Drummond Project Support Manager - Nuclear FJD/ MAL /grf cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director 4) Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Comnission Washington, D. C. 20555 8306270310 830615 PDR ADOCK 05000382 s eon 1e-27 h