Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Letter Priority Request Arcsc". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML101480993  + (Letter Participation in Commission Meeting on Integrated Strategy on Spent Fuel Management on 06/25/10)
  • ML18219E001  + (Letter Participation to Date in the Nuclear Plant Reliability Data System (NPRDS))
  • ML19030A969  + (Letter Payment for Prescribed Fee for Full Power Operating License)
  • ML103410383  + (Letter Peach Bottom Atomic Power Station Unit 1- Issuance of Exemption from Security Requirements of 10 CFR Part 50 and 10 CFR Part 73 (TAC No. J00384))
  • ML18228A087  + (Letter Petition to Stop Government from Building Another Nuclear Power Plant Near Turkey Point)
  • ML13054A003  + (Letter Planned Inspection of TI-186 Inspection of Procedures and Processes for Responding to Potential Aircraft Threats at Fort Calhoun Station)
  • ML13054A004  + (Letter Planned Inspection of TI-186 Inspection of Procedures and Processes for Responding to Potential Aircraft Threats at Waterford Steam Electric Station, Units 3)
  • ML18219D944  + (Letter Plant Transient Analysis Report, XN-76-35)
  • ML12082A181  + (Letter Point Beach Nuclear Plant - Notification of NRC Inspection and Request for Information)
  • ML083590277  + (Letter Point Beach Request for Waiver of Plant Experience Requirement)
  • ML18219D953  + (Letter Possible Loss of Unirradiated Non-Radioactive Incore Moveable Detector, Discovered as Result of Internal Trace Investigation)
  • ML18227B314  + (Letter Post Accident Operation of the Emergency Core Cooling System to Control Concentration of Boric Acid in the Reactor Vessel)
  • ML18227B316  + (Letter Post Accident Operation of the Emergency Core Cooling System to Control Concentration of Boric Acid in the Reactor Vessel)
  • L-77-304, Letter Potential Reportable Occurrence in the Form of an Unplanned Construction Joint  + (Letter Potential Reportable Occurrence in the Form of an Unplanned Construction Joint)
  • ML102870781  + (Letter Prairie Island Exigent Amendment Notice to the Media)
  • ML081850470  + (Letter Prairie Island Nuclear Generating Plant, Units 1 and 2 Project Manager Assignment)
  • ML083330333  + (Letter Prairie Island Nuclear Generating Plant, Retraction of Request for Experience Requirement Deferral)
  • ML103070372  + (Letter Prairie Island Nuclear Generating Plant - Request for Information for Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Inspection; 05000282-11-002 and 05000306-11-002)
  • ML101390158  + (Letter Pre-Application Meeting with Maine Yankee to Discuss Proposed Security Fence Relocations at the Maine Yankee Independent Spent Fuel Storage Installation (TAC No. L24402))
  • ML091460257  + (Letter Preparation of an Supplemental Environmental Impact Statement (SEIS) for the Proposed Renewal of the Operating License for the Crystal River Unit 3 Nuclear Generating Plant (CR-3))
  • ML18127B104  + (Letter Pressure-Temperature Limits)
  • ML18219D856  + (Letter Prevention of Feedwater Line Water Hammer by Maintaining Feedwater Piping and Sparger Ring Sufficiently Filled)
  • ML061530027  + (Letter Priority Change for TS Change TS-06-09 - Revision of Ultimate Heat Sink)
  • ML25036A176  + (Letter Priority Request ANS)
  • ML25036A175  + (Letter Priority Request ASME)
  • ML25036A177  + (Letter Priority Request IEEE)
  • ML19093A564  + (Letter Proposal for a Permanent Solution and Schedule for Approval of Net Positive Suction Head Problem in Low Head Safety Injection and Recirculation Spray Pumps)
  • ML18227B243  + (Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Personnel Qualification)
  • ML18227B251  + (Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Air Filtration Systems)
  • ML18227B241  + (Letter Proposed Amendment to Appendix a of Operating Licenses, Concerning Exemption from Requirements with Respect to Method for Leak Testing Personnel & Emergency Airlocks After Each Opening)
  • ML18227B235  + (Letter Proposed Amendment to Appendix a of Facility Operating License, Consisting of Revisions Concerning Tendon Inspecxtions)
  • ML18227B253  + (Letter Proposed Amendment to Appendix a of Facility Operating Licenses, as a Result of Re-Evaluation of ECCS Cooling Performance Calculated in Accordance with Approved Westinghouse Evaluation Model)
  • ML18227B257  + (Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Use & Surveillance of Motor Operated Valves)
  • ML18227B234  + (Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Deletion of Requirement for Annual Operating License)
  • ML18227B249  + (Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Analysis Performed by Applicants NSSS Vendor Results Related to Reactor Core Thermal Power Output)
  • ML18227B248  + (Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Analysis Performed by Applicants NSSS Vendor Results Related to Reactor Core Thermal Power Output)
  • ML18227B236  + (Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Revision of Figure 6.2-1 to Reflect Minor Change to Offsite Organization)
  • ML18227B260  + (Letter Proposed Amendment to Facility Operating Licenses to Authorize Operation of the Units with Up to 19% of the Steam Generator Tubes Plugged)
  • ML18227C701  + (Letter Proposed Amendment to Facility Operating Licenses Re Effects of Fuel Rod Bowing on the DNBR Margin)
  • ML18227C700  + (Letter Proposed Amendment to Facility Operating Licenses Re Valve Test, Pump Test, and Inservice Inspection Programs)
  • L-77-106, Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Options Available for Offsetting an Increased Rod Bow Penalty  + (Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Options Available for Offsetting an Increased Rod Bow Penalty)
  • ML18227B255  + (Letter Proposed Amendment to Facility Operating Licenses, Requesting Exemption from Requirements of Section III B on Method for Leak Testing Personnel and Emergency Airlocks After Each Opening)
  • L-77-130, Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Proposed Valve Test, Pump Test, and Inservice Inspection Programs  + (Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Proposed Valve Test, Pump Test, and Inservice Inspection Programs)
  • ML18227B258  + (Letter Proposed Amendment to Operating License to Allow Full Power Operation with Up to 25% of the Steam Generator Tubes Plugged)
  • ML18227B245  + (Letter Proposed Amendment to Operating License to Allow Operation Until Next Scheduled Refueling Outage Prior to Inspection of Steam Generators)
  • ML18227B238  + (Letter Proposed Amendment to Operating License to Allow Operation Until Next Scheduled Refueling Outage Prior to Inspection of Steam Generators)
  • ML18227B237  + (Letter Proposed Amendment to Operating License to Allow Operation Until Next Scheduled Refueling Outage Prior to Inspection of Steam Generators)
  • ML18227B239  + (Letter Proposed Amendment to Operating License to Allow Operation Until Next Scheduled Refueling Outage Prior to Inspection of Steam Generators)
  • ML18227D810  + (Letter Proposed Amendment to Section 3.D.1 of Operating License to Require Steam Generators to Be Inspected During Next Refueling Outage or Sooner If Warranted by Operating Experience)
  • ML18219D877  + (Letter Proposed Change to Technical Specifications to Delete Requirement for an Annual Operating Report and Modify the Content of Monthly Operating Report)