ML20080M111

From kanterella
Jump to navigation Jump to search
Second Interim Significant Const Deficiency Rept 86 Re Burned 3A-S Safety Inverter Output Capacitor Wiring. Supporting Documentation Under Review W/Expected Completion by 831007.Final Rept Expected by 831019
ML20080M111
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/15/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
86, Q-3-A35.07.86, W3I83-0309, W3I83-309, NUDOCS 8310030468
Download: ML20080M111 (1)


Text

, __ _ . . . - -

E

[$u?$iYSSE LOUISIANA POWER & L1GHT

,42 0aAnONoe Srneer P O.. BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 . (504) 366-2345 September 15, 1983 g- W3183-0309

\

@@ Q-3-A35.07.86

\'

SEp 2 32 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commissio 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 86 "3A-S Safety Inverter Output Capicator Wiring Burned" Second Interim Report

REFERENCE:

LP&L Letter W3I83-0269 dated August 5, 1983 j

Dear Mr. Col _ ins:

The above referenced letter indicated submittal of a Final Report to the USNRC on September 15, 1983.

At the present time, all corrective action is complete, and the supporting documentation is under review and is expected to be completed by October 7, 1983.

A Final Report will be submitted on October 19, 1983.

Very truly yours, f

Mm F. J. Drummond Nuclear Services Manager cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555

2) Director 4) Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington D.C. 20555 8310030468 830915 -

PDR ADOCK 05000382 S PDR J e-27

_ _ - _ _ - _ _ _ _