ENCODE: ACIOAC
REFERENCE:
50123-1-1.0 5
501?3-V1-1.1 (dhen form filled out)
TEMPORARY CHANGE NOTICE NOTE: TECHNICAL SPECIFICATION VIOLATION IF NOT PROCESSED ITHIN THE STATED TIME LIMITS.
Procedure No. SO23-II-11.
1 6 2 Revision No.
0 TCN No.
Procedure Title RESPONSE TIME TESTING Procedure Author R. L.
CLIFT PAx 59144 (if known. Writer) iPAZ
- 1. The following change shall be in effect:
[Attach a copy of the effected page(s), if appIlcable]
SEE ATTACHED
- 2. Reason:
TO CLARIFY INTENT OF PROCEDURE
- 3. (a) 1s this change a result of a facility design change? (PFC, NCR, or Temporary odification, etc.)
YES No___ _
If yes, provide the facility design change identifier (b) Completion of the facility design change has been verified. (Need only oe completed if (a) is YES)
YES NO (If the answer to 3. (b) is NO, a TCH is NOT authorized. W 14 1983 rnu,.o CUM Use Onl)
- 4. Date originated 514 f
- 5. Issuance date_____o__c___ueo____
- 6. Does this change affect FSAR or Tech. Spec. comnitments? YES_
NO
- 7. Does this change affect the nonradiological environment of any offsite area previously undisturbed during site preparation and plant construction? YES_
N__
- 8. Is the intent of the original document altered? YES NO
- 9. Is the document to be changed an Emergency and Abnormal Operating Instruction? YES
- NOJ, (If the answer to 6. 7. 8 or 9 is YES. a TCN is NOT authorized)
- 10. Does this change aff t licensing comitment requirements as stated in the Reference Section?
YES NO
- 11.
Originator e=' 2Aedime (Signature)
DY~
ate[T lie
- 12. Is the TCN to be incorporated into next permanent revision within 60 days of issuance date?
YES__t
- One time change only against Procedure/Station Order No.
Rev. No._
- 13. Copy sent to the Nuclear Safety Group Date CDM4 Signature Date
- 14. Signatures Required:
Approved by:
(at least one (1) SRO) inal approval by:
if FL copy
- 3) rog-niz-a-nT uoctf6 Station Manager RECEIVED 8304210320 830419
'RECEIVED PDR ADOCK 05000361 DtR14Ihn43 PDR oval must be by two embers of the plant management staff at least ame of whom holds a i
n thunit affected. (For TCN proval, members of the plant mnagement staff are defined as anySt§1X9 Supervisor, including the level of foreman. exercising responsibility in the specific area and unit addressed by the change).
PROCEDURE S023-II-1 1. 162 REVISI#
TCN I PAGE 2 OF 3
- 1.
Change the first sentence of 4.6 to read:
WITH THE UNIT IN SERVICE ONLY ONE BREAKER AT A TIME MAY BE TRIPPED.
- 2.
Change the first sentence of CAUTION after 6.4 to read:
WITH THE UNIT IN SERVICE ONLY ONE BREAKER AT A TIME MAY BE TRIPPED.
- 3.
Change the first sentence of CAUTION after 6.4.4 to read:
WITH THE UNIT IN SERVICE ONLY ONE BREAKER AT A TIME MAY BE TRIPPED.
- 4.
After CAUTION after 6.4 add the following:
NOTE:
Attachments 8.1 and 8.2 list convenient attachment locations.
- 5.
Change 6.4.2 to read:
Use the selected auxiliary contacts (pallets) to time opening of the breaker. Connect test leads to the appropriate terminal blocks on the rear of the switchgear.
- 6.
Change 6.5.2 to read:
Use the selected auxiliary contacts (pallets) to time opening of the breaker. Connect test leads to the appropriate terminal blocks on the rear of the switchgear.
- 7.
Change the first sentence of CAUTION after 6.5.4 to read:
WITH THE UNIT IN SERVICE ONLY ONE BREAKER AT A TIME MAY BE TRIPPED.
- 8.
Change heading on Attachment 8.2 to read:
TERMINAL LOCATIONS OF AUXILIARY CONTACTS (PALLETS).
SAN C.OFRE NUCLEAR GENE ING STATION INSTRUMENT AND T PROCEDURE S023-II-11.162 UNITS 2 AND 3 REVISION 0 PAGE 1 EFFECTIVE DATE APR12 1983 CDRA REACTOR BREAKER RESPONSE TIME TESTING TABLE OF CONTENTS SECTION PAGE 1.0 OBJECTIVE 2
2.0 REFERENCES
2 3.0 PREREQUISITES 2
4.0 PRECAUTIONS 3
5.0 CHECK-OFF LIST(S) 4 6.0 PROCEDURE 4
6.1 Communications 4
6.2 Plant and CEDM Status 4
6.3 Acceptance Criteria 4
6.4 Response Time Testing -
Undervoltage Trip Device 5
6.5 Response Time Testing -SutTi Dece5 6.6 Instruction for Test 6
(16.7 Restoration 6
7.0 RECORDS 6
8.0 ATTACHMENTS 7
PAGES CHANGED WITH THIS REVISION:
NEW PREPARED BY:
6 Y474 13_
PROCEDURE WR4TR DATE APPROVED BY:
4 B. KATZ DATE 6s
- TMANAGER, TECHNICAL 6.5epneTmeTsig-Sun-rpDvc 2575b/daj 7.0 RECORDSD (E H EfDTm SITE SITE ILE COPY
SAN ONOFRE NUCLEAR GENENTING STATION INSTRUMENT AND OT PROCEDURE S023-II-11.162 UNITS 2 AND 3 REVISION 0 PAGE 2 REACTOR BREAKER RESPONSE TIME TESTING 1.0 OBJECTIVE 1.1 To perform a response time test on each Reactor Breaker to prove that the Shunt and Undervoltage tripping devices are able to separately cause the breaker to trip within a specified time.
1.2 To provide data that will document the response time of each Reactor Breaker.
2.0 REFERENCES
2.1 Applicable elementary diagrams 2.2 Applicable wiring diagrams 2.3 Applicable manufacturers' diagrams and manuals 2.4 Vendor elementary diagrams S023-944-328 through 336 2.5 Vendor wiring diagrams S023-944-340 through 344 2.6 Operating Instruction S023-0-23 2.7 Operating Instruction 5023-0-13 C
2.8 SCE Accident and Fire Prevention Manual 2.9 Station Safety Program S0123-A-138 2.10 Procedure 5023-II-11.161 Surv. Req. Reactor Breakers Undervoltage and Shunt Trip Device Circuit Test 3.0 PREREQUISITES 3.1 An Equipment Control Form SO(123) 562, or a Minor PM/Surveillance Request Form, SO(123) 97, may need to be submitted and approved prior to commencing work using this procedure. See Operating Instruction 5023-0-23 for instructions on the use of these forms.
3.2 The applicable Work Authorization per Operating Instruction S023-0-13 must be obtained from the Control Operator prior to beginning work.
3.3 Check.4be-applicable radiation and contamination survey information BEFORE entering job area. Use this survey information to assist in maintaining your exposure ALARA.
3.4 Verify that this procedure is current by checking this revision against a contrnoled copy and any Temporary Change Notices.
3.5 All data mt
during each particular step of this procedure.
SANEC14OTINGUE STTON INSTRUMETAD'S R
SAN *FRE NUCLEARENT AND T PROCEDURE S023-II-11.162 UNITS 2 AND 3 REVISION 0 PAGE 3 3.0 PREREQUISITES (Continued) 3.6 These Prerequisites are to be re-verified at the beginning of each new work period not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Signatures are hot required for these re-verifications.
3.7 Communications between the Test Technician, Operator at the CEDM control panels, and the Control Room must be established prior to the start of the test, and maintained throughout the duration of the test.
3.8 If the Unit is shut down and a SCRAM signal is present, contact the Instrument Department and have them remove the trip by simulating a running condition at the Plant Protection Cabinets to allow operation of the Reactor Breakers.
3.9 Test Equipment 3.9.1 Electronic Timer or Oscillograph Recorder 3.9.2 DMM (Digital Multimeter) 3.9.3 Switches, leads, hand tools, etc.
3.10 Measuring and Test Equipment (M&TE) to be used for this test shall have a current calibration history, have an accuracy better than the allowable accuracy of the device to be calibrated, and be NBS traceable.
3.11 This test will normally be performed with the breaker in the "racked in" position, but can be performed in the "In Test" position. This will keep the circuitry intact to the undervoltage coil with the diede in the coil circuit.
4.0 PRECAUTIONS 4.1 In the event any unanticipated conditions occur during testing, the technician shall immediately notify the Control Operator.
4.2 Receiving approval to begin testing does not, in any way, obviate the responsibility of the technician to determine for himself that it is prudent and safe to begin work.
4.3 In the event the test data does not meet the acceptance criteria, the Control Operator and the applicable Supervisor shall be notified immediately. Under no circumstances shall the device be returned to service withoutthe Control Operator's approval.
4.4 Observe the Work Authorization Holders' responsibilities under Operating Instruction S023-0-13.
4.5 In conducting the activities of the procedure, various levels of circuit voltags wi. b: energized.
Exercise caution and conform to the guidelines specified in References 2.8 and 2.9 concerning maintenance activities on energized electrical circuits.
SAN ONOFRE NULEJAR GENERATING STATION INSTRUMENT AND TEST PROCEDURE S023-II-11.162
'UNITS 2 AND 3 REVISION 0 PAGE 4 4.0 PRECAUTIONS (Continued) 4.6 ONLY ONE BREAKER AT A TIME MAY BE TRIPPED. THE BREAKER UNDER TEST MUST BE RECLOSED AND RETURNED TO NORMAL BEFORE TESTING MAY PROCEED ON ANY OTHER REACTOR BREAKER.
4.7 The tie breaker (TCB-9) shall not be tested if only one CEDM MG s 1 in service.
4.8 Necessary steps shall be taken to prevent any unscheduled trips or damage to equipment.
5.0 CHECK-OFF LIST(S) 5.1 None 6.0 PROCEDURE 6.1 Verify communications as set forth in step 3.7. Enter the verification signature on the Data Record, Attachment 8.3.
6.2 Verify the proper plant status and CEDM lineup with Operations personnel.
Any deviation from normal plant status and CEDM lineup will be noted in the Remarks section of the Data Record, Attachment 8.3.
6.3 Acceptance Criteria 6.3.1 With timing leads connected to the auxiliary switch (pallets) contacts and the breaker installed in the cubicle, the maximum time response shall be 100 msec, per CE guidelines.
6.3.2 If the time is >82 msec and <100 msec, the Supervisor of I&C Electrical Engineering sEall be notified immediately for the purpose of investigating possible degradation of the tripping devices or breaker.
6.3.3 If the time is >100 msec, the breaker shall be declared inoperable and the Cognizant Supervisor and Control Operator shall be notified immediately.
NOTE:
The 82 msec time is based upon the maximum average test time that was noted during testing by SCE Apparatus Division in concert with GE.
This time includes the extra time added using the auxiliary contacts.
SAN ONOFRE NUCLEAR GEN STATION INSTRUMENT ANDA T PROCEDURE 5023-11-11.162 UNITS 2 AND 3 REVISION 0 PAGE 5 6.0 PROCEDURE (Continued) 6.4 Response Time Testing -
Undervoltage Trip Device CAUTION ONLY ONE BREAKER AT A TIME MAY BE TRIPPED. THE BREAKER UNDER TEST MUST BE RECLOSED AND RETURNED TO NORMAL BEFORE TESTING MAY PROCEED ON ANY OTHER REACTOR BREAKER.
6.4.1 Set up the timing device to be able to time upon loss of the Reactor Breaker control power, and indicate the interval between the loss of power and the opening of the breaker.
6.4.2 Use the auxiliary contacts (pallets) to time opening of the breaker. Connect test leads to the terminal blocks on the rear of the switchgear per Attachment 8.2.
6.4.3 With the timing device connected, remove the power to the undervoltage circuit for the selected breaker, and time from loss of voltage to the breaker opening. Have the breaker closed and repeat the trip twice more. Record the three times on the Data Record, Attachment 8.3.
6.4.4 Return the breaker to the closed or "As Found" condition.
CAUTION ONLY ONE BREAKER AT A TIME MAY BE TRIPPED.
THE BREAKER UNDER TEST MUST BE RECLOSED AND RETURNED TO NORMAL BEFORE TESTING MAY PROCEED ON ANY OTHER REACTOR BREAKER.
6.5 Response Time Testing - Shunt Trip Device 6.5.1 Set up the timing device to be able to time from the initiation of the signal to the shunt trip device to the breaker tripping (opening).
6.5.2 Use the auxiliary contacts (pallets) to time opening of the breaker. Connect test leads to the terminal blocks on the rear of the switchgear per Attachment 8.2.
6.5.3 Initiate a trip signal to just the shunt trip device by closing the circuit, identified in Attachment 8.1 for the selected bre'-
interval between initiation of thc trip signal and the breaker.tir nrjng (opening).
Have the breaker closed and repeat the trip twice more. Record the three times on the Data Record, Attachment 8.3.
SAN ONOFRE NUCLEAR GENERATING STATIC.
TRUMENT AND TEST PROCEDURE S023-II-11.162 UNITS 2 AND 3 REVISION 0 PAGE 6 6.0 PROCEDURE (Continued) 6.5.4 Return the breaker to the closed or "As Found" condition.
CAUTION ONLY ONE BREAKER AT A TIME MAY BE TRIPPED.
THE BREAKER UNDER TEST MUST BE RECLOSED AND RETURNED TO NORMAL BEFORE TESTING MAY PROCEED ON ANY OTHER REACTOR BREAKER.
6.6 Complete steps 6.4 and 6.5 for all Reactor Trip Breakers TCB-1 through TCB-9. Use Attachments 8.1, 8.2 for terminal locations and fuse designation and location.
6.7 Restoration 6.7.1 Remove all test leads and test equipment.
6.7.2 At the completion of the test, all fuses will be checked installed and the Reactor Trip Breakers and PPS system restored to "As Found" or "Normal Status."
6.7.3 Restore all connections, switches and devices that were altered in the performance of this procedure.
6.7.4 A second qualified person shall verify the restoration (safety-related equipment only).
Sign verification on Data Record, Attachment 8.3.
6.7.5 Release any Work Authorization obtained for this procedure back to the Control Operator per Operating Instruction S023-0-13.
6.7.6 When applicable, complete the required portions of the Return To Service section of Equipment Control Form SO(123) 562.
7.0 RECORDS 7.1 Upon completion of this procedure, the Data Record, Attachment 9.4, shall be signed by the Technician and responsible Electrical Test Supervisor.
The Supervisor of Electrical Test and I&C Engineering Representative shall review and approve the test data.
7.2 A copy of the Data Record, Attachment 8.3, of this procedure will be made for retention in the Test Shop files.
7.3 Transfer the original copy of the Data Record, Attachment.?
CDM Center.
SAN ONOFRE NUCLEAR GE W TING STATION INSTRUMNT AND IEST PROCEDURE S023-11-11.162 UNITS 2 AND 3 REVISION 0 PAGE 7 8.0 ATTACHMENTS 8.1 Terminal and Fuse Designation and Location For Trips 8.2 Test Lead Connections 8.3 Reactor Breaker Response Time Test Data Record 2575b
SAN ONOFRE NUCLEAR GEN 4
ING STATION INSTRUMENT AND PROCEDURE S023-II-11.162 UNITS 2 AND 3 REVISION 0 PAGE 1 OF 1 ATTACHMENT 8.1 TERMINAL AND FUSE DESIGNATION AND LOCATION FOR TRIPS UNDERVOLTAGE SHUNT TEST LOCATION TEST BREAKER FUSE NO.
TRIP TERMINALS TOP TCB-1 FU1T (POS)
OTB2-3 to OTB2-4 SECT. 1 REAR-RIGHT TOP TCB-2 FU2T (POS)
OTB11-3 to OTB11-4 SECT. 2 REAR-RIGHT TOP TCB-3 FU3T (POS)
OTB23-3 to 0TB23-4 SECT. 4 REAR-RIGHT TOP TCB-4 FU4T (POS)
OTB32-3 to OTB32-4 SECT. 5 REAR-RIGHT TCB-5 FU5T (POS)
OTB2-9 to OTB2-10 SECT. I REAR-RIGHT TOP TCB-6 FU6T (POS)
OTB11-9 to OTB11-10 SECT. 2 REAR-RIGHT TOP TCB-7 FU7T (POS)
OTB23-9 to OTB23-10 SECT. 4 REAR-RIGHT TOP TCB-8 FU8T (POS)
OTB32-9 to OTB32-10 SECT. 5 REAR-RIGHT TOP TCB-9 FU9T (POS)
SECT. 3 REAR-RIGHT TRIP PB ON DOOR TCB-9 BC3 to BC4 SECT. 3 FRONT
SAN ONOFRE NUCLEAR GENTING STATION INSTRUMENT AND TET PROCEDURE 5023-11-11.162 UNITS 2 AND 3 REVISION 0 PAGE 1 2F 1 ATTACHMENT 8.2 TEST LEAD CONNECTIONS BREAKER TERMINALS CONTACT TYPE LOCATION TOP TCB-1 OTB5-9 to OTB5-10 NO(a)
SECT.
1 REAR-LEFT OTB5-11 to OTB5-12 NC(b)
TOP TCB-2 OTB14-9 to OTB14-10 NO(a)
SECT. 2 REAR-LEFT OTB14-11 to OTB14-12 NC(b)
TOP TCB-3 OTB26-9 to OTB26-10 NO(a)
SECT. 4 REAR-LEFT OTB26-11 to OTB26-12 NC(b)
TOP TCB-4 OTB35-9 to OTB35-10 NO(a)-
SECT. 5 REAR-LEFT OTB35-11 to OTB35-12 NC(b)
TOP TCB5 OTB8-9 to OTB8-10 NO(a)
SECT. 1 REAR-LEFT OTB3-11 to OTB8-12 NC(b)
TOP TCB6 OTB17-9 to OTB17-10 NO(a)
SECT. 2 REAR-LEFT 0T817-11 to OTB17-12 NC(b)
TOP TCB7 OTB29-9 to OTB29-10 NO(a)
SECT. 4 REAR-LEFT OTB29-11 to OTB29-12 NC(b)
TOP TCB8 OTB38-9 to OTB38-10 NO(a)
SECT. 5 REAR-LEFT OTB38-11 to OTB38-12 NC(b)
TOP TCB9 OTB21-9 to OTB21-10 NO(a)
SECT. 3 REAR-LEFT OTB21-11 to OTB21-12 NC(b)
SAN ONOFRE NUCLEAR GEN TING STATION INSTRUMENT AND TEST PROCEDURE S023-I1-11.162 UNITS 2 AND 3 REVISION 0 PAGE 1 OF 3 ATTACHMENT 8.3 REACTOR BREAKERS RESPONSE TIME TEST PMO NUMBER DATA RECORD UNIT Test Shop File No.
6.1 Communications verified, (prerequisite).
/
Technician / Date 6.2 Plant status and CEDM system lineup verified, (prerequisite).
Technician / Date UNDER VOLTAGE TRIP DEVICE Reactor Breaker Trip
- Trip
- Trip
- Breaker Closed Breaker "As Found" Time I Time 2 Time 3 Or "As Found" TCB-1 TCB-2 TCB-3 TCB-4 TCB-5 TCB-6 TCB-7 TCB-8 TCB-9
- Time is in msec.
SAN ONOFRE NUCLEAR GEN#
ING STATION INSTRUMENT AND PROCEDURE 5023-11-11.152 UNITS 2 AND 3 REVISION 0 PAGE 2 OF 3 ATTACHMENT 8.3 Test Shop File No.
SHUNT TRIP DEVICE Reactor Breaker Trip
- Trip
- Trip
- Breaker Closed Breaker "As Found" Time 1 Time 2 Time 3 Or "As Fow TCB-1 TCB-2 TCB-3 TCB-4 TCB-5 TCB-6 TCB-7 TCB-8 TCB-9
- Time is in msec.
6.6 Restoration 6.6.1 Restoration Completed Technician
/
Date Second Qualified Person
/
Date
SAN ONOFRE NUCLEAR GENERANG STATION INSTRUMENT AND TEW PROCEDURE 5023-11-11.162 UNITS 2 AND 3 REVISION 0 PAGE 3 OF 3 ATTACHMENT 8.3 DATA RECORD Measuring and Test Equipment TEST SHOP FILE NUMBER Record all instruments used in this procedure TYPE I
MODEL-STYLE I SERIAL DATE CALI.'
IINSTRUMENT I MANUFACTURER NUMBER I RANGE NUMBER I ACCURACY DUE I
I I
I I
III I
I I
II III I
I{I I
I I
I I
I F
I I
I I
{I II I
I I
I I
III I
I III I
I I
I IF I
I II I
I I
I I
Remarks:
TECHNICIAN(S)
DATE DATE ELECTRICAL TEST SUPERVISOR DATE SUPERVISOR OF ELECTRICAL TEST DATE I&C ENGINEERING REPRESENTATIVE DATE