ML020530403
Jump to navigation
Jump to search
| ML020530403 | |
| Person / Time | |
|---|---|
| Site: | Mcguire, Catawba, McGuire |
| Issue date: | 01/28/2002 |
| From: | NRC/RGN-II |
| To: | Duke Power Co |
| Franovich R, NRR/RLSB, 415-1868 | |
| References | |
| Download: ML020530403 (1) | |
Text
4.
Mechanical AMP 01/28/2002
- 5.
Mechanical 01/23/2002 0311512002 AUX Sys AMR
- 6.
Mechanical 01/28/2002 04/15/2002 AUX Sys Scoping
- 7.
Mechanical 01/28/2002 03/15/2002 ESF Sys AMR
- 8.
Mechanical 01/23/2002 04/15/2002 ESF Sys Scoping
- 9.
Mechanical NONE CMLT SPCS~AMR
- 10.
Mehncl NONE C OMPLETE rPC Scping
- 11.
RCS 01/28/2002 04/15/2002 01/30/2002 04/15/2002
- 12.
Scoping 01/17/2002 04/15/2002 Methodology
- 13.
Scoping 01/23/2002 04/15/2002 Results
- 14.
Structural 01/28/2002 03/15/2002 SAll responses must be submitted by 04/15/2002. Dates in this column represent the date by which Duke will provide responses to the NRC RAI letters.
03/15/2002