ML042110151

From kanterella
Jump to navigation Jump to search
Regulatory Issue Summary 2004-10 Schedule for Operator Licensing Examinations
ML042110151
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/26/2004
From: Nettles K
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-04-010
Download: ML042110151 (2)


Text

Kenneth W. Nettles General Manager, Nuclear Support Services 803.345.4752 A SCANA COMPANY July 26, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sir/Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 REGULATORY ISSUE

SUMMARY

2004-10 SCHEDULE FOR OPERATOR LICENSING EXAMINATIONS Please find attached South Carolina Electric & Gas Company's (SCE&G) anticipated schedule for operator licensing examinations. SCE&G requests that the NRC prepare the examinations on the attachment.

Should you have any questions, please call Mr. Steven Furstenberg at (803) 931-5111.

Very truly yours, CJMWKWN/cm Attachment c: N. 0. Lorick K. M. Sutton N. S. Cams NSRC T. G. Eppink (w/o Attachment) RTS (CER 04-2327)

R. J. White File (814.04)

W. D. Travers DMS (RC-04-01 19)

K. R. Cotton NRC Resident Inspector AOC)5 SCa&G I Virgil C.Summer Nudear Station

  • P.O. lBox
88. JenkinsvIleSouth Carohna 29065-*1803) 345.5209 .wwwscana.com

- -i Document Control Desk Attachment 1 RC-04-01 19 Page I of _

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0131 EXPIRES 07/31/2005 (5-2003) Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the OPERATOR LICENSING Records Management Branch (T-6 E6) US Nuclear Regulatory EXAMINATON DATACommission, Washington, DC 20555-0001 or by Internet email to EXAMIaNATUION DATA bis 1 0nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Managemcent and Budget Washington, DC 20503. If a means used to Impose an Information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the

________________________________________Information collection.

FACIUTY NRC REGION Virgil C. Summer Nuclear Station 11 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 05 CY 06 CY 07 CY 08 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS.

ESTIMATED NUMBER OF 1 1 NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 05 CY 06 CY 07 CY 08 NUMBER OF REACTOR 6 4 OPERATORS NUMBER OF SENIOR REACTOR 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 3 4 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12112/2005 05/28/2007 ALTERNATE DATE 06/04/2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 05 CY 06 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 4 NUMBER OF CANDIDATES NRC FORM 536 (5-2003)