ML20084H380
| ML20084H380 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/27/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| W3K84-0980, W3K84-980, NUDOCS 8405080038 | |
| Download: ML20084H380 (2) | |
Text
_
O 4
P O W E R & L I G H T! P O Box 6008
- NEW ORLEANS. LOUISIANA 70174
$4a ouAnoNoE srnar
- [504) 366 2345 g
Uflu TIE S SYSTEM April 27, 1984 W3K84-0980 Q-3-A35.07.103 Mr. John T. Collins Regional Administrator, Region IV
/
U. S. Nuclear Regulatory Commission pgy ~ f@
611 Ryan Plaza Drive, Suite 1000 d'
Arlington, Texas 76012
REFERENCE:
LP&L Letter W3K84-0631 dated March 16, 1984
Dear Mr. Collins:
1
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 103 "Radflex Wall Penetrations" Second Interim Report l
The above referenced letter indicated submittal of the Final Report to the USNRC on April 30, 1984.
1 At the present time, approximately 9 penetrations (RB3) remain to be inspected / repaired in the Fuel Handling Building, this is scheduled to be completed in early May 1984.
The Final Report will be submitted to the USNRC on May 15, 1984.
Very truly yours,
<sN 6D p
T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:SSTG cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8405080038 840427 m
- = ^*" "oain fng
Mr. John T. Collins April 27 1984 W3K84-0980 Page 2 cc:
Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Oricans, Louisiana 70130 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814 Russuma