I OUISIANA / 142 DELARONDE SmEU POWE R & LiG HT/ P O BOX 6008 + NEW OHLEANS. LOUISIANA 70174 * (504) 36&2345
- $ EON sENO i
June 3, 1982
\\&E G. D. McLENDON
\\\\,\\;
Senior Vice President 1-
. SN l N W3K-82-0315 Q-3-A35.07.45 Mr. John T. Collins, Regional Adpinistrator. Pr'-
h U. S. Nuclear Regulatory Commissivu 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
Subject:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 45 "AKR 50 Relay Bell Switch Mounting Failure" Second Interim Report
Reference:
- 1) LP&L Letter W3K-82-0080 to USNRC dated 2/11/82
- 2) Telecon R. G. Bennett (LP&L) to L. Martin (NRC), 6/1/82
Dear Mr. Collins:
The referenced letter submitted an interim repe..
,o the USNRC in which LP&L committed to providing a final report on Significant Construction Deficiency No. 45 by bby 28, 1982.
The materials required are presently on site in the LP&L Warehouse and awaiting installation. Most of the devices in question are released to LP&L and are energized, making coordination of repair or replacement difficult. We anticipate a completion date of June 30, 1982 at which time a final report will be issued.
If you have any questions, please let us know.
Very truly yours, l
/1,0 }M' u GDMcL/LLB/grf cc:
- 1) Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 0206100186 820603 PDR ADOCK 05000392 S