ML20245G610
ML20245G610 | |
Person / Time | |
---|---|
Site: | Trojan File:Portland General Electric icon.png |
Issue date: | 06/16/1989 |
From: | Schaefer D, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
To: | |
References | |
PNS-V-89-005, PNS-V-89-5, NUDOCS 8906290194 | |
Download: ML20245G610 (2) | |
Similar Documents at Trojan | |
---|---|
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993
[Table view]PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference PNO-V-90-038, A:on 900927,main Generator Trip Resulted in Unplanned Plant Shutdown.Transient Caused 140 MW Excursion on Grid,Tripped Off Nearby Substation & Shook Turbine Bldg Deck.Ge Contacted for Recommendations1990-09-27027 September 1990 PNO-V-90-038-A:on 900927,main Generator Trip Resulted in Unplanned Plant Shutdown.Transient Caused 140 MW Excursion on Grid,Tripped Off Nearby Substation & Shook Turbine Bldg Deck.Ge Contacted for Recommendations PNO-V-90-032, on 900711,steam Dumps Did Not Automatically Open to Pick Up Load Lost from Turbine During Performance of Turbine Test.Operators Took Manual Control & Stabilized Plant.Plant Shutdown to Investigate Event1990-07-11011 July 1990 PNO-V-90-032:on 900711,steam Dumps Did Not Automatically Open to Pick Up Load Lost from Turbine During Performance of Turbine Test.Operators Took Manual Control & Stabilized Plant.Plant Shutdown to Investigate Event PNO-V-90-010, on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs1990-03-20020 March 1990 PNO-V-90-010:on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs PNO-V-90-011, on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement1990-03-20020 March 1990 PNO-V-90-011:on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement PNO-V-89-048, on 890809,plant Tripped on Overtemp Differential Temp.Caused by Spurious Trip Signal Received from Other Channel.Reactor Shutdown in Mode 3 in Order for Licensee to Attempt to Identify Source & Cause of Signal1989-08-10010 August 1989 PNO-V-89-048:on 890809,plant Tripped on Overtemp Differential Temp.Caused by Spurious Trip Signal Received from Other Channel.Reactor Shutdown in Mode 3 in Order for Licensee to Attempt to Identify Source & Cause of Signal ML20245G6101989-06-16016 June 1989 PNS-V-89-005:on 890615,licensee Informed NRC of Possible Onsite Use & Sale of Marijuana & Cocaine by Five Contract Employees,Employed by Northwest Energy Svcs Co.Employees Interviewed,Searched & Given Urinanalyses on 890616 PNO-V-88-060, on 881113,turbine Trip/Reactor Trip on hi-hi Steam Generator Level Occurred.Caused by Faulty Controller for Feedwater Regulation Valve on Steam Generator B.Licensee Developing Actions to Address Problems1988-11-15015 November 1988 PNO-V-88-060:on 881113,turbine Trip/Reactor Trip on hi-hi Steam Generator Level Occurred.Caused by Faulty Controller for Feedwater Regulation Valve on Steam Generator B.Licensee Developing Actions to Address Problems PNO-V-88-057, on 880916,while Verifying Pressure Transmitter PT-458,bistables Tripped.Caused by Technician Error & Exceeding Shutdown by More than 48 H.Problems Encountered During Reactor Startup Listed1988-09-19019 September 1988 PNO-V-88-057:on 880916,while Verifying Pressure Transmitter PT-458,bistables Tripped.Caused by Technician Error & Exceeding Shutdown by More than 48 H.Problems Encountered During Reactor Startup Listed PNO-V-88-031, on 880512,engineering Walkdowns of Pipe Whip Restraints Identified That Pressurizer Surge Line in Contact W/Upper Shim Pack of Pipe Whip Restraint 1.2.Possibly Caused by Difference Between Pressurizer & Hot Leg1988-05-12012 May 1988 PNO-V-88-031:on 880512,engineering Walkdowns of Pipe Whip Restraints Identified That Pressurizer Surge Line in Contact W/Upper Shim Pack of Pipe Whip Restraint 1.2.Possibly Caused by Difference Between Pressurizer & Hot Leg PNO-V-88-026, on 880418,workers Removed Flange from Pressurizer Relief Tank,Releasing Radioactive Noble Gas. Level of Activity Resulted in Containment Purge Isolation Signal.Release Caused by Inadequate Procedural Control1988-04-19019 April 1988 PNO-V-88-026:on 880418,workers Removed Flange from Pressurizer Relief Tank,Releasing Radioactive Noble Gas. Level of Activity Resulted in Containment Purge Isolation Signal.Release Caused by Inadequate Procedural Control PNO-V-88-001, on 880108,reactor Trip/Turbine Trip Occurred & Plant Shutdown for Greater than 48 H.Caused by Dirty Contact in Cable Connection to pre-amplifier.Containment Leakage Also Discovered.Manway Cover Bolts Torqued1988-01-12012 January 1988 PNO-V-88-001:on 880108,reactor Trip/Turbine Trip Occurred & Plant Shutdown for Greater than 48 H.Caused by Dirty Contact in Cable Connection to pre-amplifier.Containment Leakage Also Discovered.Manway Cover Bolts Torqued PNO-V-87-081, on 871209,indication of Increased Leakage in Containment Identified.Caused by Leakage from Charging Sys Valve & Steam Generator Tubesheet Drain Valve Due to Abnormal Seal Performance.Seals Examined & Valves Repaired1987-12-10010 December 1987 PNO-V-87-081:on 871209,indication of Increased Leakage in Containment Identified.Caused by Leakage from Charging Sys Valve & Steam Generator Tubesheet Drain Valve Due to Abnormal Seal Performance.Seals Examined & Valves Repaired PNO-V-87-062, on 870928,unit Shut Down to Repair Boron Injection Tank Leaking Pressure Relief Valve Psv 8852. Leaking Relief Valve Removed & Blank Flange Put Over Line. Plant Remains in Shutdown Status1987-09-29029 September 1987 PNO-V-87-062:on 870928,unit Shut Down to Repair Boron Injection Tank Leaking Pressure Relief Valve Psv 8852. Leaking Relief Valve Removed & Blank Flange Put Over Line. Plant Remains in Shutdown Status PNO-V-87-057, on 870824,Oregon State Agreement Program Director,R Paris,Informed NRC That State Employee Union Voted to Strike on 870913.If Settlement Not Reached Prior to Walk Out,Managers Will Handle Radioactive Matls Program1987-08-24024 August 1987 PNO-V-87-057:on 870824,Oregon State Agreement Program Director,R Paris,Informed NRC That State Employee Union Voted to Strike on 870913.If Settlement Not Reached Prior to Walk Out,Managers Will Handle Radioactive Matls Program PNO-V-87-048A, on 870702,significant Unexpected Erosion on Straight Sections of safety-related Feed Sys Piping Identified.Licensee Plans to Replace Piping Prior to Restart.Inpo Requested to Distribute Findings Via Network1987-07-0707 July 1987 PNO-V-87-048A:on 870702,significant Unexpected Erosion on Straight Sections of safety-related Feed Sys Piping Identified.Licensee Plans to Replace Piping Prior to Restart.Inpo Requested to Distribute Findings Via Network PNO-V-87-048, during Insp of Main Feedwater Sys in June 1987, Licensee Found Some Indications of Pipe Wall Thinning.Caused by Flow Transition & Turbulence.Licensee Replacing All Piping W/Below Min Wall Thickness Indications1987-06-30030 June 1987 PNO-V-87-048:during Insp of Main Feedwater Sys in June 1987, Licensee Found Some Indications of Pipe Wall Thinning.Caused by Flow Transition & Turbulence.Licensee Replacing All Piping W/Below Min Wall Thickness Indications PNO-V-87-045, licensee Discovered Seperation Between Base Plate Grout & Concrete on Support SS-81 on Main Steam Line B.On 870616,dynamic Analysis Reperformed for Main Steam Supports.Supports Reinstalled W/Proper Design Loads1987-06-16016 June 1987 PNO-V-87-045:licensee Discovered Seperation Between Base Plate Grout & Concrete on Support SS-81 on Main Steam Line B.On 870616,dynamic Analysis Reperformed for Main Steam Supports.Supports Reinstalled W/Proper Design Loads PNO-V-87-040, on 870523,360 Degrees Circumferential Break of SI Accumulator a Fill Line Occurred While Transferring Water from SI Accumulator a to D.Caused by Low Cycle,High Fatigue. Util Conducting Analyses to Determine Force & Fatigue Cycl1987-05-26026 May 1987 PNO-V-87-040:on 870523,360 Degrees Circumferential Break of SI Accumulator a Fill Line Occurred While Transferring Water from SI Accumulator a to D.Caused by Low Cycle,High Fatigue. Util Conducting Analyses to Determine Force & Fatigue Cycl PNO-V-87-037, on 870512,fatigue Fracture Occurred on 1-inch Safety Injection Fill Line on Accumulator Tank a & 2,000 Gallons of 2,000 Ppm Borated Water Drained Onto Containment Floor.By 870514,two Addl Accumulator Tanks Found W/Cracks1987-05-14014 May 1987 PNO-V-87-037:on 870512,fatigue Fracture Occurred on 1-inch Safety Injection Fill Line on Accumulator Tank a & 2,000 Gallons of 2,000 Ppm Borated Water Drained Onto Containment Floor.By 870514,two Addl Accumulator Tanks Found W/Cracks PNO-V-87-038, on 870513,female Air Lock Operator Received Injury to Neck While Opening Air Lock Door to Transfer Matl from Containment.Operator Transported Offsite for Medical Attention.No Serious Injuries or Contamination Found1987-05-14014 May 1987 PNO-V-87-038:on 870513,female Air Lock Operator Received Injury to Neck While Opening Air Lock Door to Transfer Matl from Containment.Operator Transported Offsite for Medical Attention.No Serious Injuries or Contamination Found PNO-V-87-035, on 870507,individual W/Contamination Level of 160,000 Dpm/Square Centimeters on Knees Became Ill While Removing Protective Clothing Worn for Decontaminating Equipment.Individual Transported to Hosp & Decontaminated1987-05-0808 May 1987 PNO-V-87-035:on 870507,individual W/Contamination Level of 160,000 Dpm/Square Centimeters on Knees Became Ill While Removing Protective Clothing Worn for Decontaminating Equipment.Individual Transported to Hosp & Decontaminated PNO-V-87-031A, on 870417,licensee Reported Potential Foot Exposure of Plant Worker Exceeding 18.75 Rem Limit.Staff Retrained in Precautions to Minimize Exposure from Radioactive Matl & Appropriate Radiological Control Started1987-04-29029 April 1987 PNO-V-87-031A:on 870417,licensee Reported Potential Foot Exposure of Plant Worker Exceeding 18.75 Rem Limit.Staff Retrained in Precautions to Minimize Exposure from Radioactive Matl & Appropriate Radiological Control Started PNO-V-87-031, on 870417,licensee Reported Potential Foot Exposure of Plant Worker Exceeding 18.75 Rem Limit.Caused by Dispersal of Irradiated Fuel Fragments.Work Stopped in Containment Bldg.Investigation Initiated1987-04-17017 April 1987 PNO-V-87-031:on 870417,licensee Reported Potential Foot Exposure of Plant Worker Exceeding 18.75 Rem Limit.Caused by Dispersal of Irradiated Fuel Fragments.Work Stopped in Containment Bldg.Investigation Initiated PNO-V-87-029A, on 870414,licensee Reported That Degraded Pellet Between Reactor Vessel & Head Flange Source of Radioactive Contamination of Area & Personnel Inside Containment Bldg on 870409.Decontamination Efforts Ongoing1987-04-14014 April 1987 PNO-V-87-029A:on 870414,licensee Reported That Degraded Pellet Between Reactor Vessel & Head Flange Source of Radioactive Contamination of Area & Personnel Inside Containment Bldg on 870409.Decontamination Efforts Ongoing PNO-V-87-029, on 870409,while Installing Reactor Stud Plugs, Release of Radioactivity Occurred Resulting in 21 Workers Experiencing Personal Contamination.Work in Reactor Cavity Stopped Until Source of Problem Identified1987-04-10010 April 1987 PNO-V-87-029:on 870409,while Installing Reactor Stud Plugs, Release of Radioactivity Occurred Resulting in 21 Workers Experiencing Personal Contamination.Work in Reactor Cavity Stopped Until Source of Problem Identified PNO-V-86-077, on 861107 & 10,green & Yellow Wires Attached to Primer Cord Discovered at Excavation Site.Army Explosive Ordnance Detachment Removed Wire & Primer Cord.Util Studying Effects If Charge Detonated1986-11-10010 November 1986 PNO-V-86-077:on 861107 & 10,green & Yellow Wires Attached to Primer Cord Discovered at Excavation Site.Army Explosive Ordnance Detachment Removed Wire & Primer Cord.Util Studying Effects If Charge Detonated PNO-V-86-058A, on 860901,reactor Shut Down Due to Condenser Tube Leak.High Temp Alarms on Reactor Coolant Pump Motor Lower Radial Bearing B Received While in Mode 3.Caused by Bearing Damage.Bearing Being Replaced.Restart Due on 8609071986-09-0404 September 1986 PNO-V-86-058A:on 860901,reactor Shut Down Due to Condenser Tube Leak.High Temp Alarms on Reactor Coolant Pump Motor Lower Radial Bearing B Received While in Mode 3.Caused by Bearing Damage.Bearing Being Replaced.Restart Due on 860907 PNO-V-86-058, on 860901,controlled Shutdown Conducted Due to Condenser Tube Leakage.Blown Out Plugged Condenser Tube Found.Startup on Hold Due to Cleaning of Steam Generators W/ Chemical Impurities1986-09-0202 September 1986 PNO-V-86-058:on 860901,controlled Shutdown Conducted Due to Condenser Tube Leakage.Blown Out Plugged Condenser Tube Found.Startup on Hold Due to Cleaning of Steam Generators W/ Chemical Impurities PNO-V-86-054, on 860821,State of Wa Informed NRC of 860813 Suspension of Util Permit,Based on 860806 Shipment to Us Ecology.Shipment Contained 30 Gallons of Untreated Liquid in Shipping Cask1986-08-22022 August 1986 PNO-V-86-054:on 860821,State of Wa Informed NRC of 860813 Suspension of Util Permit,Based on 860806 Shipment to Us Ecology.Shipment Contained 30 Gallons of Untreated Liquid in Shipping Cask PNO-V-86-051, on 860805,safety Injection Occurred When Steam Line Pressure Transmitter Failed While Surveillance Being Performed on Second Steam Line Pressure Transmitter.All Sys Responded as Designed.Plant in Mode 3 Condition1986-08-0505 August 1986 PNO-V-86-051:on 860805,safety Injection Occurred When Steam Line Pressure Transmitter Failed While Surveillance Being Performed on Second Steam Line Pressure Transmitter.All Sys Responded as Designed.Plant in Mode 3 Condition PNO-V-86-033, on 860616,reactor Taken Critical.Caused by Physics Testing.Reactor Will Be Returned to Power on 860618. Problems W/Reactor Control Sys Thermal Expansion & Control Room Ventilation Sys Resolved1986-06-17017 June 1986 PNO-V-86-033:on 860616,reactor Taken Critical.Caused by Physics Testing.Reactor Will Be Returned to Power on 860618. Problems W/Reactor Control Sys Thermal Expansion & Control Room Ventilation Sys Resolved PNO-V-86-026, during 1985 Refueling Outage,Determined Hydraulic Snubbers Could Have Failed During Seismic Event & Unusual Movement of Pressurizer Surge Line Observed.Caused by Lockup of Snubbers.Snubbers Rebuilt1986-05-0202 May 1986 PNO-V-86-026:during 1985 Refueling Outage,Determined Hydraulic Snubbers Could Have Failed During Seismic Event & Unusual Movement of Pressurizer Surge Line Observed.Caused by Lockup of Snubbers.Snubbers Rebuilt PNO-V-86-017, on 860411,merchant Ship in Columbia River Veered Into Shore Near Plant,Damaging 30 Ft of Outfall Pipe. Svc Water Flow Uninterrupted.Plant Operating at 73% Power. Repairs Considered for Apr 1986 Refueling Outage1986-04-14014 April 1986 PNO-V-86-017:on 860411,merchant Ship in Columbia River Veered Into Shore Near Plant,Damaging 30 Ft of Outfall Pipe. Svc Water Flow Uninterrupted.Plant Operating at 73% Power. Repairs Considered for Apr 1986 Refueling Outage ML20138H1731985-12-10010 December 1985 PNS-V-85-007:on 851209,discovered 16 Oz ball-peen Hammer Inside Valve Cover of East Diesel Generator in Position Where Hammer Could Vibrate Into Moving Machinery.Tool Checkout Records Did Not Reflect Hammer Being Checked Out PNO-V-85-070, on 851008,two Plant Mod Personnel Received First & Second Degree Burns on Hands & Arms Due to Fire in Motor Control Ctr.Caused by Short Circuiting of Bus Bar by hand-held Cordless Drill1985-10-0808 October 1985 PNO-V-85-070:on 851008,two Plant Mod Personnel Received First & Second Degree Burns on Hands & Arms Due to Fire in Motor Control Ctr.Caused by Short Circuiting of Bus Bar by hand-held Cordless Drill PNO-V-85-063, on 850924,reactor Tripped Due to Loss of Main Feedwater Pump.Caused by Work on Condensate Demineralizer Sys Resulting in Flow Oscillations.Reactor Will Be Taken to Mode 5 to Repair Pressurizer Safety Valves1985-09-24024 September 1985 PNO-V-85-063:on 850924,reactor Tripped Due to Loss of Main Feedwater Pump.Caused by Work on Condensate Demineralizer Sys Resulting in Flow Oscillations.Reactor Will Be Taken to Mode 5 to Repair Pressurizer Safety Valves PNO-V-85-046, on 850720,reactor Tripped from 100% Power Due to Turbine Trip on Loss of Unit Auxiliary Transformer.Caused by High Temp When Failure of Control Relay Caused Loss of Cooling Fans1985-07-22022 July 1985 PNO-V-85-046:on 850720,reactor Tripped from 100% Power Due to Turbine Trip on Loss of Unit Auxiliary Transformer.Caused by High Temp When Failure of Control Relay Caused Loss of Cooling Fans PNO-V-85-039, on 850704,17 Gpm Leak Occurred Through RCS Drain Valves.Cause Not Reported.Leak Reduced by Increasing Torque on Valves.Torque within Manufacturer Requirements. Restart Activities Recommended After Valve Correction1985-07-0505 July 1985 PNO-V-85-039:on 850704,17 Gpm Leak Occurred Through RCS Drain Valves.Cause Not Reported.Leak Reduced by Increasing Torque on Valves.Torque within Manufacturer Requirements. Restart Activities Recommended After Valve Correction PNO-V-84-061A, on 840913,licensee Declared Unusual Event When Primary Coolant Began Leaking from High Pressure Tubing Fitting at Seal Table from Movable Incore Nuetron Detection Sys Tube E-5.Licensee Issued Press Release1984-09-14014 September 1984 PNO-V-84-061A:on 840913,licensee Declared Unusual Event When Primary Coolant Began Leaking from High Pressure Tubing Fitting at Seal Table from Movable Incore Nuetron Detection Sys Tube E-5.Licensee Issued Press Release PNO-V-84-010, on 840218,reactor Trip Safety Injection Occurred,When Replacement of Fuse During Isolation Valve Surveillance Test Caused Voltage Drop on Preferred Instrument Bus.State of or Notified1984-02-21021 February 1984 PNO-V-84-010:on 840218,reactor Trip Safety Injection Occurred,When Replacement of Fuse During Isolation Valve Surveillance Test Caused Voltage Drop on Preferred Instrument Bus.State of or Notified PNO-V-82-028A, on 820621,pieces of Metal Dislodged from Bottom of Core Barrel Assembly During Reinstallation.Plans for Recovery of Metal & for Exam of Bottom of Assembly Being Developed1982-06-21021 June 1982 PNO-V-82-028A:on 820621,pieces of Metal Dislodged from Bottom of Core Barrel Assembly During Reinstallation.Plans for Recovery of Metal & for Exam of Bottom of Assembly Being Developed PNO-V-82-028, on 820617,remote Video Exam of Metal Pieces Found in Bottom of Reactor Vessel Indicated That Pieces Are Probably from Thermal Sleeves.Thermal Sleeves Not Required Per Discussions W/Westinghouse1982-06-17017 June 1982 PNO-V-82-028:on 820617,remote Video Exam of Metal Pieces Found in Bottom of Reactor Vessel Indicated That Pieces Are Probably from Thermal Sleeves.Thermal Sleeves Not Required Per Discussions W/Westinghouse ML20216K0871978-09-15015 September 1978 PNO-78-165:on 780914 Licensee Notified Region V Resident Inspector or Crash of Light twin-engine Aircraft Adjacent to Trojan Site 1993-01-04 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000344/19990061999-09-0909 September 1999
[Table view]Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site ML20202C2111999-01-21021 January 1999 Notice of Violation from Insp on 971207-10.Violation Noted: Licensee Did Not Perform Survey to Assure Compliance with 10CFR20.1902(d) IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning ML20199F0291998-01-15015 January 1998 Notice of Violation from Insp on 971201-03.Violation Noted: Licensee Failed to Ensure Adequate Survey of Certain Contaminated Tools IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl ML20210S7131997-09-0909 September 1997 Notice of Violation from Insp on 970721-24.Violation Noted: from 960923-970515,licensee Failed to Conduct Surveys Adequate to Evaluate Quantity of Radioactive Matl Released from Radiological Controlled Area IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program ML20135B7491997-02-25025 February 1997 Notice of Violation from Insp on 970204-06.Violation Noted: Licensee Had Not Audited Annual Radiological Environmental Report TS 6.9.1.5.1 Since 890519 IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items ML20127E9461993-01-0808 January 1993 Notice of Violation from Insp on 921027-1207.Violation Noted:Licensees Corrective Actions Not Effective in That,On 921112 & 15,access Doors to Plant Issue Warehouse Not Controlled by Authorized Personnel PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart ML20126E9101992-11-25025 November 1992 Notice of Violation from Insp on 920915-1026.Violation Noted:Supervisor Informed of Receipt of a Nonconforming Component,Chlorine Detector & Did Not Initiate an Ncr ML20126E9131992-11-25025 November 1992 Notice of Deviation from Insp on 920915-1026.Deviation Noted:Containment Air Locks Not Tested Using Pressure Decay Method IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable ML20062F9301990-11-0808 November 1990 Notice of Violation from Insp on 900902-1006.Violation Noted:Temp of Train B Component Cooling Water Pump (ASME Code Class 3 Pump) Taken W/Instrument W/Scale More than Three Times Ref Value of Bearing Temp PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference 1999-09-09 |
Text
_
w
,, P PRELIMINARY NOTIFICATION OF SAFEGUARDS ~ EVENT PNS-V-89-05 Date June 16, 1989 This preliminary notification constitutes EARLY notice of events of POSSIBLE national.
s:curity or public interest significance. The information presented is as initially
- received without verification or evaluation and is basically all that is known by the Rcgion V staff on this date.
FACILITY: Portland General Electric Company Emergency Classification Trojan Nuclear Plant Notification of Unusual Event Docket No. 50-344 Alert Site Area Emergency General Emergency X Not Applicable
SUBJECT:
DRUC INVESilGATION On June 15, 1989, approximately 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> (PDT), licensee security representatives
. informed NRC Region Y that they were investigating information concerning possible on-site use and sale of marijuana and cocaine by five contract employees, employed by Northwest Energy Services Company (NESCO).
On June 16, 1989, approximately 0811 hours0.00939 days <br />0.225 hours <br />0.00134 weeks <br />3.085855e-4 months <br />, the licensee telephc,nically advised NRC operations center that at 0749 hG es (PDT), they began interviewing the five contract employees. While conducting the interviews, the licensee simultaneously searched the contract employees' work area - - a warehouse outside of the protected area (PA), and the employees tool boxes stored inside the PA. During interviews, none of the five employees indicated involvement with illegal drugs. The licensee's searches met with negative results.
The licensee also required for-cause urinalysis drug tests of the five employees. Three employees agreed to these tests; results are pending. Two employees refused to be tested and their employment has been terminated. The licensee's continued investigation will include interviews with approximately 26 co-workers of the five contract employees.
The licensee determined that the five contract employees b ye not performed safety related duties.
The licensee will follow-up with a 30-day report '.ss required by 10 CFR 73.71.
The licensee does not plan to ist a a press release at this time.
At the time of this event, the plant was shut down, Mode V, performing eddy current examination of steam generator tubes.
This Preliminar Notification is issued for information only, and is current as of
, '1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> (PDT , June 16, 1989.
l D. Schaefer FTS 463-3785 - M. Schuster FTS 463-3780 CONTACT:
l g62g94890616' mwe9% w g
, s u/
I l
_ _ - _ - - - _ . _ _ l
, . *+
PNS-V-89-05; l-DISTRIBUTION BY 5520: FAX TO:
'Datef,h,feyTime 3:2 c Fiff Date Time Chairman ~ Ze~ch EDO RI INPO Comm. Roberts AEOD RII NSAC Comm. Carr PA0 RIII LICENSEE Comm. Rogers SLITP RIV RESIDENT INSPECTOR Comm. Curtiss NRR HCS. OPERATIONS OFFICER SECY NMSS PDR CA ARM OGC 01 MAIL T0:
ACRS RES DOT:(Trans. Only, Applicable State)
GPA