Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML111120355 + (Schedule Update for Completion of the Safety and Environmental Evaluations)
- ML090130718 + (Schedule Update for the Extended Power Uprate Amendment Requests (TAC Nos. MD5262 and MD5263) (TS-431 and TS-418))
- ML032090063 + (Schedule and Inspection Plan for 95003 Supplemental Inspection at Point Beach)
- ML073300453 + (Schedule and Response to PSEG Letter (LR-N07-0274) Dated October 23, 2007, Plans Related to Steam Dryer Evaluation Regarding Request for Extended Power Uprate)
- ML19326A872 + (Schedule for 710208 Continued Hearing Re Utils CP Application in Port Clinton,Oh.Certificate of Svc Encl)
- ML19220C928 + (Schedule for 790404 Meeting W/Acrs Subcommittee,Nrc & Util Representatives in Washington,Dc to Discuss Chronology of TMI Incident,Current Plant Status,Generic & Health Aspects)
- ML16260A149 + (Schedule for ACRS Review of Recent Staff Papers)
- GO2-03-016, Schedule for Achieving Compliance with Compensatory Measures Related to Access Authorization + (Schedule for Achieving Compliance with Compensatory Measures Related to Access Authorization)
- GO2-04-020, Schedule for Achieving Operable Oscillation Power Range Monitors + (Schedule for Achieving Operable Oscillation Power Range Monitors)
- ML19220B517 + (Schedule for Completing Actions Required by IE Bulletin 79-03.Search of Documents Re Welded Pipe Mfg by Youngstown Welding & Engineering Will Be Completed by 790831)
- RS-03-230, Schedule for Completing Actions to Implement Long-Term Stability Solution + (Schedule for Completing Actions to Implement Long-Term Stability Solution)
- RS-03-137, Schedule for Completing Committed Actions Regarding Resolution of Steam Dryer Degradation Issue + (Schedule for Completing Committed Actions Regarding Resolution of Steam Dryer Degradation Issue)
- ML13189A193 + (Schedule for Completion of Modifications to the Flood Mode Spool Pieces)
- ML20080R136 + (Schedule for Completion of Training Matls.Initial Set of Drill Scenarios Should Be Completed by 831021.Certificate of Svc Encl)
- ML080840288 + (Schedule for Completion of Wolf Creek License Renewal Review)
- ML20028A736 + (Schedule for Consideration of Torrey Pines Rept Testimony. Certificate of Svc Encl)
- ML19353B779 + (Schedule for Cooperating Agency Participation on the CISF EIS)
- ML19343C587 + (Schedule for Filing Proposed Findings & Conclusions. Applicants Must File by 810424,intervenors by 810605,NRC by 810702 & Applicants Reply by 810903.Filings Will Not Prejudice Parties Right to Seek Reopening of Record)
- PNP 2013-092, Schedule for Generic Safety Issue - 191 Resolution + (Schedule for Generic Safety Issue - 191 Resolution)
- ML20059N853 + (Schedule for Impep Reviews 2020)
- ML20252A206 + (Schedule for Impep Reviews 2020 (Web Update 20200908))
- ML20252A207 + (Schedule for Impep Reviews 2021 (Web Update 20200908))
- ML19093A529 + (Schedule for Installation of Fish Screens)
- ML112870401 + (Schedule for Modifications to Resolve Steam Generator Tube Rupture Analysis Backfit Non-Compliance)
- ML060270059 + (Schedule for NEI Submittal of Technical Reports to the NRC in Support of Resolution of Esp/Col Seismic Issues)
- RBG-47986, Schedule for Open Phase Condition Detection Implementation + (Schedule for Open Phase Condition Detection Implementation)
- ML052710341 + (Schedule for Operator Licensing Examinations in Response to Regulatory Issue Summary 2005-19)
- ML042110151 + (Schedule for Operator Licensing Examinations)
- ML032750738 + (Schedule for Operator Licensing Examinations)
- ML093130067 + (Schedule for Performing Material Stress Improvement Process for Pressurizer Connections)
- ML072500006 + (Schedule for Processing Amendments Request to Change Technical Specifications Sections 3.7.4 and 5.5.13 Based on Model Text from Technical Specification Task Force(Tstf) Change Traveler TSTF-448, Revision3, Control Room Envel)
- ML072530972 + (Schedule for Processing Relief Request from IWA-4221 to Allow Weld Procedure Specifications for Seal Welding of Installed and Spare Main Steam Relief Valves to Be Post-Qualified in Accordance with ASME Section IX Requirement)
- ML080990086 + (Schedule for Providing Information Requested During March 18, 2008, Duke/Nrc Meeting Associated with the License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade)
- RNP-RA/03-0008, Schedule for Providing Supplemental Response to Request for Additional Information + (Schedule for Providing Supplemental Response to Request for Additional Information)
- ML020530403 + (Schedule for RAI Responses - Catawba, McGuire License Renewal Application)
- L-2018-077, Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation + (Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation)
- GO2-04-032, Schedule for Requesting Revision of Technical Specification P/T Curves and Adoption of the BWRVIP Integrated Surveillance Program + (Schedule for Requesting Revision of Technical Specification P/T Curves and Adoption of the BWRVIP Integrated Surveillance Program)
- ML101800149 + (Schedule for Responding to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System)
- RS-10-129, Schedule for Responding to Request for Additional Information + (Schedule for Responding to Request for Additional Information)
- ML19220B652 + (Schedule for Response to 770201 Info Request Re Steam Line Break Accident Analysis Will Be Provided at 770218 Meeting)
- L-PI-14-030, Schedule for Response to Reactor Vessel Inspection Program Request for Additional Information (RAI) 2-1 + (Schedule for Response to Reactor Vessel Inspection Program Request for Additional Information (RAI) 2-1)
- ML18227D361 + (Schedule for Response to Request for Additional Information on Control of Heavy Loads)
- ML18227B974 + (Schedule for Response to Request for Analysis of Secondary System Fluid Flow Instability in PWRs)
- ML14171A095 + (Schedule for Response to Request for Information (RAI) Regarding Fukushima Lessons Learned Flooding Hazard Reevaluation Report)
- NL-13-1230, Schedule for Response to Request for Information Regarding License Amendment Request Permitting Use of Risk Informed Completion Times + (Schedule for Response to Request for Information Regarding License Amendment Request Permitting Use of Risk Informed Completion Times)
- ML23121A162 + (Schedule for Responses to 2nd Round Request for Additional Information for Review of Licensing Amendment Request 9374-2 for HI-STAR 80 Transportation Package)
- ML22325A338 + (Schedule for Responses to HI-STORM 100 Amendment 16 Requests for Additional Information Batch 4)
- ML24221A278 + (Schedule for Responses to HI-STORM FW Amd. 10 Requests for Supplemental Information)
- ML19259C335 + (Schedule for Responses to IE Bulletins 79-02 & 79-03 Will Be Submitted After Resolution of Seismic Issues Currently Being Studied)
- LR-N07-0168, Schedule for Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate + (Schedule for Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate)
- ML022670572 + (Schedule for Review of Measurement Uncertainty Recapture Power Uprate)