Schedule for Processing Amendments Request to Change Technical Specifications Sections 3.7.4 and 5.5.13 Based on Model Text from Technical Specification Task Force(Tstf) Change Traveler TSTF-448, Revision3, Control Room Envel
ML072500006
Person / Time
Site: Duane Arnold 
Issue date: 09/18/2007
From: Feintuch K
NRC/NRR/ADRO/DORL/LPLIII-1
To: Vanmiddlesworth G
Duane Arnold
Feintuch K, NRR/DORL/LPL3-1, 415-3079
References
TAC MD6020
Download: ML072500006 (4)


Text

September 18, 2007 Mr. Gary Van Middlesworth Site Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

DUANE ARNOLD ENERGY CENTER - SCHEDULE FOR PROCESSING AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATION SECTIONS 3.7.4 AND 5.5.13 BASED ON MODEL TEXT FROM TECHNICAL SPECIFICATION TASK FORCE CHANGE TRAVELER TSTF-448, REVISION 3, "CONTROL ROOM ENVELOPE HABITABILITY" (TAC NO. MD6020)

Dear Mr. Van Middlesworth:

By letter to the Nuclear Regulatory Commission dated June 29, 2007, you applied for an amendment to Duane Arnold Energy Center (DAEC) Operating License No.05-331. The proposed amendment would change Technical Specifications (TS) Sections 3.7.4 and 5.5.13 to strengthen TS requirements regarding control building envelope (CBE) habitability. The proposed change would modify action and surveillance requirements associated with the limiting condition for operation operability requirements for the CBE standby filter unit and add a new TS administrative controls program on CBE habitability. The proposed changes to the TS and associated Bases are consistent with certain exceptions with standard technical specifications (STS) as revised by TS Task Force (TSTF) Change Traveler No. 448 (TSTF-448), Revision 3, "Control Room Envelope Habitability" to the extent that the amendment request adopts by reference certain model TSTF-448, Revision 3 content, where applicable.

In your application letter of June 29, 2007, you stated that you were requesting the revision to the TS under the consolidated line item improvement process (CLIIP). The NRC staff has performed an acceptance review of your application letter. Our review indicates that your amendment request cannot be processed under a CLIIP schedule because of the exceptions to the model safety evaluation dated January 9, 2006, which is associated with TSTF-448, Revision 3.

G. Middlesworth Our current planning for this application for amendment would be to have a response to you prior to June 15, 2008. We anticipate providing a request for additional information (RAI) prior to the end of October, 2007. In a phone call on September 5, 2007, with Tony Browning of your staff, I stated that your application letter did not contain a requested date for the response. It was agreed that DAEC would provide a requested date as part of its response to the RAI or by separate correspondence prior to its response to the RAI.

If you have any questions regarding this correspondence, please contact me at 301-415-3079.

Sincerely,

/RA/

Karl D. Feintuch, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: See next page

G. Middlesworth Our current planning for this application for amendment would be to have a response to you prior to June 15, 2008. We anticipate providing a request for additional information (RAI) prior to the end of October, 2007. In a phone call on September 5, 2007, with Tony Browning of your staff, I stated that your application letter did not contain a requested date for the response. It was agreed that DAEC would provide a requested date as part of its response to the RAI or by separate correspondence prior to its response to the RAI.

If you have any questions regarding this correspondence, please contact me at 301-415-3079.

Sincerely,

/RA/

Karl D. Feintuch, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc: See next page DISTRIBUTION:

PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 RidsNrrPMKFeintuch RidsNrrLATHarris RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn3MailCenter ADAMS Accession Number: ML072500006 NRR-106 OFFICE LPL3-1/PM LPL3-1/LA LPL3-1/(A) BC NAME KFeintuch THarris TTate PST for DATE 09/18/07 9/18/07 9/18/07 OFFICIAL RECORD COPY

Duane Arnold Energy Center cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. M. S. Ross Managing Attorney Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Ms. Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW Suite 220 Washington, DC 20004 Don E. Grissette Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 John Bjorseth Site Director Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 Steven R. Catron Manager, Regulatory Affairs Duane Arnold Energy Center 3277 DAEC Road U. S. Nuclear Regulatory Commission Resident Inspector=s Office Rural Route #1 Palo, IA 52324 Mr. M. Warner Vice President, Nuclear Operations, North Region Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 Mr. D. A. Curtland Plant Manager Duane Arnold Energy Center 3277 DAEC Rd.

Palo, IA 52324-9785 Mr. R. S. Kundalkar Vice President, Nuclear Technical Svcs.

Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 Daniel K. McGhee Iowa Department of Public Health Bureau of Radiological Health 321 East 12th Street Lucas State Office Building, 5th Floor Des Moines, IA 50319-0075 Chairman, Linn County Board of Supervisors 930 1st Street SW Cedar Rapids, IA 52404 Palo, IA 52324