ML20087D261

From kanterella
Jump to navigation Jump to search
Second Interim Significant Const Deficiency Rept 97 Re Diesel Generator B Turbocharger Failure.Official Response from Cooper Energy Svcs Re Cause to Be Completed by Late Mar 1984.Final Rept Will Be Submitted on 840406
ML20087D261
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/01/1984
From: Gerrets J, Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
97, W3K84-0432, W3K84-432, NUDOCS 8403130339
Download: ML20087D261 (2)


Text

le i

LOUISIANA f,4a ocunoNot s1nEer POWE A & LIGHT / P o BOX 6000

  • NEW CRLEANS, LOUISMNA 70174 * (504) 366-2345

$IONIvsSEa March 1, 1984 W3K84-0432 Q-3-A35.07.97 3M@MDWS %

Mr. John T. Collins

)

Regional Administrator, Region IV MAR - 6 m U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 p

Arlington, Texas 76012

REFERENCE:

LP&L Letter W3K84-0154 dated January 24, 1984

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit.io.

3 Docket No. 50-382 Significant Construction Deficiency No. 97

" Diesel Generator *B' Turbocharger Failure" Second Interim deport The above referenced letter indicated submittal of the Final Report to the USNRC on March 2, 1984.

At the present time, repairs have been completed on both diesel generators and the 24-hour test run has been performed, however, LP&L is waiting for the efficial res;mnse from Cooper Energy Services as to the cause of the malfunctions, which is now scheduled to be completed by late March 1984.

The Final Report will be submitted to the USNRC on April 6, 1984.

Very truly yours, WW MN 1d T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:SSTG cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20505 8403170339 840301 4

l PDRADOCK05000By g

x.

.s S

f(+,. n

\\Q Nf

$j,.

.~

L

.. ~ _

=_..

I

.. A i

Mr. John T. Collins i

Maren 1, 1984 W3K84-0432 Page 2 4

1 cc: Director Office of Management J

Information and Program Control U. S. Nuclear Regulatory Commissior.

Washington, D.C.

20555 l

Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.

Washington, D.C.

20036 a

Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations i

1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 l

4 i

l 1

i i

l Y