I-Nw* Point Beach Nuclear Plant p
Safety
- Innovation + Teamwork e.
Im laDoCse Free_
Schele rirn Event Response Team Plan-of-the-Day Meeting U1R28: Day 31 On Call:
Days to U2R27: 333 Team "A"0815-0845 Team "A" Front Office Conference Room Days to U1R29: 508 Days Since Last HP Work Week: B07A2 Safety Event:
Clock Reset:
Date: Tuesday, May 4, 2004 i-8 l 1
Planof 1heDy Agenda
Purpose:
Understand unit status + Ensure ownership and support + Recognize performance
+ Improve communications and teamwork Daily:
Plant Status - Units I and 2:
A.
[IHS] - Safety B.
lOps] -. Plant Conditions (Units 1&2)
C.
fOps] - Immediate attention (Pri 2)
D.
[Ops] - Operations' Dept concerns, activities, and priorities E.
[iOps] - Status control events (last event)
F.
fOps] - Regulatory notification / near misses G.
[Ops] - TSACs (active & potential)
H.
[Ops] - Nuisance alarms
- 1.
[Ops] - Operations' Housekeeping Report Operating Experience:
Surveillance Schedule Review:
A.
[PPG Mgr] week rolling schedule B. [PPG Mgr] - Equipment / system outages Chemistry / RADPRO Review. Units I and 2:
Integrated Schedule I System Outages:
A.
[Ops] - Operations' work week issues Unit Outage (if applicable):
Administrative:
A. [PPG Mgr] - Plant impact issues/Risk Action Items:
Round Table:
Z g,;
At 0
!ACEMAN:
Pagers:
AOM..............................................................
Chemistry Shift Supervisor............................
Industrial Safety.............................................
Maintenance.
Outage Manager.
Radiation Protection.
Shift Manager................................................
System Engineering......................................
X Work Week Manager
- Monday:
A. [EP] - Event Response duty list B. [Ops/Eng] - Fire Protection summary C. [Safety] - Industrial safety action item list & safety performance D. [Site Engineering] - Maintenance Rule 'Al' system review E. (Project Mgmt] - Major project status F. [Business Mgr] - Budget overview G. Excellence Plan review
- Tuesday:
A. [RP] - Annual dose summary B. [Security] - Security system status & compensatory measures C. [PPG] - Forced outage schedule D. [Site Eng] - Thermal cycle efficiency review E. [VP/Director] - INPO follow up & readiness F. [EP] - EP issues G. Human Performance H. Excellence Plan review
- Wednesday:
A. [Training] - Training B. [PPG] - Management Risk Observations C. [Ops] - Operator Workarounds D. [Ops] - Leakage list; oil & water E. [EP] - EP Drill Schedule F. [Engr] - Section Xl equipment in double frequency G. [MaintJOPS] - Housekeeping issues H. Excellence Plan review
- Thursday:
A. [EP] - EP Pager Test Results (as applicable)
B. (Engr] - Temporary Modifications C. (Ops] - Control Room Panel Deficiency Analysis D. [Ops] - Disabled alarms (Units 1 &2)
E. fOps] - Instruments Out-of-Service (Units 1 &2)
F. [PA] - CAP backlogs G. [Ops] - Out-of-Spec routine readings H. Excellence Plan review
- Friday:
A. [Reg Affairs] - Upcoming Licensing/QA Reviews B. [QA] - Quality Assurance update C. [Maint] -WR Backlog D. [EP] - Weekend coverage list (Units 1 &2)
E. [Engr] - Predictive Monitoring F. [PPG Mgr] - Next week's work week summary and highlights G. [Reg Affairs] - NRC/INPO Perf Indicators H. Excellence Plan review
Point Beach Nuclear Plant Outage 1R28 DAY Supporting Operational Excellence 29 Path
.p Picture Meets Outage Radiation Performance Doesn't Meet Exceeds
- 3.
gi IThis indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
49.604 Rem jDay 29 -May z I
Actual = 1.478 Cumulative = 49.604 Cumulative Forecast = 55.988 Daily dose and PCE goals reforecasted on 4/23.
Meets: <= 18 Exceeds: <= 12 Actual PCE's:
6 r-o sm.
ES Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure 20 18 16 M 14 C
x 12 a
10 8
0 4
2 0
09 0
0x a
0 0
60 2 0 2
6 1 1 1
2 6
0 3 8 0 2 4 6 8 1012141618202224262830323436384042 Actual Forecast inGoal 0 2 4 6 8 101214161820222426283032343638404244464850
NUCLEAR POWER BUSINESS UNIT PBNP DAILY CHEMISTRY STATUS REPORT Date: 05/04104 Time: 0:00 PARAMETER UNIT I UNIT 2 ACTION LEVEL(S)
REACTOR COOLANT Boron, ppm 3014 1235 NIA Lithium, ppm
<0.05 2.29 out of range Chloride, ppb
<5
<5
> 50 Fluoride. ppb
<5
<5
>50 Sulfate, ppb 24
<5
>50 Silica, ppb 4567 458 *
> 1000 at power Dissolved H2, cc/kg N/A 41.7
< 25, > 50 Specific Activity, uC/cc N/A 1.39E+0
>100 I E-Bar 100lE-Bar, uCVcc N/A 164.4 1-131 DE, uCicc NIA 2.23E-4
> 0.8 RWST Boron, ppm 2854 3072 S102, ppb 4140 5375 BDEB (last done dates) 4/28/04 0:50 4/14/04 6:00
% Solids 6.5 4.2
% Boric Acid 7.2 4.4 BAST A
% Acid - Date & Time 3.72 4/30/04 14:15 B
% Acid - Date & lime 3.73 4/30104 18:57 C
% Acid - Date & lime 3.71 513104 9:23 STEAM GENERATORS A
ljB A
B Action Level INPO CPI Chemistry Performance Index N/A 1.00
> 1.1 above 30% power (2)
(C P I)
P/S Leak Rate. gpd rN/A 0
> 30 or> 60 gpd / hr Cation Cond(1), uS/cm N/A NIA
.058
.057
> 0.8 Sodium. ppb
<1 5
0.1 0.1
> 5
> 0.8 Chloride, ppb 48.5 8
0.3 0.3
> 10
> 1.6 Sulfate, ppb 33.3 53 0.6 0.3
>_10
> 1.7 pH 10.03 9.96 9.76 9.74
< 8.5 FEEDWATER UNIjT I UNiTr 2 Action Level INPO CPI Iron, ppb NIA 1.475
> 3
> 5 Copper. ppb NMA 0.006
> 0.1
> 0.2 Dissolved 02, ppb NIA
< 5
> 5 pH NIA 9.68 CONDENSATE Action Level Dissolved 02, ppb N/A 3.4
N/A 2.9 NOTE: Bolded Items require action by Chemistry (2) Best allowable CPI Is 1.0 EMERGENT PROBLEMS / SIGNIFICANT ACTIVITIES I OTHER INFORMATION Priority Chemistry equipment currently OOS Both Ul Steam Generators are full and have the proper wet layup chemistry. (512/04) 4
Committed to Nuclear f cele Plant Status Report Plant: Point Beach Nuclear Plant Date: Tuesday, May 04, 2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit 1 is in refueling shutdown (Mode 6). Unit 2 is at 100% power.
Days Without LTA: 591 Homeland Security Condition: Yellow
'UnitI I
Unit2'-;-
PWR PWR MWE MIWE PWR PWR MWE MWE Mode Level (Gross)
(Net)
Mode Level (Gross)
(Net) 6 0%
0 0
1 100%
542.1 520.1 Days On Line: 0 Days Since Last Reactor Trip: 292 Days On Line: 166 Days Since Last Reactor Trip: 298
-'.:';i"'
- ' Technical Specification Action Conditions -
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days)
Spec Expected Number RTS Date Date Time Date Time Source 1
Out of 5/3/04 2221 Immediate 3.9.2.C No None B. Dungan 5/5/04 Range service.
Expiration Audible Count Rate 2RC-508, 2
Out of 11/9103 0749 31 Days 3.6.3.A 5/23104 1600 M. Rosseau 8/27/04 U2C RMW service.
lops 2
Out of 5/3/04 2123 72 Hours TLCO 5/5/04 1700 5/5/04 B. Dungan service.
3.7.6 EuipmentOutofServiceorDegraded Item l Unit Condition Date Time Work Order Number Due Date Responsibility NONE l
r
.Operational Problems / Concerns -
Item Unit Condition Actions Needed Due Date Responsibility C-01 Buzzer 0
Buzzer doesn't work, no sound.
Replace buzzer.
5/4104 J. Helbing 2RC-508, U2C 2
Valve comes off shut seat Coordinate plan with Plant 5/704 C. Hill Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2
Inadequate excess letdown flow.
Open and inspect, 2CV-285.
s5704 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2
Elevated indication, temperature.
4 step action plan is developed.
5/14104 B. Carberry Ejector Gas Monitor related.
Scheduled completion is 5/14/04.
Minor steam leak.
Prepare work package to repair leak 5n/04 J. Brander SGFP Discharge weekend of 05/22/04.
Temperature Element WO Initiation Tag #204297
_A*,*
A regateReviewof Issues
-i 7
Item J Unit Condition Actions Planned Due Date Responsibility NONE l
l l
Page 1 of 2 5
NCN Committed to Nuclear Excellenc
/"
Plant Status Report
- ..- x. - -:.
-..mReportableEvents' -::: ': '
Inadvertent TSAC 3.9.2.C, Source Range Audible Count Rate
- "g;. K
- :. :.. -I.
{.,Outstanding Operability Determinations.U:.;.i
- 1.
7' a
NONE "Protected Equipmen.,:t-.-.`,
2P-29, Aux Feedwater Turbine-Driven Pump I P-38AIB Aux Feedwater Motor-Driven Pump I P-32A,B,C,D,E,F Service Water Pumps / K-2AAB Instrument Air Compressors / K-3A/B Service Air Compressors I G-021G-031G-04 Emergency Diesel Generators I Unit I Nozzle Dam Panels and Associated Equipment
-Load Changes (Planned or Unplanned) -':'. :-:'-'; .
NONE Reactor Coolant System Leakage :-
Unit I Unit 2 Unidentified (gpm) 0 0.12 (No leak rate determined due to draindown)
Identified (gpm) 0 0.03
-.-. 5
.'::--; "'Major Tests and Evolutions Scheduled in Next 24 Hours
.;.'5 Unit 2, 2RMP 9071-1, 2RMP 9071-2, Train A/B undervoltage relays.
Unit 2, 21CP 2.1, reactor protection and safeguards analog. (White)
Unit 2, 2P-l I A, component cooling water pump maintenance.
Page 2 of 2 6
2 NMC C
ommitted to Nuclear Excellence Outage Status Report Plant:
Point Beach Unit I
- Day, Monday Today's Date / Time:
5/04/04 0400 Outage Duration: Day 31 Of Refueling Outage Number U1R28 Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage I
Summary:
Radiological Dose to date 49.604 Projected to date
- 55.988 Outage Goal
- 575 R Difference
-6.384 Number of PCEs 6
Summary:
- Reforecast on 4/23 Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Mode:
0 Hot Standby (Mode 3) 0 Hot Shutdown (Mode 4) 0 Cold Shutdown (mode 5) 0 Refueling Shutdown (Mode 6)
RCS:
Temperature:
83 Pressure:
Vented to Atmosphere RV Level:
Refueling Height Time to Boil:
33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br />
-'-4*
M*E; -s ShutdownSafety 'AssessmentProtectedEquipm ent::i.:
Unit I A and B Steam Generator Nozzle Dams and Associated Equipment Service Air Compressors: K-3A and K-3B
-' Major Activities Comleted in Last 2 Hours
.';Critical ath'ad Near Critical Pith A.
2
- RHR B Loop Work Window
- MOB Packages IWP-037-02
- RHR A Loop Work Window
- IP-15B SI Pump Seal Repair
- Reactor Head Repair Preparation
~
,~.
2K~S2 Sigifcat Outkiandln Iiii.
Date I
Issue
-Due Responsibility 4/28/04 1W-3BShroudFanBackdraftDamperFME 5/09/04 Terry Guay Scheduled A dual
~
Scheduled:
Ac'ualS -
Date____--Tire'___'Date Time '
Date Time D
Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 On-Line 4/30/04 0100 7
P a i N T B E A C H N U C L E A R P L A N T 05:51 Tuesday, May 4, 2004 12 WEEK SURVEILLANCES -
MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUl)
SCHEDULED DUE DATE JS LESS THAN OR EQUAL T005/04/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE lox 25%
DEFER ACT PRO 74 0308970 DA-03055B MR 8AI M-RELVLV REPLACE RELIEF VAL 02/13/2004 06/14/2004
.11/27/2004 02/02/2006.
COIAI PRO 74 0308971 D ------
0 M----------RE------REPLACE--RELIEF---VAL-02/13/2004---06/14/200----11/27/2004 02/02/2006.----C PRO 74 0308972 DA-03055C MN BAl M-RELVLV REPLACE RELIEF VAL 02/13/2004 06/14/2004 11/27/2004 02/02/2006.
COlW Pa1 40 0214362 ICP-02.001 IC CWI PBI-RP AND SG ANALOG T 12/29/2003 03/22/2004 03/29/2004 03/31/2004 04/12/2004.05/03/2004 NO-PX P51 40 0214363 ICP-02.007 IC CW1 Pal POWER RANGE NIS TE 12/30/2003 03/23/2004 03/30/2004 04/01/2004 04/13/2004.05/03/2004 NO-PX P91 40 0214364 IC.C.....B.....RP.AND.....ANALOG..T..01/05/2004...03/24/2004..04/05/200....04/02/2004...04/19/2004..0/320 NOP PB1 40 0214371 ICP-02.001 IC CWI P91-3 RP AND SG ANALOG T 01/07/2004 03/29/2004 04/07/2004 04/07/2004 04/219/2004.05/03/2004 NO-PX P51 40 9950082. ICP----------C
-...P 1 RP--LOGIC-TEST----T--02/03/2004--03/30/2004 04/03/2004--
04/05/2004--04/13/2004.05/03/2004--------
P91 40 0214375 CP-02.001 IC CUI PB1-3 RP AND SG ANALOG T 01/07/2004 03/31/2004 04/07/2004 04/09/2004 04/21/2004.05/03/2004 NO-PX PBI 76 02151182 AC02.
APR IC 1M2PI
-R1 CLOIBRATEST-0 TE 102/01/020/200 2
3/
00 055/2004 04/02/2004 05/25/2004 08/17/2004.0513200 BEMP PB1 76 0215122 ACP-024 APRI CM2 AR-4 U PNDER SREUNCLO RE 010/07/2002 04/01/2004 050/0404/08/2004 05/25/2004 04/23/2004.0513200 8EMP P91 76.
0215123
APR--M---A-R ERF--
E-UE-----REL-10/07/2002--04/01/2004 05/18/2004 04/08/2004---05/25/2004--08/23/2004.-------
Pa1l7 0215120 B03 APR 1M2 A-R-1 CALIBRATE 1A-03 TE 109/018/2002 04/01/2004 05/03/2004 03/020/2004 05/25/2004 08/04/2004.
128EM P51 77 0301951 AV-029 EPT 1M2 ARIT-0 STC HCVALVBAE1A E
109/201/2002 04/01/2004 05/04/2004 03/22/2004 05/25/2004 08/06/2004.
128EM PS1 77 03019542 A52-034B EPT M2 AS-R~
U1ST-CHECKUVALV CL 109/26/2002 04/01/2004 05/04/2004 03/28/2004 05/25/2004 08/123/2004.
128EM PB1 76 0216170A 14EBAR EMR 1M2 E-M1 INSPFQEC AND Y
MAINT 10/04/2002 04/01/2004 05/07/2004 04/05/2004 05/25/2004 08/20/2004.
128EM PB ---
76
-0210963 -------- EM
E
2 YEAR
-ELE --
TRICAL 06/15/2002--04/01/2004---06/14/2004-----0-/05/2004--09/10/2004.--------
P50 76 02151408G-03 EMR 1M2 A-RI MONIBRTOR 1
0 EMR ENC 09/17/2002 04/01/2004 04/06/2004 03/19/2004 05/25/2004 08/03/2004.
128EM PBI 76 0300803 ICP-0208 IC 3M2 lP91-1 NI-AXIAL X
OFFSET CA 51/08/2002 04/01/2004 05/28/2004 05/107/2004 05/25/2004 09/24/2004.
128EN PB1 76 030080 ICV-0200958 IC M2 P5 01-NISPOWERK RANGE VE 109/21/2002 04/01/2004 05/29/2004 04/22/2004 05/25/2004 09/06/2004.
128EN Pa1 76 0300806 ICV-020301O P IC M2 IS tSOURCHE RANGE NST 109/11/2002 04/01/2004 05/07/2004 04/128/2004 05/25/2004 08/27/2004.
128EC P51 -
76
-0300807 ---
P5---
REACTOR PROTECTION 10/06/2002 04/01/2004 04/30/2004--
04/07/2004--05/25/2004-05/22/2004.
1C PSI 76 0300105 ICV-020383 E IC M2 PS RPSSTCEM TRIPE LO 109/14/2002 04/01/2004 05/25/2004 04/15/2004 05/25/2004 08/30/2004.
128EC PS...
76
.0300811 ---
C IC --
2 1---RP
-SYSTEM --
AUT-MAT 10/06/2002
-04/01/2004 --
05/09/2004--04/07/2004--05/25/2004-08/22/20--4-------
P91 76 0300812 FICE-BARR18 IC M2 P5-MI RXSPETRI AND MITU 10/05/2002 04/01/2004 05/08/2004 04/06/2004 05/25/2004 08/21/2004.
128EM PR1 76 03100813 GCP02019 IC 114 A1-STR 2 SAEGARD ELOGTICAT 106/05/2002 04/01/2004 05/124/2004 040/20 05/25/2004 08/210/2004.
C1A81 PO1 76 03008148 C-02.020 IC M2 B-L RMONDTO EMEGEANALGY 09/29/2002 04/01/2004 05/18/2004 03/319/2004 05/25/2004 08/15/2004.
128EM PB1 76 03001549 CG-02.0 IC M2 P-RD RPONDTO EMEGEANALGY 09/29/2002 04/01/2004 05/17/2004 03/319/2004 05/25/2004 08/15/2004.
128EC
P 0 1 N T 9 E A C H N U C L E A R P L A N T 05:51 Tuesday, May 4, 2004 2
12 WEEK SURVEILLANCES -
MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUl)
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T005/04/2004 UNITST W.RK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE lox 25%
DEFER ACT Pa1 76 0300816 ICP-02.020 IC 1HZ P91-WH RP AND SG ANALOG T 09/29/2002 04/01/2004 05/18/2004 03/31/2004 05/25/2004 08/15/2004.
1281C PB1 76 0300817---IC 2.0-0 IC
-I -----
1-Y
-- RP AND ANALOG T
-09/29/2002 04/01/2004 05/18/2004--03/31/2004-05/25/2004 08/15/2004.----2-1C Pa1 76 0300818 ICP-02.020 IC 1H2 PS1-Yt RP AND SG ANALOG T 109/14/2002 04/01/2004 05/25/2004 04/15/2004 05/25/2004 08/30/2004.
1281C P91 7 0300819 ICP-02.020 IC IMZ PB1-2 RP AND SG ANALOG T 10/14/2002 04/01/2004 05/25/2004 04/15/2004 05/25/2004 08/30/2004.
1281C P91.76.030836.....
0.022..
IC.. M2....1.CONTA..
NMENT..
SUMP. L 09/19/2002...04/01/2004..05/19/2004 03/21/2004 05/25/2004..08/05/2004.........
Pal 76 0300840 ICP-02.020 IC IMZ PB-lOPS AND CRNAOSSOVE 10/04/2002 04/01/2004 05/07/2004 04/05/2004 05/25/2004 08/20/2004.
1281C PS1 76 0300841 ICP-04.022 IC 1HZ PSI CONTA.29-1 RUPI IN 09/22/2002 04/01/2004 04/27/2004 03/24/2004 05/25/2004 08/08/2004.
1281C PB1 76 0300842 ICP 04.028 IC 1M2 P91-CPS 4.29-CORS-3ER 10/15/2002 04/01/2004 05/26/2004 04/16/2004 05/25/2004 08/31/2004.
1281C Psi 76 0300844 ICP-04.024 IC 1HZ PS1 CONTAIN9EN HYROGIN 09/29/2002 04/01/2004 05/03/2004 03/31/2004 05/25/2004 08/15/2004.
1281C PB1 76 0300896 ICP-04.029 IC 1H2 P91-SV/AS RP29 MARIX3 10/17/2002 04/01/2004 05/27/2004 04/18/2004 05/2512004 09/02/2004.
1281C P91 77 0215885-----T--OOO-A-0----M OT IT-alA,--
H-GH-HEAD 10/10/2002--
04/01/2004-05/22/2004 04/11/2004- 05/25/2004--08/26/2004.05/01/2004 0P PB1 77 0215886 OICP-0403A IC6 IM2 PBT COT-0AINMNTHRYPUMP 09/28/2002 04/01/2004 05/01/2004 03/30/2004 05/25/2004 08/14/2004.
1281C P91 77 02185089 OITP-0075 P IMC GOT-0 GT-01DISELCNTSRAY 106/07/2002 04/01/2004 05/18/2004 040/20 05/25/2004 08/23/2004.05/201/2004 COIAP P51 77 0215892 0ICP-10150 OPC 1M2 PBI IS-9T UNIT 1MATMI 10/13/2002 04/01/2004 05/24/2004 04/14/2004 05/25/2004 08/029/2004.
1281C Pal 77. 0215895 O-IT-02001 0P6 IM2 OT IT-201, UIG CLASS 110/14/2002 04/01/2004 05/25/2004 04/15/2004 05/25/2004 08/30/2004.050/041280P PS1 77 0215899 0-IT-0200A 0P6 1H2 OT IT-203AH PUlMS ST 09/18/2002 04/01/2004 05/08/2004 03/20/2004 05/25/2004 08/04/2004.
1280P Pa1 70 0215901 0-IT-09003 0P6 1HZ OT IT-2038, LOW2 HADFP 10/14/2002 04/01/2004 05/24/2004 04/15/2004 05/25/2004. 08/30/2004.
1280P P91 70 02158902 0-IT-0009C 0P6 1142 Or.
IT-2058, COMPLT SRY10/07/2002 04/01/2004 05/318/2004 04/08/2004 05/25/2004 08/23/2004.050/041280P P-1 7-7 0-2-1589"06 OIT-03008C 0P6 iHZ O-T I-T-3-008C-,
UNT 0AFP-M1 FE-10/04/2002 0-4-/01/2-0-0-4 0-5/-07/-2-004 04/05/2004-- 0-5/25-/-20-0-4 0-8-/20/-200-4.------- 1 2 8 0 P --
PS1 77,02158910 0-IT-0230 0P6 1HZ OT IT-230, UNT 1LACON 10/04/2002 04/01/2004 05/18/2004 04/05/2004 05/25/2004 08/20/2004.
1280P PB1 77 02158917 OIT-02800 0P6 1M2 OT IT-280D, lRPM PROG 09/30/2002 04/01/2004 05/08/2004 04/201/2004 05/25/2004 08/06/2004.
1280P Pa1 77 02159241
-IT-02908 0P6 1HZ OT IT-29OO, UPl2REACTO 10/10/2002 04/01/2004 05/04/2004 04/11/2004 05/25/2004 08/26/2004.
1280P Pal 77 02159025 OIT-0290C 0P6 1HZ OT.
IT-290C, UNIPLTE1H 10/08/2002 04/01/2004 05/09/2004 04/09/2004 05/25/2004 08/24/2004.
128NP P91 77 0215927 0-IT-03700 0P6 1HZ OT IT-7300, UNISPRAYFE 10/07/2002 04/01/2004 05/11/2004 04/08/2004 05/25/2004 08/23/2004.
1280P P91 77 021590804 I-T-03G20 P6 1HZ OT ITS-30, I1CV-3R1OAN 10/012/2002 04/01/2004 05/22/2004 04/13/2004 05/25/2004 08/28/2004.
1280P P91 77 021690 05 -T-0330 0P6 1HZ OT ITS-30, UN IGH/LCOU 10/13/2002 04/01/2004 05/218/2004 04/14/2004 05/25/2004 08/29/2004.
1280P
P 0 1 N T B E A C 11 N U C L E A R P L A N T 05:51 Tuesday, May 4, 2004 3
12 WEEK SURVEILLANCES -
MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUl)
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T005/04/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE lox 25%
DEFER ACT PSI 70 0216006 O-TS-035.2 0P6 1H2 OT TS-35, UNIT 1 CONT 10/12/2002 04/01/2004 05/23/2004 04/13/2004 05/25/2004 08/28/2004.
1280P P81 77 0216007 0-TS-039 0P6 1M2 OT TS-39, UNIT 1 MSIV 10/16/2002 04/01/2004 05127/2004 04/17/2004 05/25/2004 09/01/2004.
1280P PBl 76 0305079 PT-RCS-l EPI 1HZ I-PT-RCS-I RCS PRESSURE TEST 01/22/2003 04/01/2004 05/25/2004 07/24/2004 05/25/2004 12/08/2004.
128EN PSI 76 0214137 RC-00434 MMV 3A2 M-R3 REMOVE AND SHIP VA 04/01/2004 04/09/2004
. 07/19/2004 12/30/2004.
128MM P81 40 0214138 RC-00434-L HMV 1HZ M-R HISTORY REVIEW AND 10108/2002 04/01/2004 05(03/2004 04/09/2004 05/25/2004 08/24/2004.
128NS PSI 77 0301878 RE-00126 HP 1H2 RMSCALAPR. IRE-126/IRE-I27/lR 09/28/2002 04/01/2004 05/18/2004 03/30/2004 05/25/2004 08/14/2004.
128RP P91 77 0213863---R-SP--3.1
--RE------RE PRI--
ARY-SYSTEM--TES-10/16/2002--04/01/2004 05/26/2004 04/17/--0-4--05/25/2004--09/01/2--04.------
PSI 77 0213864 RESP 4.1 PRE 1HZ RE PINITALY CRSTECALT 10/16/2002 04/01/2004 05/26/2004 04/17/2004 05/25/2004 09/01/2004.
128EN PSI 77 0213865 RESP 5.2 PRE IM2 RE REITESTS DURINGCAES 10/29/2002 04/01/2004 05/27/2004 04/30/2004 05/25/2004 09/014/2004.
128EN Pa1 77 02138651 RESP 6.2 PRE IH2 RE VERF RCSS FLOWN EA 102/1/2003 04/01/2004 05/30/2004 08/130/2004 05/25/2004 012/2/2004.
128EN P91 76 0301904 SI EPI 3A2 SI-1PT-2 VT-2 ASME XI PERIO 05/03/2001 04/01/2004 05/18/2004 05/02/2004 07/19/2004 01/30/2005.
128EN PSI 7 0301905 SI EPI 3A2 SI-1PT-6 VT-2 ASME XI PERIO 05/08/2001 04/01/2004 05/25/2004 05/07/2004 07/19/2004 02/04/2005.
128EN PsI 76 0301986 SNUBBERS EPT 1H2 M-R-I VISUAL SNUBBER INS 10/05/2002 04/01/2004 04/08/2004 04/06/2004 05/25/2004 08/21/2004.
128EN PB1 76 0214145 SNUBBERS MM 1HZ M-R-3 INSPECT STEAM GENE 10/13/2002 04/01/2004 05/25/2004 04/14/2004 05/25/2004 08/29/2004.
128MM P91 77 0407987 TS-AF-001 0P6 1H2 OT DOCUMENTATION OF A 04/01/2004 05/25/2004 08/14/2004.
Pa1 60 0301907 Ul-CONTAIN EPI IM2 CG-COREINS VISUAL/ULTRASONIC 10/02/2002 04/01/2004 04/18/2004 04/03/2004 05/25/2004 08/18/2004.
128NS
.~PB1 60 0301908 Ul-CONTAIN EPI 1M2 CG-KEYINSP VISUAL INSPECTION 09/20/2002 04/01/2004 04/04/2004 03/22/2004 05/25/2004 08/06/2004.
128NS PBI 77 0301909 Ul-CONTAIN EPI 1M2 CG-VT3GA CONT INSPECTION 1W 10/04/2002 04/01/2004 04/30/2004 04(05/2004 05/25/2004 08/20/2004.
128EN PSi 77 0301910 Ul-CONTAIN EPI IH2 H-A INSPECT CONTAINMEN 10/04/2002 04/01/2004 04/28/2004 04/05/2004 05/25/2004 08/20/2004.
128EN P81 76 0306921 IICP-02.02 IC 1H2 Pal-STARTU POWER RANGE NIS TE 07/17/2003 04/01/2004 05/09/2004 01/16/2005 05/25/2004 05/22/2005.
1281C PSI 76 0300972 IICP-04.01 IC 1M2 P91 FIRST STAGE PRESSU 09/27/2002 04/01/2004 04/23/2004 03/29/2004 05/25/2004 08/13/2004.
1281C P91 76. 0307
IC------P----
AFW-C--
AR---
G--
FLO-- 10/07/2002---04/01/2004- 04/30/200404/08/200405/25/200408/23/200.................
PBI 76 0300976 IICP-04.03 IC 1M2 PB1 TURBINEHALVE CALOW 10/06/2002 04/01/2004 05/304/2004 04/07/2004 05/25/2004 08/22/2004.
1281C PBI 76 0215240 162P-A4 E C M 2 -R TURBINE VANDE CALI 109/25/2002 04/01/2004 05/18/2004 03/27/2004 05/25/2004 08/11/2004.
1281C P81 76 0215246 162/Al EM 1HZ E-R CAIBRATE1 AND TEST 109/03/2002 04/01/2004 05/05/2004 04/04/2004 05/25/2004 08/19/2004.
128EM P-S-76 0301678 62
/A EM TH2
-E--7--SEVENTH YEAR--UV
-flu 04/01/2004 05/22/2004 12/30/2004 02/14/2006.
1-28N5-------
Pa1 71 0215247 621A02 EM 1HZ E-R CALIBRATE AND TEST 10/01/2002 04/01/2004 05/19/2004 04/02/2004 05/25/2004 08/17/2004.
128EM P81 71 0301677 62/AOI EM TM2 E-R7 SEVENTH YEAR UV RU 04/01/2004 05/22/2004 12/30/2004 02/14/2006.
128NS PBI 77 0215811 62/AO2TO OEi 1M2 EOT CALNRTISLVVE ANDTS 103/012/2004 04/012/2004 05/04/2004 04/12/2004 04/15/2004 04/18/2004.
128EM Pa1 77 021585 2/AO2TS EM3 0P34W OT TSEVAENIT 1EA TUVRB 32020 04/017/2004 05/27/2004 042/20 04/20/2004 04/24/2004.
128NS PI 760 03003967S084 M
CHEM-SAMPLLV CEPACCCEITUI 1 ELI ACUMLA 04/22/2004 104/22/2004 04/125/2004 104/029/2004.1001205 0Al PB1 470 9950079T ICOP-02.
OIC 1Ml Oi-RPN LOGI TALES ANT 02/126/2004 04/22/2004 05/03/2004 04/126/2004 04/28/2004 05/06/2004.05/8/204 2N P51 40 030075820T CP0203A5IC 8W1 P1-TSG LOG IC ET I TUR 02/26/2004 04/22/2004 05/03/2004 04/26/2004 04/28/2004 05/06/2004.052/041280P Pa0 76 0215479 0-ITS 033 OPI CWI OT ITS-i, P-12A/BSPEN 01/230/2004 04/23/2004 05/03/2004 04/230/2004 05/023/2004 04/14/2004.05/7/00 8BSP
P 0 I N T B E A C H N U'CIE AR P L A N T 05:51 Tuesday, May 4, 2004 4
12 WEEK SURVEILLANCES - MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE W4E4920.PBNP.TRENDING/P90071.0PS.PROGRAMS(TSPECSUI)
SCHEDULED DUE DATE IS LESS THAN OR EQUAL TO05/04/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE 10%
25%
DEFER ACT PSI 77 0215848 TS-CCW-001 0P3 IM2 OT CC SYSTEM VALVE P0 03/25/2004 04/25/2004 05/03/2004 04/25/2004 04/28/2004 05/01/2004.
B06B1 Pal 77 0215838 0-TS 032 0P2 4W1 OT TS-32, MISCELLANEO 03/29/2004 04/26/2004 04/26/2004 04/29/2004 04/29/2004 05/03/2004.
906B1 Pa1 76 0300740 ICP-13.002 IC CWI P91 CONTAINMENT HYDROG 02/03/2004 04/27/2004 05/04/2004 05/04/2004 05/06/2004 05/18/2004.
90691 PB1 77 0303210 TS-ECCS-00O0P3 4WI OT SAFEGUARDS SYSTEM 03/28/2004 04/27/2004 05/03/2004 04/28/2004 04/30/2004 05/02/2004.
90691 P90 60 0301810 G-04 EM Gal E-A2 2 YEAR ELECTRICAL 07/20/2002 04/30/2004 07/12/2004 07/04/2004 10/15/2004.
CO5Al P90 70 0300727 ICP-13.007 IC G01 G-04 G-04 DIESEL INSTRU 07/19/2002 04/30/2004 07/12/2004
. 07/04/2004 10/14/2004.07/19/2004 C05Al P90 77 040627 O-PC-026.8 0P3 lul OT WEEKLY CSD PRIMARY 04/23/2004 04/30/2004 04/03/2004 04/30/2004 04/30/2004 05/01/2004.
1280P PR0 60 0301098 G-04 MM Gal M-A2 INSPECTION AND MAI 08/20/2002 05/01/2004 07/12/2004 07/05/2004 11/15/2004.
CO5Al PB2 77 0216159 0-IT-0095 0P3 CWI OT IT-95, UNIT 2 ATMO 02/07/2004 05/01/2004 05/21/2004 05/08/2004 05/09/2004 05/22/2004.05/22/2004 809AI PRO 77 0301276 0-TS-076 OPO 3M2 OT TS-76, AUTOMATIC 5 02/01/2004 05/01/2004 05/13/2004 05/03/2004 05/10/2004 05/23/2004.
B0892 P92 77 0216098 0-TS-004 aP1 cW1 OT TS-4, U2 MAIN TURB 02/08/2004 05/02/2004 05/21/2004 05/09/2004 05/10/2004 05/23/2004.05/23/2004.909A1 P92 77 0216099 PT-MS-003 OPI CWI OT CROSSOVER STEAM DU 02/08/2004 05/02/2004 05/23/2004 05/09/2004 05/10/2004 05/23/2004.05/23/2004 B09Al P90 77 0300197 CHEM-SAMPL CH iW BAST BORON BAST BORON TSR 3.5 04/30/2004 05/03/2004 05/03/2004 05/07/2004 05/03/2004 05/08/2004.
ROMA P91-77-0300403-C--EM-SAMPI
-RCS BORO-N SR-3.9.1 05/01/2004-05/03/2004--05/03/2004- 05/08/2004..05/03/2004.05/09/2004........
P92 77 0300483 CHEM-SAMPL CM 1141 RCS BORON RCS BORON SR 3.9.1 04/29/2004 05/03/2004 05/03/2004 05/06/2004 05/03/2004 05/07/2004.
B07A2 P91 --
77-0300360 CHEM-SAMP CM
-i----RC CL
-RCS -
CL-TSR-3.4-5.2 04/26/2004 05/03/2004 05/03/2004 05/03/2004- 05/03/2004--
05/04/2004.----7A2 P92 77 0300500 CHEM-SAMPL CM 1141 RCS BORONRCS CLRO TSR 3.9.5.
04/30/2004 05/03/2004 05/03/2004 05/07/2004 05/03/2004 05/08/2004.
807A2 P91 77 0300373---C-EM A--L-CM DO
-RCS--DO-TSR--.4 5-1-04/30/2004 05/03/2004 05/03/2004-05/07/2004--05/03/2004--05/08/2004.-------
PB2 77 0303051 CHEM-SAMPL CM 1141 RCS CLO RCS DO TSR 3.4.5.1 04/306/2004 05/03/2004 05/03/2004 05/07/2004 05/03/2004 05/08/2004.
807A2 P91 77 0300429 CHEM-SAMPL CM 1141 RCS SPC ARCS GROSS ACT4VITY 04/27/2004 05/03/2004 05/03/2004 05/04/2004 05/03/2004 05/05/2004.
807A2 PS1 77 0300442 CHEM-SAMPL CM 1WI-RCS2DO RE22 ISO TOPI 345104/27/2004 05/03/2004 05/03/2004 05/04/2004 05/03/2004 05/05/2004.
B07A2 P92 77 0300552 CHEM-SAMPL CM iWI RE-229 RE-2 ISO TOPI 345104/29/2004 05/03/2004 05/03/2004 05/06/2004 05/03/2004 05/07/2004.
907A2 PB1 77 0300471 CHEM-SAMPI. CM 4W14C SECEUM A RSEODR GROSS ACTVY 04/127/2004 05/03/2004 05/03/2004 05/134/2004 05/06/2004 05/17/2004.
807A2 PB1 77 0300387 CHEM-SAMPL CM 1141E22 RE-229 S
IBOFOPGMM ICA 04/27/2004 05/03/2004 05/03/2004 05/04/2004 05/03/2004 05/05/2004.
807A2 P92 77 03005526 CHEM-SAMPL CM 1141E22 RE-2F29SGSDF OPGIM CA 04/30/2004 05/03/2004 05/03/2004 05/07/2004 05/03/2004 05/08/2004.
9 07A2 PB0 77 03014471 CE-TSAM9 PL CH 2 OTI SE I
TSECONTAY ROLS ROO 04/012/2004 05/03/2004 05/03/2004 05/02/2004 05/06/2004 05/08/2004.
B07A2 P81 77 0301560 TSE-ECS-OMPL C MH OT E~UI SAEGUNARD GRSYSTEMS 04/02/2004 05/03/2004 05/03/2004 05/03/2004 05/06/2004 05/109/2004.
B07A2 P80 77 03013878 THMS-AFWP0 CH2 I1M ST F
ABFOSSE VALVE SAN 04/01/2004 05/04/2004 05/04/2004 05/02/2004 05/07/2004 05/08/2004.
907A2 P82 76 03005133 CHEMU REL EM 04/TES30/TRIN04U 05/04/2004 05/04/0405/07/
200 05/07/2004 05/11/2004.
BO7A2 PRO 76 0305204 TSAF2 02VP EM E-OT SATIONSTECH SPLECA 40120 05/04/2004 05/04/2004 050
.20 05/04/2004 05/05/2004.
B07A2
Run Date 03MAY04 13:59 Work Activity Risk Assignment Sheet 1 df 2 GRP HPE EQUIPMENT Av Cal DUR I START FINISH 4li MAY Fd7 at8r*-Suri9 Moij 3 61 '1008,16iO,8.1.816lO,8,16l..6I0l8.
MonAt
~I ~
T~RISK Description ID 16N,a,1 8I I
CEI600R001 76 CE8 DR-Y ML-Y R-1 MOBILIZE REPAIR CREW, 1
91 03MAY04 07MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M TRAINING AND BADGING 1Z:00 06:59 213476 - 128CE 1
CEI600R005 76 CE8 DR-Y ML-Y R-1 OFF-LOAD REPAIR 1
10 04MAY04 04MAY04 E2REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M EQUIPMENTAND MOVE INTO 14:00-23:59 0213476. 128CE 1
CEI600RO10 76 CE8 DR-Y ML-Y R-1 SETUP EQUIPMENT FOR 1
24 05MAY04 06MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M CUTTING THERMAL SLEEVE 07:00 06:59 0213476 - 128CE z
i U[*
w5 t^
E I U 1
EM0216638A 76 EM DR-N ML-N P-001B-M P-lB RE-ASSEMBLY OF 1
56 01MAY04 05MAY04 IREACTOR COOLANT PUMP MOTOR ORT3-N R-M MOTOR 18:OOA 19 59 0301756 128EM 2
EM0305106 76 EM DR-N ML-N D-205 MONTHLY NON-SAFETY 125V U
4 03MAY04 03MAY04 125V DC STATION BATTERY ORT3-N R-M DC STATION 13:00' 16:59 0305106 - B07A2 2
EM0305117 76 EM DR-N ML-N D-205 QUARTERLY NON-SAFETY U
4 03MAY04 03MAY04 125V DC STATION BATTERY ORT3-N R-M 125V DC STATlON 13:00-16:59 0305117 - B07A2 2
EM0305128 76 EM DR-N ML-N U2A-UV RELAYS TEST U2TRAIN A U
3 04MAY04 04MAY04
[TRAINA4.16KVAND48oVSWITCHGEARRELAYTEST ORT3-N R-M UNDERVOLTAGE AND 12.00-14:59 0305128 - B07A2 2
EM0305133 76 EM DR-N ML-N U2B-UV RELAYS TEST U2TRAIN B U
3 04MAY04 04MAY04 OTRAIN B 4.16 KVAND 480 V SWITCHGEAR RELAYTEST ORT3-N R-M UNDERVOLTAGEAND 15:00-17:59 0305133 - B07A2 307192 76 IC DR-V ML-Y Z-016 Z16 CONTINGENCY 11 5
03MAY04 103MAY04 REACTOR CAVITY MANIPULATOR OR3YRM TROUBLESHOOTER 06:00A 16559 0 7192 - 1281C 2
1C0301006 76 ICS DR-N ML-N ICP-02O001 RP AND SG ANALOG TEST 5
5 =
04MAY04 104MAY04
[OREACTOR PROTECTION AND SAFEGUARDS ANALOG ORT3-N R-M l WHITE j
07:00l 11:59 0301006 - B07A2 1
IC4.39STK 76 IC5 DR-Y ML-Y 1ICP-04.039-1 ICP 4.39-1 GOVERNOR VALVE 5
40 04MAY04 OXMAYD4 0EV EZTURBINE VALVE CAIBRATIONFUNCT ORT3-NRM STROKE 1000 1659 0300976-1281C I
MM021=6627 76 MW DR-NML-N 1296 CV-1296-INSTALL NEW TRIM 8
27APR04 03MAY04 AUXILIARY CHARGING LINE ISOLATION ORT3-N R-M PERMOD02-027 08:OOA 20.59 216627-128MM 1I MM0303680A 76 MMV DR-Y ML-Y MS-02005 lMS-2005-PERFORMMOD 5
1 01MAY04 03MAY04
!HX-IBSGHEADERSAFEIY ORT3-N R-M FOR ROUNDED ENTRANCE 11:00A 12:59 303680 128MM I
MM0303681A 76 MW DR-YML-Y MS-02010 1MS-2010-PERFORMMOD 5
30 03MAY04 06MAY04 3G HX-1ASGHEADER SAFETY ORT3-Y R-M FOR ROUNDED ENTRANCE 12O00 0859 303681 128MM I
MM0303680B 76 MW DR-Y ML-Y MS-02005 1MS-2005-REINSTALLVALVE U
10 05MAY04 05MAY04 CEHX-1B SG HEADER SAFETY ORT3-N R-M AFTER MOD 2359 0303680 - 128MM 0 =P0211062 77 DR-N ML-N O-IT-007D r-07D. P-32D SERVICE U
2 05MAY04 05MAY04 OP-32D SERVICE WATER PUMP TEST I
ORT3-N R-M WATER PUMP
.1000
. 11 59 0211062 - B07A2 0
OP0211070 77 OPO DR-N ML-N l04T-0007E lIT-07E, P-32E SERVICE U
2 05MAY04 05MAY04 OP-32E SERVICE WATER PUMP TEST O
ORT3-N R-M WATER PUMP 1O0 1359 0211070'- B07A2 0
OP0301061 77 OPOD DR-N ML-N l
IT-OW7F IT-07F, P-32F SERVICE WATES U
2 05MAY04 05MAY04 OP-32F SERVICE WATER PUMP TEST ORT3-NR-M PUMP 14:00 15:59 0301061 - B07A2 NMC / WE LT-81 HUMAN ERROR RISK BARCHART
___________________________FL-81 HUMAN ERROR POTENTIAL CIUM A" PBNP U1 Refueling 28 Outage O Primavera Systems, Inc.
Run Date 03MAY04 13:59 Work Activity Risk Assignment Sheet 2 if 2 Ul ACT lWOI GRP HPE EQUIPMENT Activity Cal DUR START FINISH MAY ID ST
~
RISK Description ID El aIi U El
-,8,1 0
OP0301281 77 OPO DR-N ML-N O-IT-0007G rT-07G. SERVICE WATERMOV U l 4 05MAY04105MAY04
[SERViCE WATER MOV TESTING ORT3-N R-M lTESTING M
U 16 00 20s59 0301281 O OP0301447 77 OP3 DR-N ML-N O-TS-009 TS-9, CONTROL ROOM HIV 3
24 03MAY04 06MAY04
__C O N
TTOL ROOM HEATNGNENnLAToN SYSTE ORT3-N R-M SYSTEM CHECKS 16 00' 18 59 0301447 - B07A2 2
OP0301632 77 OP3 DR-N ML-N O-PC-058 H2 SEAL OIL SYSTEM TEST 3
1 03MAY04 03MAY04 GHYDROGEN SEAL OIL SYSTEM ORT3-N R M 16:00 16:59 0301632 - B07A2 013SAGO1-8 OPS DR-N ML-N RE-ALIGN G-02 TO 2A-05 I
1 03MAY04 03MAY04 I
ORT3-N R-M 14o00 14:59 B07A2 0
0135AG02-C OPS DR-N ML-N G4O2 ALIGN G-02 T0 1A-05 & 2A-05 1
1 04MAY04 04MAY04 i
ORT3-N R-M FOR 1B-42 OUTAGE 01:00 01:59 1
SOP-B04B OPS DR-N ML-N B-42 DE-ENERGIZE 1B42 PER 1
4 04MAY04 04MAY04 0
ORT3-N R-M 1-SOP-480B04 02.00 05:59 1280P 1
SOP-841B OPS DR-N ML-N B-41 DE-ENERGIZE 18-41 PER U
2 04MAY04 04MAY04 0
ORT3-N R-M 1-SOP-480-02 19:00 20:59 1280P NMC I WE LT-81 HUMAN ERROR RISK BARCHART
~FL*R1 HUMAN ERROR POTENTIAL PBNP U1 Refueling 28 Outage 0 Prmavera Systems, Inc.
POINT BEA CH NUCLEAR PLANT Approved FORCED O UTA GE LIST UNIT 2 As of: May 4, 2004 JA\\Data\\NTP\\P\\Outagc\\Scopc\\Unitgeneric\\Forcov.ppt
Point Beach Nuclear Plant Unit 2 As otf SLOG Forced Outage List Scaffeu Tqeequ~Asd JNotbwia Prbe~rrdnEqsdpmfftM Appv-,d R-w s
Do e
e raw Pr i~
aot0 RWr#ImW do mefablt c"'
. W' (ETA)
_Y N HOT SHUTDOWN 0310241 Packing adjustment was anempted usder tool CS-00134 Y
MM N. Suant S
1618 32 3
71 HSD 2CS CS.134 N
u R -Y Approved at the 3/30/04 ORC pouch 1018609. No adjustment lefL Gland Is lydrazine Control x - 6696 MM RevO-I meeting.
boomied oQ. Packing leak (Ret: CAP054016)
Samle Isolation 03105S6 Valvenotcopeningf lly. PerSys ENG-MS-02087 Y
.l.elbmg 6
2/2 10 5
75 HSD 2MS MS-N N
N Approved attlhe 217104 ORC potential psitoner fault ATI odthr signals IIX-22B MSR Inlet x - 6414 2067 IC meeting.
calling for fllen. PoTdoner signal out 351*
Stem Control RevO-I should be '70.
Perform flow scn COLD SHUTDOWNACTIVITIES 0310231 Open and inspect2CV-285 for flow restriction.
CV-00285 Y
MM N. Stuatl 30 3
76 CSD 2CV CV-285 Y
N Approved at the 2/17/04 ORC Borascope linestiream and downstream, ff X-4 ELIlX Outlet x - 6696 EMRvO-1, llmeeting.
possible, or through vent and drains a pracl
-tc 2-1; MM todete nnineifobstrctiontexist. Reft:
RevO-CAP051746. OWA2403R-403 0406040 Remove blind fange (temp roo and install VNPSE-03212 Y
MM N. Stuart 60 3112 75 6
75 CSD 2VNPSE-3212 Y
Scaff-Y Approved at the 1/6/04 ORC vaive to support forced shadown. Reinstall W-6A/B U2C Purge l
- 6696 MMRev0-1 &
meeting. (woorderIchmngedon tempmodO3-036. ContingencyWO.
Exhaust Fin Suction 1-1 2f24 from 0130052 to 0406040 per 0406041 Remove blind flange (temp mod) and ostall VNPSE-03244 Y
MM N. Stuart 60 3112 75 6
75 CSD 2VNPSE-32444 Y
Scaf-Y l Approved at the IJ6/04 ORC valveto support forced shutdown. Reinstall W-2A/B U2C Parge x.6696 MM Rev0-l &
meeting. (wo order I changed on tcmpmodO3-036. CotingencyWO.
Supply Fan DIscharge 1-1 2/24 from 0130054 to 0406041 per IKelly Thillips.)
85% POWER REDUCTION 0207017 [Clean ou ix. Removezebranuse.
Clean l
lX424 l
Y MM N Sturt 8
212 12 5
75
<l5%
2CS HX-24 1 N l
N Y MOD Approved at4/4/01 ORC.
ltubes (inet end only). To be performed durng l
Condensate Cooler x-6696 212 power MMRevO-1
_ d__ power or forced outage.
50% POWER REDUCTION 0206810 Clesn/mspect(2 & 3) waterboxes. Forced CW Y
l MM N. Stuart 20 4/4 28 5
73
<50%
2CWWtrBox N 7 N
YMOD Approved at5116/01 ORC. Perform outage*. RefernceWO 19944169.
or CW SystemMtitl x-6696 power 2/31RevO-l at <50% power HSDorCSDwIth downpower-cowact Steve Barkhalhi for and/or Non-tnmbered CW off in that watesbox.
,Adm a.
equipment I
I I
I I
IIIIIIII_
02068I Cleanipect l &4 4)waterboxa. Forced
- CW Y
l MM N. Stuart 20 4/4 28 5
73
<50%
2CWWtr N
N YMOD Approved at5/16/01 ORC. Perform outage-. Reference WO #9944169.
or CWSystemMultl x-606 power Box l/4RevO-at < 50% power lSD orCSD with downpower
- conact Steve B-ahalin for and/or Non-sanhbered I
CW off in that atesbox.
rea'd/nA.
I euipment Page I SCOPEnitFoteO5O420OWrbotxh
Point Beach Nuclear Plant As o: 5r3/204 Unit 2 Forced Outage List Scaffeld TadRequfrad Hfatnfa ProUmDacr4lim EqspimnlD AppiewJ Rap 0
- Die, ReMre DW a
PAC T
RWN aN EquipmomSdNom, 1',v C~mrow
& PuT Dar stowae CNEW001a YIN Yl.MYI oruwee Dear te Tae (LETA) 0306565 Open/close SGFP oil cooler on (mand for IIX.056A Y
MM N. Stat S
3 / 3 14 4
76 50%
U2FSD 2LO N
N Approved at the 8/6t03 ORC inspection and cleaning during non-oulge P-28A SGFP Ol x.6696 power IlX-56A MM meeting.
period.
See texL Refl Cooler RevO-2 C~AP029395/CA026376.____
0306566 Openlclose SGFP U1 cooler on demnd for HX-056B Y
MM N. Stuart 8
3 /3 14 4
76 50%
U2FSD 2LO N
N Approved at ft U/6t03 ORC Inspeedon and cleaning during w-Otage P-28B SGFP Oi Cooler x -6696 power IHX-561 MM meeting.
periob.
See test. Ref:
Re0-2 CAP029395tCA026376.
0310342 Mimor eat leakage at hxtecto line. Suggest P-028B Y
MM N. Stuart 4
1614
.24 5
71 50%
2CS P-28B N
N Apoved at tbe 12t403 ORC Forced ottage item.
Steam Generator Feed x - 6696 power OPS RevO-1; meeting.
PnP I_
MM Rev0-OUTA GE ITEMS REQUIRINGAPPROVAL Pmqs2 Page 2
am~~SCpnlli F dbOoafOa.2i*
Point Beach Nuclear Plant Unit 2 Forced Outare Lis Test Requniee A. Of WWW 1Efw~mv%(ID T6eu4 T
Ster.U d
WONbFrbemDeratpdn EquIlspmueeNmex Approved Re'p Owner Dur Rdaero 1W" La RN"W ARqu If YIN Grs A PMT Dur staftur Condle, Ttolv Y
4 ~
or cf II
~~d (rA)
On Pow Rm~gg NhDO WN P0WER TO MODE I BELOWPL10ORMODE2 ABOVE~
P-6I on PwrRneNsICP 2.7 Y
.Helbing 0
2 1
MODElo nodrnefd N/A N/A N/A lftiotperfmlewithinlast92days Demand x -6414 2'
1Wrmi ncnotfrgetrta on Intermediata Rings Nis ICP 2.9
-Y I1C J. Hlelbbi 2
0 2
MODE I nordereqd NWA NIA N/A If not perfoermed withiinlast 92 days Demmnd J
z.6414 2
arid___ in in cndition forgreater than I__
_4 hours O
oreaeisDOWNPOWER TO MD2BLW-6 OR3 S~
4. OR S W7THRTBMs CL OSED on Sn= ang Ni IC2.1 Y
C J Hehin 2
2 MOE 2 no r rqd A
M MA If not perfoaned within last 92 drfs Desmwid x - 6414 3.4.or and remain in condition eo gater thur with RTh.'I 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Demmnd x.6414 3,4. or 5 andreman in condition for getter than with RTWM 8 hown
________________REACTOR START___
UIREMEN_
On rbne Auto Stop Oil and StpVlve TADOT ICP 13.15 Y
IC J. Helbing I
0 I
I Turbii no dr rud N/A N/A M/A Priort acggthee-9 interiock Dema-16414 Unlatched/
whenever fie unit has been in MODE I 1
~
Lstdied ifniot perfiormed within Iast 31 days on Inturmediata Range NI, ICP 2.9 Y
IC J. ilelbing I
0 1
1 113 no dr reqld N/A NIA M/A IfNot Done Within The Last 92 Days.
Demand 644__
On Source Range NIs ICP2.10 Y
IC J. Helbing 2
0 2
T HSD no drreqd NIA N/A IVA lfNot Done Within me Lad 92 Dayr.
Demand
_x
- 6414 on Power RgNis ICP 2.14 Y
IC J.I eobhsg 2
0 2
I IISD nocdrrerd M/
NA N/A.
If Low Power Trips Not Tested in Demeid x.6414 PrevIous 92 Drys.
On ReacorProwetion Logic ICP 2.17-2 Y
IC J. Heflbing 2
0 2
1 H-SO nodcr rold IV
/A NA IfNot DoneWithinThe Lad 31 Dayr.
Demand
_x
- 6414
___COLD SHUTDOWNREOUREMENTS Osnaton oMiibgatlion IC.6 Y
I I. Ifelbing 2
0 2
ANY nodrretd NIAINA I
IA jMustBeDnen.PyiorToPItaangLTOP 1eadx-64 14 In Snericeand Eveqy31 Dars TURB17VE STARTUPREQJJREMENTS On Remnove Vibration Channe Fault Alrms CCII Y
IC J. Hfelbing I
0 I
I ANY nodrreq'd N/A N/A
?VA RemoveAlarms Prior To Rollup Cea Demand
-6414 ComnmontAiam Rester, After Turbine is on Line..
On Rod posiiondicationadjustment atpowe ICP 10.21 Y
IC J. Ifelbing 2
0 2
1 MODE I no rred N/A N/A M/A Rod posioninceinadjustment Dead________x
-6414 requi_______
. 1.red during p-we aseno on Perform 21CP 13. 15 purirto exceeding 50% power ICP 13.015 Y
IC I. Ile1bing I
0 1
I ANY no drted N/A M/A IVA Purtir prior to turbine rogupbnsnder Demand whenever Mode 3 is entered Kfnot perfonned irk the x1.6414 porto 50% power.
Prnvious 31 days.
Page 3 Pag.3 Scop.VeWnU~otWO42O0492rtoxs
Af Sd YV Point Beach Nuclear Plant Unit 2 Forced Outage List Test Requirements Pop4 Sm*paRtO 5O42 OO4v2MS
Electrical Loss Allocation Table (all values MWe)
Data from time of last near full power Calorimetrics, 3/16/04 for Unit 1, 4/27/04 for Unit 2. l I
I Unit 1 Unit 2 l
l l
Gross Electrical Output 534.0 543.7 Watt4-our Meter I
I Circ Water (Lake) Temperature Losses 4.5 0.8 Expected losses at Circ Temperature and # of Circ Pumps running at time of Calorimetric Radwaste Steam Use 2.0 1.5 Steam for Blowdown Evaporator and Gas Strippers' use House Heating Steam Use 0.0 0.7 Steam for in-house heating and misc. use Condenser Fouling Losses 1.0 0.1 I.
I Identified Cycle Isolation Losses 0.0 0.0 I
IA Capacity Losses 0.2 0.3 Operating at less than 1540 MWth (licensed power) at time of Calorimetric data Unidentified Losses 1.3
-1.6 Difference between Best Achievable and sum of all the above values_
Best Achievable (@140 MWth) 543.0 545.5 From performance data after LP Turbine rotor replacement in late 90's and
_I__III adjusted for new LEFM flow meter and recent 1.4% uprate_
Additional Notes:
- 1) Unidentified losses can vary as much as 1 MWe from week to week.
I I
I I
I l
- 2) A negative value for Unidentified Losses indicates that the current output after adjustments appears to be higher than the "Best Achievable".
l
- 3) Both units' unidentified losses changed about 2 - 3 MW to a negative value (see Note 2) when the main generator watt-hour meters were calibrated the week of 7/21. This is based on a comparison to the PPCS indication of electrical output and a transducer output reading at We l
Energies Power Systems in Pewaukee. These indications come from different instruments. CAP034651 was submitted. Recently, the Unit 1 unidentified losses has been near zero or positive compared to more negative values after the watt-hour meter calibration. This is believed to be l
due to a drift in the watt-hour meter because the watt-hour meter is now reading more In line with the other indications.
I I
Unit 2's output has been higher since its last refueling outage due to Improvements made in the turbine gland steam system during the outage.
I_
_The 2nd Circ Pump was started on Unit 2 at the end of March, decreasing condenser pressure and decreasing losses due to circ temperature l
and condenser fouling.
I I
I I
A I
I I
I I
All Excellence Plan Commitment Action Steps Due Within 30 Days tTrack Aisiesm nt
^
Steo Owner I
.I Start Date Due Date OP--O411 OP-1O0-11.3.D OP-1-o011.4.C OP-10-0 1 1.5.F Improve Effectiveness of Self Assessments Perform an effectiveness review of site leadership observation programs.
CA028467 Perform benchmarking effectiveness review. CA028465 Purcell, J.
211512004 511512004 Commitment Purcell, J.
4/15J2003 511512004 Commitment Purcell. J.
1/12/2004 511512004 Commitment Develop a process for site leadership review of completed self-assessments.
CA030635 Total N of iems for Assessment Bu1iness Procedures
- 3 OR- 01004 OR-01-004. 19 Individual Behavioral Excellence Begin review of department indicators at CA054880 Management Review Meetings.
Breene, T.
4/13/2004 51712004 Commitment Total #of items for Business Procedures Emergency Planning
- 1 OP.09-004 OP-09-04.8 OP-09-004 9 OP.09-005 OP-09-005 4 Upgrade Emergency Action Levels (EALs)
PORC approval of EAL upgrade changes.
CA052689 Submit site approved EAL upgrade changes CA052690 to state and counties for approval.
Control I Maintenance of EP Required Equipment Document the licensing basis of required CA052409 EP equipment contained in the matrix.
Schwartz, P.
4115/2004 512112004 Schwartz, P.
5R2112004 512812004 Schwartz, P.
2/20/2004 6/112004 Commitment Commitment Commitment Total N of iems for Emergency Planning EngineiorlIng DesIgn
- 3 OP-14-001 OP-14-001.11 OP-14-001. 12 Improve the Configuration Management Program Implement fleet standards for modification CA030747 closeout (Objective 2).
Marean, J.
5/2012004 Commitment Interim Effectiveness Review (EFR).
EFR030748 Holt, K.
5/2012004 Commitment Total N of Items for Engineering Design Englrieorlng Design Civl/Structural - PB
- 2 EQ.15 012 EQ-15-012.8 Manhole and Cable Vault Flooding Complete installation of modification to dewater Manholes I and 2.
CA031053 Corbin, T.
3129/2004 512812004 Commitment Total # of Items for Engineering Design CvillStructuraf - PB
- 1 Engineering Design Configuration Management (and Q-List Items)
OP-14-007 Updated Vendor Technical Information Program (VTIP)
Printed:
513/2004 1:08:21 PM Page 1 of 2 20
All Excellence Plan Commitment Action Steps Due Within 30 Days OP-14-007.8 tTrack Review end address Issues identified in the CA055685 VTIP self-assessment and In CA000248, CA001634, andrCA002968.
Steo Owner Start Date Due Date Holt, K.
4/15/2004 512012004 Total # of Items for Engineering Design Configuration Management (and Q-Ust Items)
Engineering Processes Commitment
Corrective Actions Develop an effectiveness review plan and CA055859 schedule.
Peterson, L.
4/15/2004 511112004 Total N of hms for Engineering Processes
- 1 Performance Assessment.
OR-01-004 OR-01-004.26 Individual Behavioral Excellence Revise CAP Trend reports to bin vs.
bamters, results and attributes.
CA054894 Hettick, D.
3/112004 5128/2004 Commitment OR-01-004.34 Revise Human Performance trend reports to CA055029 bin vs. barriers, results, and attributes.
Hennessy, F.
3/1/2004 512812004 Commitment Total # of Items for Performance Assessment Site Projects
- 2 EQ-I 5-001 EQ-15-001.13 AFW Appendix R Firewall Project Modification Closeout CA030842 Morse, M.
1211912003 5/3012004 Commitment Total # of Itms for Site Projects
- 1 Printed:
51312004 1:08:21 PM Page 2 of 2 21
Point Beach CAP Activities Delay of Game Clock Tuesday, 05/04/2004 5 Days since (Last Reset: PME PI last fumbled item lant Electrical Maintenance) o Days since last Unassigned (Last reset: 5/4/04 S-Site VP) item U
a
'4 zj
.t-q
=4 t:N 22
N Plan of the Day Meeting 8:15 - 8:45 am Front Office Conference Room "Do the job ri'Igt the first time."
Excellence Plan of the Day Meeting Action Register Short Term Actions (<7 days)
Responsible Department Manager will provide weekly updates at POD Meeting on Monday, Wednesday, and Friday.
Entry Date Action Description Due Date Owner NONE I
I I.
.I
- I.I Long Term Actions (>7 days) ent Manager will provide weekly updates at POD Meeting or Responsible Departm Friday.
Entry Date Action Description Due Date I
Owner E
D c i D
D a
_w n e I,,
23