Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058P915 + (Rev 0 to Procedure RSP-002, QA Program)
- ML20134G347 + (Rev 0 to Procedure RSP-014, Receipt,Handling & Identification of Radioactive Matls)
- ML20056G098 + (Rev 0 to Procedure RW-C-100, Solid Radwaste Sys Pcp. Procedure Supersedes RW-800 at LGS & RW-120 & RW-121 at PBAPS)
- ML20112G449 + (Rev 0 to Procedure RWS-0204, Process Control Program)
- ML20237G520 + (Rev 0 to Procedure Ri 1440.1, Salp)
- ML20206T435 + (Rev 0 to Procedure SAG-CP.09, Instruction for Reevaluation of Cable Tray Hangers Affected by Longitudinal Tie of Transverse Hangers to Tray)
- ML13309B254 + (Rev 0 to Procedure SO23-II-11.162, Reactor Breaker Response Time Testing. Related Info Encl)
- ML20128M002 + (Rev 0 to Procedure SPDS-DST-001, SPDS Dynamic Simulation Test Plan)
- ML17262A811 + (Rev 0 to Procedure ST-89.02, Control Bldg Heat Generation Rate Testing)
- ML20134E290 + (Rev 0 to Procedure STP-PGM-02, Procedure for Resolving Disputes Between Const & Qa/Qc Personnel)
- ML18051A995 + (Rev 0 to Procedure T-147 Water Hammer Test)
- ML20090C434 + (Rev 0 to Procedure T-250, Remote Manual Primary Containment Isolations)
- ML18094B280 + (Rev 0 to Procedure TCP-4L, Containment Bldg Liner)
- ML20210D006 + (Rev 0 to Procedure TE-FVM-CS-036, Field Verification Method:As-Built Verification of Attachments to Main Structural Framework in Cable Spread Room Supporting Unit 1 Designated Cable Trays & Selected Attributes of Unit 1..)
- ML20210D012 + (Rev 0 to Procedure TE-FVM-CS-048, Field Verification Method Unit 1 Cable Tray Selected Attributes As-Built Program)
- ML20210D030 + (Rev 0 to Procedure TE-FVM-CS-050, Field Verification Method T.J. Cope Flat Ladder Tee Fitting Selected Attributes Data Collection)
- ML20247E549 + (Rev 0 to Procedure TNP-QAP-VT108, Visual Exam)
- ML17157A087 + (Rev 0 to Procedure TP-024-087, Data Collection for E Diesel Generator Combustion Intake Air Temp Test)
- ML17139C769 + (Rev 0 to Procedure TP-ISI-307, Manual Ultrasonic Exam of Austenitic Piping Welds)
- ML17139C772 + (Rev 0 to Procedure TP-ISI-309, Manual Ultrasonic Exam of Austenitic Thin Wall Piping Welds. Related Info Encl)
- ML17139C767 + (Rev 0 to Procedure TP-ISI-332, Measuring & Recording Search Unit Location & Max Signal Amplitude Data During Ultrasonic Weld Exams)
- ML20091R539 + (Rev 0 to Procedure TRA-299, Shift Advisor Training & Qualifications)
- ML20205F806 + (Rev 0 to Procedure TSGP-47, Control Room Ventilation Sys Ductwork In-Leakage Test)
- ML20126B321 + (Rev 0 to Procedure Tp 600/2, Controlling Procedure for Once-Through Steam Generator Repair Testing. Encl 6 (Pages 114,115 & 116 Not Included))
- ML17278A549 + (Rev 0 to Procedure Tp 8.6.6, Special Test Procedure for Tdas Class 1E Isolators)
- ML20236N781 + (Rev 0 to Procedure Tp 81-09, Scram Air Header Depressurization)
- ML20151B421 + (Rev 0 to Procedure UNIT-NLI-040, NAC Cask Recommended Operating Instructions)
- ML20132F369 + (Rev 0 to Procedure UNT-4-004, Plant Correspondence Control)
- ML20237D700 + (Rev 0 to Procedure VMSB-98-001, Guideline Requirements for Time-of-Flight Diffraction Ultransonic Exam of VSC-24 Structural Lid to Shell Weld)
- ML20045J255 + (Rev 0 to Procedure WVNS-TP-057, Verification Cubes Sludge Wash Cement-Waste W/Type V Portland Cement)
- ML20072K042 + (Rev 0 to Procedure Work Plan OP-1903.068, Emergency Response Facility - Emergency News Ctr (Enc))
- ML20127K121 + (Rev 0 to Procedure Zap 6-52-5, Zion Station Equipment Technical Info Control Program)
- ML20073H987 + (Rev 0 to Procedure for Review of Radiographic Records)
- ML20112E717 + (Rev 0 to Procedures Generation Package)
- ML20084H497 + (Rev 0 to Procedures Generation Package for Emergency Operating Procedures,Including plant-specific Technical Guidelines for Units 1 & 2,plant-specific Writers Guide & Implementation Plan for Emergency Response Project)
- ML20137G100 + (Rev 0 to Procedures for Estimating Core Damage (TMI Item II.B.3) in Response to SER Confirmatory Item 32,including Procedure 91502-C, Core Damage Assessment & Procedure 91503-C, Control Room Instrumentation...)
- ML20093K636 + (Rev 0 to Process Control Program)
- ML20137M293 + (Rev 0 to Process Control Program)
- ML20137F268 + (Rev 0 to Process Control Program)
- ML20137A164 + (Rev 0 to Process Control Program)
- ML20155C876 + (Rev 0 to Process Control Program)
- ML17255A592 + (Rev 0 to Process Control Program)
- ML20033F265 + (Rev 0 to Process Control Program)
- ML20199A650 + (Rev 0 to Process Spec PSPAS-01, Assembly,Fitting & Welding Sequence for Primary Loop Piping)
- ML20100H623 + (Rev 0 to Program 6250-PGD-2720, Engineering Support Personnel Training)
- ML20093E718 + (Rev 0 to Program Plan & Issue-Specific Action Plans)
- ML20100D718 + (Rev 0 to Program Plan for Hope Creek Idvp)
- ML20073K118 + (Rev 0 to Program Plan for TMI Improvements Integration Effort for WPPSS Unit 3. W/One Oversize Drawing.Aperture Card Is Available in PDR)
- ML20155A008 + (Rev 0 to Program for Independent Design & Const Assessment)
- ML20058G677 + (Rev 0 to Project Assignment 91-006, Connecticut Yankee Event V Mods)
- ML13310B525 + (Rev 0 to Project Design Criteria 15691-583, Walkdown Criteria for Evaluation of Safety-Related Small Bore Piping & Tubing)