N!L) Point Beach Nuclear Plant 10 Safety + Innovation + Teamwork l
I
~I I
I I
E!1
-4 O
N iwq;1R I
=1WI E
31RU EP Team On Call:
Plan-of-the-Day Meeting U1R28: Day 12 EPTeam: On15Call:Days to U2R27: 352 Team:
0815-0845 Front Office Conference Room Days to U1R29: 527 Days Since Last HP Work Week: B04B2 Safety Event:
Clock Reset:
Date: Thursday, April 15, 2004 1',_
Planmof the.Day Agenda
Purpose:
Understand unit status + Ensure ownership and support + Recognize performance
+ Improve communications and teamwork Daily:
Plant Status - Units I and 2:
[Ops] - Plant Conditions (Units 1&2)
[Ops] - Immediate attention (Pri 2)
[Ops] - Equipment in reduced status
[Ops] - Operations' Dept concerns, activities, and priorities
[Ops] - Status control events (last event)
[Ops] - Regulatory notification / near misses
[Ops] - TSACs (active & potential)
[Pit Mgr] - Communications
[Ops] - Nuisance alarms
[Ops] - Operations' Housekeeping Report
[Ops] - Operating Experience Surveillance Schedule Review:
A.
[PPG Mgr] week rolling schedule B.
[PPG Mgr] - Equipment / system outages Chemistry I RADCON Review. Units 1 and 2:
Integrated Schedule I System Outages:
A.
[Ops] - Operations' work week issues Unit Outaae (if aiplicable):
- Monday:
A. [EP] - Event Response duty list B. [Ops/Eng] - Fire Protection summary C. [Safety] - Industrial safety action item list & safety performance D. [Site Engineering] - Maintenance Rule 'Al' system review E. [Project Mgmt] - Major project status F.
[Business Mgr] - Budget overview G. Excellence Plan review
- Tuesday:
A. [RP] - Annual dose summary B. [Security] - Security system status & compensatory measures C. [PPG] - Forced outage schedule D. [Site Eng] - Thermal cycle efficiency E. [VP/Director] - INPO follow up & readiness F. [EP] - EP issues G. Human Performance H. Excellence Plan review
- Wednesday:
A. [Training] - Training B. [WCG] - Management Risk Observations C. [Ops] - Operator Workarounds D. [Ops] - Leakage list; oil & water E. [EP] - EP Drill Schedule F. [WCG] - Section Xl equipment in double frequency G. [Maint] - Housekeeping issues H. Excellence Plan review
- Thursday:
A. [EP] - EP Pager Test Results (when applicable)
B. [Engr] - Temporary Modifications C. [Ops] - Control Room Panel Deficiency Analysis D. [Ops] - Disabled alarms (Units 1 &2)
E. [Ops] - Instruments Out-of-Service (Units 1 &2)
F. [PA] - CAP backlogs G. [Ops] - Out-of-Spec routine readings H. Excellence Plan review
- Friday:
A. [Reg Affairs] - Upcoming Licensing/QA Reviews B. [NOS] - Nuclear Oversight update C. [Maint] - WR Backlog D. Weekend coverage list (Units 1&2)
E. [EP] - Event Response "draft' for next week F. [Engr] - Predictive Monitoring G. [PPG Mgr] - Next week's work week summary and highlights H. [Reg Affairs] - NRC/INPO Perf Indicators I. Excellence Plan review Administrative:
A. [PPG Mgr] - Plant impact issues Round Table:
Pagers:
AOM.................................................
Chemistry Shift Supervisor...............
Industrial Safety...............................
Maintenance.....................................
Outage Manager..............................
Radiation Protection.........................
Shift Manager...................................
System Engineering.........................
Work Week Manager...................
i 2
Point Beach Nuclear Plant Outage 1R28 DAY Supporting Operational Excellence 10 Path N
A Picture Meets Outage Radiation Performance Doesn't Meet Exceeds
=
This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
23.37 Rem Day 10U - April 13 Actual = 0.424 Cumulative = 23.370 Cumulative Forecast = 35.463 Meets: <= 18 Exceeds: <= 12 Actual PCE's:
5 zic-Ole I mzz*ge
".M Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure a
C ia tI z
20 18 16 14 12 10 8
6 4
2 0
Actual
- Forecast
~
Goal E
U) a:
0 0
0 80l I
60 40 0
2 8
1 1
1 I
12 0
2 2
2 0
2 4
6 8
10 12 14 18 18 20 22 24 28 4
Actual Goal 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34
NUCLEAR POWER BUSINESS UNIT PBNP DAILY CHEMISTRY STATUS REPORT Date: 04/16104 Time: 5:00 PARAMETER UNIT 1 UNIT 2 ACTION LEVEL(S)
REACTOR COOLANT Boron, ppm 7
2887 1289 N/A Lithium, ppm 7
<0.05 2.40 out of range Chloride, ppb
<5
<5
> 50 Fluoride, ppb
<5
<5
> 50 Sulfate, ppb
<5
<5
> 50 Silica, ppb 248 410
> 1000 at power Dissolved H2, cc/kg N/A 34.8
< 25, > 50 Specific Activity, uCicc N/A 1.38E+0
>100 / E-Bar 100/E-Bar, uCVcc N/A 164.4 1-131 DE, uCi/cc N/A 2.14E-4
> 0.8 RWST Boron, ppm 3004 3070 SiO2,ppb 4170 5417 BDEB (last done dates) 4/14/04 6:00 4/11/04 2:17
% Solids 1.13 2.39
% Boric Acid 4.4 2.8 BAST A
% Acid - Date & Time 3.71 4/13/04 10:49 B
% Acid -Date & Time 3.73 4/13/04 13:15 C
% Acid - Date & Time 3.73 4113104 9:14 STEAM GENERATORS A T B1A1l 11 Action Level INPO CPI Chemistry Performance Index NA 1.00
> 1.1 above 30% power (2)
P/S Leak Rate, gpd N/A 0.0
>30 or> 60 gpd I hr Cation Cond(1), uS/cm N/A N/A 0.0576 0.0575
> 0.8 Sodium, ppb N/A l
N/A 0.2 0.2
> 5
> 0.8 Chloride, ppb N/A T
N/A 0.3 0.2
>10
> 1.6 Sulfate, ppb N/A N/A 0.4 j
0.5
> 10
> 1.7 pH N/A N/A 9.83 1
9.79
< 8.5 l
FEEDWATER UNIT I UNIT 2 Action Level INPO CPI Iron, ppb N/A 2.405
> 3
> 5 Copper, ppb N/A 0.014
> 0.1
> 0.2 Dissolved 02. ppb N/A
< 5
> 5 pH N/A 9.65 CONDENSATE Action Level Dissolved 02, ppb N/A 3.4
N/A 3.6 NOTE: Bolded Items require action by Chemistry (2) Best allowable CPI is 1.0 EMERGENT PROBLEMS I SIGNIFICANT ACTIVITIES I OTHER INFORMATION Prioritv Chemistry equiDment currently OOS 4
Committed to Nuclear EIcellenc P
Plant Status Report Plant: Point Beach Nuclear Plant Date: Thursday, April 15, 2004 Operations Report (Summary of Last 24 Hours Of Operations):
Unit I is at refueling shutdown (Mode 6). Reactor coolant system is at 70%. Unit 2 is at 100% power.
Days Without LTA: 572 Homeland Security Condition: Yellow
-- IUn;. -
-it I!-:
PNVR PWR MWE MWE PWR PWR MWE MIWE Mode Level (Gross)
(Net)
Mode Level (Gross)
(Net) 6 0%
0 0
1 100%
544.6 522.5 Days On Line: 0 Days Since Last Reactor Trip: 273 Days On Line: 147 Days Since Last Reactor Trip: 279 t
>~*;-
-Technical Specification Action Conditions -- '
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days)
Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2
Out of 11/9/03 0749 31 Days 3.6.3.A 4/26/04 1900 M. Rosseau 8/27/04 U2C RMW service.
Supply.
-: Major Equipment Out of Service Or Degraded Item Unit Condition Date Time Work Order Number Due Date Responsibility NONE I
Operational Problems IConcerns Item Unit Condition Actions Needed Due Date Responsibility W-301, F-23/F-29 0
Motor failed.
Motor on-site for re-installation.
TBD D. Laing PAB Exhaust Filter Fan 2RC-508, U2C 2
Valve comes off shut seat Provide decision tree to Plant 4116/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2
Inadequate excess letdowvn flow.
Open and inspect, 2CV-285.
5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2
Elevated indication, temperature 4 step action plan is developed.
5/14/04 B. Carberry Ejector Gas Monitor related.
Scheduled completion is 5/14104.
4
-. Aggregate Review of Issue Item Unit [
Condition Actions Planned Due Date l Responsblityl NONE I
I I
I R
1
- -: ** Reportable Events NONE Page 1 of 2 5
Committed to Nuclear ExceItenc, is Plant Status Report
-Outstanding Operability Determinations NONE Protected Equipment
2P-29, Aux Feedwater Turbine-Driven Pump / P-38A/B Aux Feedwater Motor-Driven Pumps /
P-32A-F Service Water Pumps I K-2AIB Instrument Air Compressors / K-3AIB Service Air Compressors /
G-01/G-02/G-031G-04 Emergency Diesel Generators / Unit I Nozzle Dam Panels
'Load Changes'(Planned or Unplanned) 7- ' -"I.-
NONE
- '5.
L
`, Reactor Coolant System Leakage
,^ :
j' Ken '
'e Unit 1 Unit 2 Unidentified (gpm) 0 0.05 (No leak rate determined due to draindown)
Identified (gpm) 0 0.03
. -Major Tests and Evolutions Scheduled in Next 24 Hours NONE Page 2 of 2 6
Weekly Core Damage Risk Profile (Safety Monitor)
BD4B21 E-lrevlsed 411112004 I
Unit 2 l
Risk Mgmt Engr.
Tom Staskal (x6259)
Work Week Coord: OCC Projected Risk Level Compared to Average:
70%
Highest Projected Risk Level Actual Risk Level Compared to Average:
0%
Highest Actual Risk Lvel Notes:
Scheduled Activities
AA.
I 4.%
P
~
f,4:;
.,.....r <....
.44.
.~.
.4 :,;
4
- .S¢<>a>
4; -a->*
_.4.....
,-,,r...... VL-.
- y.
~
. T:.r 's
,',...a 20 Risk Profile________
1!
k..~......
ti>...
_}>.*- ~v
____i___'_-_______..........t,.(, I'4 '. j $,t' ',4 na--
- -.C,4'.4' rAA..rs 4,,
r.'!4:4.....-?.r-.+/-.n':,
a'T.'--.,......,.-..s.,.444,,..t
- r.
.rJ
.r.4rj'.
.4.,;
,'p-tl i'ti T
tt.¶'*;.._;-'"t,.....
17 -
186 Projected Risk
-Yellow 15 RED) 14 Average Maintenance 13 Actual Risk 12 D
Liiy C
.0 E
ii in
__I_
I I._
I I._
1_
I __
_I 9
I11 J
Ll I_
I 11u 11111h lift1 ii I
I I It i
I I
Id Id a mm.
la
~o~tz~mmH ea gmImaff~ff~~3if,
V r
6 5
4 3
2 1
0 I
I I
I
-I I
I I
I I
-I I
.. 4...
I ~
_ I II u
C I.....
I.
I I
Sunday 1
Monday 2
4111/2004 4/1212004 Tuesday 411312004 3
Wednesday 4
4/1412004 Thursday 5
Friday 4/1512004 4/16/2004 6
Saturday 7
4/17/2004 7
Printed on 4/1412004
NMCCt
'.Committed to Nuclear Ezcllenc~,P Outage Status Report Plant:
Point Beach Unit I Day:
Thursday Today's Date / Time:
4/15104 /
0600 Outage Duration: Day 12 of 28 afe St Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage 0
Summary:
Radiological Dose outage to date 23.370 Projected to date 35.463 Outage Goal S.75 R Difference
-12.093 Number of PCEs 5
Summary:
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
--
.;, ., "'. :.",
.'. 1
11, -,I_%
';.' -,- "%, : ;.-.I, I-.,
I,
.,.. " _. - , -,. :
,, I ---
.,, - '. I,.
,-, 111, , .,, 1. I ,.... t -,
T,-
f%.,
.:.,
_%-_ t,-:-
. _;.,, - : _2,_ -', -j
...,, % I. : :-,.,.". I 1.. ---:, 1,17-1.
I -
I
. ,
-, ;,. -,
Mode:
Q Hot Standby (Mode 3)
E Hot Shutdown (Mode 4)
D Cold Shutdown (Mvode5)
[D Refueling Shutdown (mode 6)
RCS:
Temperature:
98 Pressure:
Vented to Atmosphere RV Level:
70% as of 0400 Time to Boil:
51 Minutes Reactivity:
Green Core Cooling:
Yellow Power Availability:
Green Containment:
Green Inventory:
Yellow Spent Fuel Pool Cooling:
N/A
' /> ^ -°2.'.."'
A >' ",,et
!'Shutdown Safety Assessment Protected Equipment:-':<:'.s>'a".':'
Unit I A and B SG Nozzle Dam control panels
-. *Maior Activities Completed in Last 24 Hours '.'
- 2.
'Critlcal Path and NeaerCritic'l Path nActivitie (Next 24 How"s)
ORT ISA Fuel Transfer System Checkout Schedule:
Activities Required to Exit Yellow Risk Conditions
- 1) Troubleshoot & Repair Z-13 Polar Crane
- 2)
Reactor Vessel Head Stud Removal
- 3) B RCP Motor Move
- 4)
Install Cavity Seal Ring
- 5) Reactor Vessel Head Lift
.. <......~gn~icatoutstanlding s ues'
-.<:Y q.
Date Issue '
Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4/20/04 Scott Manthei 4/04/04 I P2A Charging Pump Troubleshooting 4/16/04 Clay Hill 4/08/04 Incorporate Lessons Learned from I s Reduced Inventory Orange Path 4/18/04 Dave Dyzak 4/13/04 Z-13 Polar Crane troubleshooting and oil particulate issue 4/15/04 Dave Schroeder
'Scheduled
- ctual Scheduled Actual
'Date Time Date Time --
Date
- Time
' Date! -
Time:.
Cooldown <2000 4/03/04 2100 4/03/04 2230 Heatup >2000 4/25/04 0900 Head Lift 4/09/04 0900 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100 Page I of I 8
Run Date 14APR04 15:56 Work Activity Risk Assignment Sheef I of I U
ACT IWO GRP HPE EQUIPMENT Activity Cal DUR START FINISH APR ID lST RISK Description ID 31 fiL6!
OP1811,8161 0..
8e1610
.8 11 08
.1I 1
EZMRCP-K 76 EM DR-YML-Y P-001B-M P1BMOVEMOTORFROM 6
15APR04 15APR04 REACTOR COOLANT PUMP MOTOR ORT3-NR-H PUMPTO STAND 01:00' 06:59 0215205 - 128EM 1
MM8480D1 76 MM1 DR-N ML-N R-1 MOVE REACTOR VESSEL 1
4 15APR04 16APR04 REACTORVESSELANDASSEMBLY ORT3-Y R-H HEAD TO RHLDA 23:00 02.59 0214134 - 128MM 1
MM-8480E 76 MM1 DR-N ML-N R-1 REMOVE UPPER INTERNALS 1
4 16APR04 16APR04 EREACTOR VESSEL AND ASSEMBLY ORT3-N R-H 14:00 17:59 0214134 - 128MM 1
MM-8485B1 76 MM3 DR-YML-Y P-001B PLACEBACKSEAT 1 l 1 15APR04 15APR04 IREACTORCOOLANTPUMP ORT3-YRM R
COLLECTION SYS IN SERVICE 2200 2259 0214119 - 128MM 1
MM-8485K 76 MM31 DR-N ML-N P-001B P-1B, ALIGN SEAL 1 1 1
16APR04 116APR04 UREACTOR COOLANT PUMP ORT3-N R-M COLLECTION TO CAVITY 05:00 05:59 0214119 - 128MM 2
OP0216031 77 l OP1 DR-N ML-N O-TS-10AB.1 TS-10A, U2C AIR LOCK DOOR 4 l 2 16APR04 16APR04 OU2 CONTAIR LOCK DOOR SEALTEST ORT3-NR-M SEALTEST 00 0159 0216031 - B04B2 I
RPIA0 OPS DR-N ML-N O-RP-1A FILL CAVITY FOR ROD 1
4 16APR04 16APR04 EFILL UPPER CAVITY FOR UNLATCHING RODS (RP.1A)
ORT3-N R-M UNLATCH 01:00 04:59 1280P I
RP4A-020 OPS DR-N MN O-RP-4A UNLATCH CONTROL RODS 4
16APR04 16APR04 EUNLATCH CONTROL RODS (RP-4A)
ORT3-N R-M 08:00 11:59 1280P NMC WE LT-81 HUMAN ERROR RISK BARCHART PBNP U1 Refueling 28 Outage FL81 HUMAN ERROR POTENTIAL O Pulmavera Systems, Inc.II
Open Control Board Deficiencies 4/14/04.
I Page 1 of 1
Closed Control Board Deficiencies 4/14/04, l.
Last 6 Months Page 1 of 1
Open Control Board Stickers 4114104 :
~WO1 'Pfl$ty~ Unit System i.TogLocartoim Cis nlo~~
P
~
Rt iN~1
~
OMOtM
.3OI-.W.Otae.2Fe4 Octe or el~
vtY Xt Uh ym agnEqtdp~m*MID V ;i: D t9 lwA p! fteI
-o~aw xn
.z:
RtB :kg§ GfOF
- 4 WO P2FI tWO Shdwoktki W-W
- Tartt f
0212019 5
0 BS CO1 By BS-OBS-1282A RMW Valve Goes Intermediate WM 21 C10S1 08/1614 C10B1 08t23104 1262 A Switch When P-23A Is Running 0311923 5
0 BS At Valve &
OBS1262B Valve Does Not Fully Open By MM 71 B1Ot1 052404 B1OB1 08101104 Slicker On CS 0406271 6
0 VNPAB IC04R OVNPAB-3266 No Lght Indication On MCB EM 01 FUTUR Not FUTUR Wt not scheduled scheduled yet 03_ _5_ __1_ _
_ __02_A258Iyet 036625 5
1 4.1SKV C02 lAi2-58 tA-O5 To IX-13 Breaker FIN 75 FUTUR 05/02105 FUTUR 051091)5 Indkaor Ught Bulb Broken In Socket 0306297 6
1 4.1 8KV C02 1A52-88 ANt Power To IA-06 Fror G-04.
EM 1O COSAI 07112104 COSAI 07/19104 CS Slicks 0307T34 5
1 PPCS IC20PPCS I C-20 PPCS Monitor Does Not Worlr IC 71 C06BI 07119104 C06BI 0726104 Monitor Monitor 0305523 3
1 CV t C04 I Bench tCV-11tC VCT BA Inlet Leakng By MMV 78 UtR28 UtR28 04/1t104 UIR28 0511/004 Section 0406145 5
1 CV 1C04 t1CV.135 Letdown Pressure Con"ot MMV 10 UtR29 UtR29 1 018105 UtR29 1110W05 0405___
Valve Sdicking 0405617 5
1 CV CR 1C04 -1CV-1CV.145 Letdown Divert Temperature EM 10 CO9A1 08109104 C09A1 0W8184 145 Red Ught Controller tight Socket Broken 0305574 5
I CV IC04 IC-2-8 IFIC-110 Bork Acd Flow Controlter-IC T0 C09A1 08109104 C09AI 08/18104 Alarm Deviation Alarm Comes In 04000M0 5
1 FM IC-124 IFM-Ch B Flux Map DetectorB Pen Does FIN 71 FUTUR 05102105 FUTUR 05109105 Not Move 0406135 5
1 VNCC CR CO.
tW-IFS-3225 W-tAt Lo Flow Alarm Came In EM 10 DOWAt 09/07104 DOAt 09/t14M 1Al Contro With CS In Stant Switch 0303728 5
1 VNCC CO0 1FS-3229 tW-ICI Cont Accident Fan EM 10 D01A1 0917104 OtA1 09/14104 Low Flow Alarm Intermittent 0406136 5
1 VNCC CR. CI 1W-I FS-3240 W-t B t Lo Flow Alarm Cane In EM 10 DOtWA 097104 DOWA1 09114104 tB11 Control Nth CS In Start Switch 0308605 5
1 MS 1C03 lMS-2300 SB FW Heater BTV Position FIN 03 FUTUR Not FUTUR WVO not Indlcaton On 1 C-03 scheduled scheduled yet yet 0400145 5
1 CV I C04 I P2A I P-2A Charging Pump Speed MM 1t0 C09At 00914 C09A1 08804 Combrolter Responds Very Slowly m__9A____CA_8__
0405733 5
1 MRR 1CO03 I P-30A CW Pump Amneter Sticks On EM 10 ED6B1 01103105 E06B1 01/10105 Pump Start 0406143 5
1 CS PPCS.101t 1PT-2115 Condenser Pressure IC 71 C1OB1 08/18104 CIOBI 08Q23104 Monitor Transmitter PPCS Indication Drilling 0405755 5
1 RPI tC04 1RPI-K5 RPI Erratic Durng TS-5 IC 10 FUTUR 05102105 FUTUR 05115 0215023 5
1 VNCC 44 ICR/PPCS.
IT-3284 51 Cont Temperature IC 78 C~tA1 08/10424 COtAt 06214 1
07A Indication Erratic On PPCS IC7_C_____14_4 C__0_1_
04004S1 5
1 TU ITR-6019 On ITR-6019 Turo. Supervisory Panel IC 10 U1R29 UIR29 05102105 U1R29 0519105 I C03 In Control Bearing 18 Spikes Room 030411 5
2 E
2C032G 2EHVPL VPL Comes On Early When IC 10 FUTUR 05102105 FUTUR 0510915 I Not On Limiter Page 1 of 3
Open Control Board Stickers 4114/04 O
lProfty Unit :ystem Jag Location, EquipmtD en-t 1 Decrtpdon,,
i RE s '
Nam
't CD Nta-V GROUP azO Outag P2 Field WO Schh Wovt ek ;T t
0310511t 5
2 MMS 2Tr.AODCLtqttt Crossover Sleamrn ump EM 10 81 2B2 06/1 t04 81 282 0W17}04
~Conrtbol Power Indicating9 Ught 030968t8 5
2 PPCS 2C20 2C-20 PPCS Drop 4 Not Working IC 10 C06t8t 07119d94 Ct0ft1 0712i04 Monitor 0310031 5
2 CS 2CS-475 28 SG MFRV Leaks By MMV 10 U2R27
- U2R27, Not U2R27 WO not scheduled scheduled yet yet 0302685 5
2 CV 2C04 2CV Bad Relays In Make-Up Conbtol IC 76 C0882 08/02V04 C0882 08A09104 System 0310325 5
2 FM 2FM DispIay Dsplay E-10 Sick IC 75 B11AZ 06103104 B11A2 06/10104 0400545 5
2 FM 2C-122 2FM-Ch D Incore Detector Cal IC 01 FUTUR Not FUTUR WO not Thumbwheed NotWorking scheduled sdceduled yet yet 0405764 3
2 CV On 2C04 § 2F1 2FT-134 Letdown Flow Has Dritled FIN 75 FUTUR 05102105 FUTUR 05905 134 Down VWth Charging Flow Stable 309435 5
2 SI 2FF-924 On C01 2FT-924 2P-15B SI Pump discharge IC 71 C04B2 076104 C04B2 07113)04 Flow Indication Shows Flow When Running 2P.15A On High Flow Redrc 0405734 5
2 Ni 2NR-4 NI Overpower Recorder Chart IC 01 FUTUR Not FUTUR WO not Drive Erratic scheduled scheduled yet yet 0303693 5
2 CV 2C04 2P-2C 2P-2C Charging Pump Speed Control EM 20 E12B2 02)14105 E1282 02/21105 Controller HIgh/Low Limit Comes In Early 0400626 5
2 TU 2POR-6117 TG Speed/Vave And Rotor FIN 20 FUTUR 0502105 FUTUR 05109105 PosItion Purple Pen Not Working 031191 5
2 RC 2CU04 2RC-435 Pressurizer Satety Leaks By MM 10 U2R27 U2R27 Not U2R27 WO not scheduled scheduled yet I_
_yet 0311797 5
2 DMIMS 2VBA.768 HX-1A DMIMS Spurious Alanrs IC 10 C04B2 07/06/04 C04B2 071 3/04 MOO 00-2W-1A2. 1 B2.
Sliders Open To Disable No WOs have been 10 1C2. 1D2 Broken Low FlowAlarm assigned to TOis llemryet Switches 0310306 5
0 MMS Co0 Vertical C-1 tight 2WL-1723/2SC-951 Plastic FIN 71 NO-PX 04/12/04 NO-PX 04119104 Bulb Canler Broken 0212042 5
0 SA C01 DZ-1 C-01-D Servlce Air Comp. Trip Alarm IC 21 NO-PX 04/12/04 NO-PX 04/19104 Received When ShIng From K-39 to K-3A 0305454 5
0 ANN On 0/C01D C-41-D Running IA Comp TripAlarm EM 10 C11A2 0823104 C11A2 08)304 Comes In VWAn ShiftIng IA 992_______
Compressors 9926054 6
0 MMS C-02 Vertical At C-02 Fill Scrw Heads And Seams IC 76 C03A2 06/29104 C03A2 0710604 G-01 Panel ForTheDGPanehs 0307396 3
0 125V 2C-20B 1-9 D-08 Flasher Reset On 2C03 M
73 C07A1 07/2804 C07AI 08105104 Alarm Window Causes Hard Ground On D-08 In Control Page 2 of 3
Open Control Board Stickers 4/14104
,,' WO U
Systom Jag Loctlon' E.qulpontiD 10 Dneription RE.- !44 a
Pm.
f.,IOGROUP Outae P2 FWO
%VV sch.d Worki W k ?.. Tare 8 0302194 5
0 FP D0400 D-400 Aarm Silenced Ught Flashing EM 71 C05A1 07I12104 CO5AI 07Il9V4 0301821 6
0 MRR C02 On G01 G-01 Ainmeter Mark Max Current At450A APM 7T C01A1 06I14/04 C01A1 062t1104 Amneter 0301822 0
MRR C02 On G02 G-02 Ammeter Mark Max Cufrent Al 450A APM 71 C03A2 0628104 C03A2 07IM504 Ammneter 030at23 6
0 MRR C02 On G03 G-03 Annmeter Mark Max Current Al 450A APM 71 E02B1 12/06104 E02B1 12113104 Ammeter 0216652 4
0 DG C02 G-04 G-04 Unloaded Voltage EM 10 COSA1 07112/04 COSAI 07119/04 FResponse Is Slow_
0301624 6
2 CW G-04 Amimeter Mark Max Current Al 450A MM 71 C05A1 07/112/4 COSAI 07/19/04 0307305 5
0 GT C01 R By G-05 Volt Reg. Voltage Regulator Not Working EM 20 B09A1 05117/04 809A1 05(24104 Voltage Reg PMope"t?
~~Swltd 0407318 5
0 FO C01IC3-10 OLS-3934 C-02 EDG DayTank Level IC 01 FUTUR Not FUTUR WO no Window Switchv Abmed. Nom Level scheduled scheduled yet yet 0406914 5
1 FW 1 LR-460 A SIG WIde Range Level-Pens FIN 71 FUTUR 05/02/05 FUTUR 0509/5 Stuck During ICP 13.4-2 Page 3 of 3
Closed Control Board Stickers 414104 Last 6 Months Page 1 of 1
Open LIT Annunciators 4114/04.
Page 1 of I
Closed LIT Annunciators Last 6 Months 4/14/04 ^*
I Page 1 of I
PBNP Site Engineering OPEN INSTALLED TEMPORARY MODIFICATIONS 4114104 TMotea ~,1UTMP.,%
- aa Unt -Fytm~~P41t
.c~~n~
t'E~ t;~Nan,
-'t-:TI~o yp q W
GROUP [~
Outage0 WO Sched WoAkw.~-rt~~!Protk V..
014014 04/29101 1
TU TG-01 3 RD HARMONIC VOLT ATH HARPER TM INSTAtlED 0306103 EM 76 U1R28 Work in U1R28 05/31/04 3
METER I.
pes 024037 11/28102 C
WT T-119A TEMPORARY PRE-JJN NOVAK TM INSTALLED 0212184 CE 71 05/24104 B10B1 06/30/04 3
TREATMENT TRAILER NEAR NS8 02.044 01116102 1
St S-08308 INSTALL TEMPORARY SB BACH TM INSTALLED. REMAIN IN 0213009 MM 76 U11R28 Work hi U1R28 05131/04 3
RELIEF VALVE ON T-03B SS FOR CYCLE progress 02450 11/27102 1
FD FD-00145 1FD-00145FURMANITE MRR RALPH U1R28 REMOVAL 0213779 MM 78 U11R28 Worc hI U1R28 05/31104 3
REPAIR progress 02451 121012 C
Z Z-015 DISCONNECT OF PAB HJS SOULIA TM WONNT BE REMOVED 0216361 EM 71 08109/04 C09A1 08/16/04 3
BRIDGE CRANE PENDANT UNTIL PAB CRANE CONTROL MODERNICATION MOD IS COMPLETE 02452 03/25/03 1
MRR 1-TG-01-VARM TEMPORARY ITG4-1 DEL LARSON TM INSTALLED 0216539 EM 76 U1R28 Work In UlR28 05/31/04 3
VARIMETER progress 03436 11109103 2
VNPSE VNPSE-INSTALL BLANK FLANGE AT JNN NOVAK TM INSTALLED 0310052 MM 21 U2R27 0902105 U2R27 05/31/05 3
321213244 CV-3212 AND 3244 03438 04/06/04 1
480V REACTOR TEMPORARY POWER FOR ATH HARPER TM INSTALLED 0213480 EM 76 U1R28 04/20/04 UtR28 05/31/04 6
REACTOR HEAD INSPECTION 04002 04102104 1
480V 1B-42 U1R28 -REFEEDXL-10 MLM MILLER TM INSTALLED 0400583 EM 71 U1R28 04128/04 UIR28 09/03/04 5
DURING 1IB42 DOWN POWER 04405 03/26/04 C
MET SEI-06213 AUXILLIARY FEED TUNNEL MPP PEDERSEN TM INSTALLED 0406247 CE 10 Nolundrig FUTUR Not 4
SEISMIC EVENT In 2004 scheduled yet ANNUNCIATION Page 1 of I
PBNP Site Engineering CLOSED INSTALLED TEMPORARY MODIFICATIONS LAST 6 MONTHS 4/14104 Page 1 of 1
All Excellence Plan Commitment Action Steps Due Within 14 Days tTrack Step Owner Start Date Due Date
!Esess ne t
ls ij
~~.--
- z-4,;
- ,^,* '-$ "j'; i-1,
OP-110.011 OP-1"11.5.D Improve Effectiveness of Self Assessments Procedurefize PB Quarterly Effectiveness CA030626 Review guideline.
Purcell, J.
12115/2003 411512004 Commitment Total # of Items for Assessment Emergency Planning.
- 1/2'.
'U--
- 1
~~~.
...,5r6X;^7_e..,s,_.z,
.s.
OP-09-004 OP-09-004. 7 Upgrade Emergency Action Levels (EALs)
Draft EAL upgrade to NEI 99-01 scheme.
CA052688 Schwartz, P.
9/10/2003 4/1512004 Commitment Total # of Items for Emergency Planning Maintenance Constrictlon.General Supervisor Installatlon Services)
- I EQ-15-0ll EQ-15-00 1.9 AFW Appendix R Firewall Project Complete Mod Implementation MR99-034C (Relocate Pipingirubing & Install Fire DamperJ CA030838 Cruise, B.
12/1/2002 4115/2004 Commitment EQ-15-001.10 Complete Mod Implementation MR99-034D CA030839 (Relocate Conduit and Pipe Supports)
EQ-15-001. 11 Complete Mod Implementation MR99-034A CA030840 (Modify Halon Detection and Annunciation System)
EQ-15-001.12 Complete Mod Implementation MR99-033 CA030841 (Install fire wrap). Some Field Engineering will be required.
EQ-15-001.14 Complete Mod Implementation MR99-034 CA031651 (Install 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> firewall).
Total # of Items for Maintenance Construction (General Supervisor Installation Services)
Cruise, B.
12/1/2002 4115/2004 Commitment Cruise, 8.
7/712003 4/115/2004 Commitment Cruise, B.
5/2/2003 4115/2004 Commitment Cruise, 8.
5/2/2003 4115/2004 Commitment
- 6 Printed:
4/1412004 9:0:44 AM Page 1 of 1 20
Point Beach CAP Activities Delay of Game Clock Thursday, 04/ 15/2004 13 Days since last fumbled item 20 Days since last Unassigned item b'
- ~t Xs0
.~~~~~
4niv-a D,.
- S Es^
5
<tMIM
~
21
I N
Comtnitted to Nuclear Excellence
.Li' Plan of the Day Meeting 8:15 - 8:45 am Front Office Conference Room "Do the /oh right the first time. "
Plan of the Day Meeting Action Register Short Term Actions (<7 days)
Responsible Department Manager will provide weekly updates at POD Meeting on Monday, Wednesday, and Friday.
Entry Date Action Description Due Date Owner 4/14/04 Resolve station standards and expectations issue with 4/16/04 Pat Russell bucket hanging on l-HG-23 valve (TG liquid detector drain), near 26' elev front office entrance to turbine hall.
4/14/04 Contact PPG to have POD report of core damage risk 4/15/04 Clay Hill profile updated to reflect currently scheduled work activities.
Long Term Actions (>7 days)
Responsible Department Manager will provide weekly updates at POD Meeting on Friday.
Entry Date Action Description Due Date Owner -
3/18/04 Brief POD on efforts to recover dose back to forecasted Weekly -
Stu Thomas value Fridays