Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "PORV Operability Clarification". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20196B688  + (PNS-V-88-006:on 881126,licensee Received Telcon Alleging That Nonlicensed Equipment Operator Observed Using Illegal Drugs.Individual Submitted to Urinalysis Test & Showed Positive for Marijuana.Individual Terminated on 881130)
  • ML13331A285  + (PNS-V-88-007:on 881130,senior Resident Informed of Possible Tampering Events.Caused by Cleaning Person Not Being Able to Completely Secure Associated Valving After Work Activities. Enhanced Walkdown Performed)
  • ML13331A288  + (PNS-V-88-007A:on 881201,actuation Alarm Received from Reactor Coolant Pump Fire Protection Deluge Sys at Unit 2. Caused by Contract Watchman Who Denied Any Intent to Cause Damage to Plant.Two Watchman Terminated)
  • ML17285A316  + (PNS-V-89-002:on 890224,security Dept Informed by Region V of Suspected Deliberate Damage to Personnel Contamination Monitor Booths.Damage in at Least Five Instances Appears to Be Deliberate.Investigation Initiated)
  • ML13331A314  + (PNS-V-89-003:on 890317,results of Routine Random Drug Test for Fitness for Duty of Licensed Reactor Operator Confirmed as Positive.Plant Access Authorization Suspended.Possibility of Investigatory Suspension Unless Innocent Use Identified)
  • ML17304B130  + (PNS-V-89-004:on 890422,fitness-for-duty Reactor Operator Tested Positive for Cocaine on Routine Urinalysis.Individual Placed on Disciplinary Suspension & Will Be Offered Chance to Participate in Licensee Assistance Program)
  • ML20245G610  + (PNS-V-89-005:on 890615,licensee Informed NRC of Possible Onsite Use & Sale of Marijuana & Cocaine by Five Contract Employees,Employed by Northwest Energy Svcs Co.Employees Interviewed,Searched & Given Urinanalyses on 890616)
  • ML20206A602  + (PNS-i-87-005:on 870402,Suffolk County Police Dept & Offsite Emergency Response Ctr Received Bomb Threat Against Plant. Operators Evacuated to Control Room Lunchroom & Dog Search Initiated.Normal Control Room Staffing Resumed After Search)
  • ML20212R513  + (PNS-i-87-006:on 870420,bomb Threat Received by Monroe County Police Emergency Notification Dispatcher.Security Personnel Posted on Plant Access Roads to Verify Id Prior to Access to Plant.State & Local Police Patrolled Area)
  • ML20209G350  + (PNS-i-87-007:on 870425,Suffolk County Police Dept Received Call from At&T Stating That Male Caller Phoned in Bomb Threat.Security Surveillance Increased & Returned to Normal at Completion of Search When Unusual Event Terminated)
  • ML19256E903  + (PNS79-019:on 790309,bomb Threat Received from Unidentified Male Caller.Two Hundred Fifty Contract Workers Evacuated.Search Produced Negative Results)
  • ML20154F573  + (PNs-I-88-007:on 880912,two I-131 Capsules Reported Missing by Er Squibb & Sons.Capusules Were Shipped to Roswell Park Memorial Hosp in Buffalo,Ny on 880907.Sources May Have Been Disposed Inadvertently W/Shipping Package)
  • ML050840523  + (POD - Point Beach - U1R28)
  • ML050840535  + (POD - U1R28: Day 11 - Point Beach Refueling Outage Edition)
  • ML050870320  + (POD H. O. - Point Beach Nuclear Plant U1R28: Day 33)
  • ML050840536  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 11)
  • ML050870047  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 12)
  • ML050870052  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 16)
  • ML050870061  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 17)
  • ML050870065  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 18)
  • ML050870085  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 19)
  • ML050870121  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 23)
  • ML050870311  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 26)
  • ML050870317  + (POD H.O. - Point Beach Nuclear Plant U1R28: Day 31)
  • ML050870118  + (POD H.O., with Handwritten Notations - Point Beach Nuclear Plant U1R28: Day 20)
  • TSTF-151  + (PORV Operability Clarification)
  • ML101370304  + (PORV Pressure Boundary Designation, Acceptance Review-Non Acceptance with Opportunity to Supplement)
  • TSTF-288  + (PORV SR Notes Added)
  • 05000282/FIN-2010006-04  + (PORV Stroke Timing Acceptance Criteria Failed to Include Instrument Response Time)
  • ML20093M029  + (POST-ACCIDENT Gas Generation from Radialysis of Organic Materials)
  • ML20265A676  + (POST-ACCIDENT Sampling Sys.Sheet 1 of 2)
  • ML20265A682  + (POST-ACCIDENT Sampling Sys.Sheet 2 of 2)
  • ML20266J928  + (POST-ACCIDENT Sampling System (SS) P&Id, as-built)
  • ML20082K145  + (POST-EMERGENCY Response Resources Guide.Based on the Post- Emergency Tabletop Exercise in Baton Rouge,Louisiana,On August 28 and September 18, 1990)
  • ML20212M491  + (POST-EOCENE Fault Near East Edge of Reelfoot Rift in Lauderdale County,Tennessee,As Discovered by Gravity,Earth Resistivity Surveys and Drilling)
  • ML20246A377  + (POST-IRRADIATION Fracture Toughness Characterization of Four LAB-MELT Plates)
  • ML20246J563  + (POST-IRRADIATION Fracture Toughness Characterization of Four LAB-MELT Plates)
  • 05000395/FIN-2012005-02  + (POST-LOCA Impact of Replacement Fire Hoses on the ECCS Sump)
  • ML20246A043  + (POST-PENNSYLVANIAN Reactivation Along the Washita Valley Fault,Southern Oklahoma)
  • ML20212N884  + (POST-PLIOCENE Displacement on Faults within the Kentucky River Fault System of EAST-CENTRAL Kentucky)
  • ML20097B402  + (POST-TEST Analysis of Lobi Test BT-12 Using RELAP5/MOD2)
  • ML20135E320  + (POST-TEST Analysis of PIPER-ONE PO-IC-2 Experiment by RELAP5/MOD3 Codes)
  • ML20105D045  + (POST-TEST-ANALYSIS and Nodalization Studies of OECD Loft Experiment LP-02-6 with RELAP5/MOD2 CY36-02)
  • ML20116A088  + (POST-TEST-ANALYSIS and Nodalization Studies of OECD Loft Experiment LP-LB-1 RELAP5/MOD2 CY36-02)
  • ML19337B315  + (POV Inspection Procedure 71111 Istog Meeting December 2019)
  • ML19324F001  + (POV Inspection Workbook)
  • ML20003F667  + (POV Workshop Region IV Jan 2020)
  • ML17157C369  + (PP&L Annual Rept 1992)
  • ML18017A270  + (PP&L Annual Rept 1993)
  • ML18026A428  + (PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2)
  • ML18306A487  + (PP&L Susquehanna Steam Electric Station Technical Specifications Unit 2 Manual)