ML20071J969

From kanterella
Jump to navigation Jump to search
Second Interim Significant Const Deficiency Rept 77 Re Inadequate Containment Purge Valve Closure Time & Flow Rate.Hardware Corrective Action Complete.Final Rept Will Be Submitted by 830630
ML20071J969
Person / Time
Site: Waterford 
Issue date: 05/20/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0182, W3I83-182, NUDOCS 8305270194
Download: ML20071J969 (1)


Text

LOUISIANA 242 ouAnoNoe smeer P O W E R & i.I G H T P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345

'NiS$ sysY$

i May 20, 1983 W3183-0182 Q-3-A35,07.77 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 M Mk[_((D Arlington, Texas 76012 MAY 2 41983

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382

'9 Significant Construction Deficiency No. 77

" Inadequate Containment Purge Valves Closure Time and Flow Rate" Second Interim Report

REFERENCE:

LP&L letter W3183-0129 dated April 20, 1983 1

l

Dear Mr. Collins:

i l

The above referenced letter indicated submittal of a Final Report to the USNRC no later than May 20, 1983.

i l

At the present time, all hardware corrective action is complete and the l

supporting documentation is currently being reviewed for the Final Report.

l Therefore, a Final Report will be submitted by June 30, 1983.

1 Very truly yours, W"

F. J. Drummond Project Support Manager - Nuclear FJD/ MAL:keh cc:

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission l

Washington, D. C.

20555 l

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 8305270194 830520 PDR ADDCK 05000382 S

PDR

} G-j 7