Letter Proposed Amendment to Operating License to Allow Operation Until Next Scheduled Refueling Outage Prior to Inspection of Steam Generators
ML18227B245
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/06/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML18227B245 (8)


Text

U.S. NUCLEAR REGULATORY COMMISSION NRC.FoRM 495 (2i76)

NRC DISTRISUTION FDR RT 60 DOCKET II/IATERIAL DOCKET NUMBER aa- ~e

'FILE NUMBER TO:: Victor Stello FROM:

Florida Pwr G Lgt Co.

Miami, FL R.

E. Uhrig DATE OF DOCUMENT 7/6/77 DATE RECEIVED 7/11/77

@LETTER

+ORIGINAL Qcopv I

DEscRIPTIDN'OTORIZED 5% NC LASS IF IE D PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED s) c<~

DP NOT 1IEMQX@'roposed amendmen to facility operating license no.

DPR-P4, for extended operating time period.

"3p I

~I

'L'ANT NAME:

Turkey Point Power PLant Unit'No.

3 RBT 7/12/77 ECT MANAGER:

FOR ACTION/INFORMATION ASSIGNED AD:

BRANCH CHIEF:.

PROJECT MANAGER:

ENVIRHNMENTAL V~ MOORE LTR ICENSING ASSXSTANT:

Kb'Vl" "

LICENSING ASSISTANT:

INTERNALD STFMS SAFETY HEINEMAN R EDER B

HARLESS ISTRIBUTION PLANT SYSTEMS TEDESCO BENAROYA SITE SAFETY &

ENVIRON ANALYSIS DENTON & MULLER ENGINEERING IPPOLITO OPERATlNG REACTORS ENVIRO TECH ERNST GBLOOD VAK RO ZTOCZY CHECK AT I ALTZMAN R TBERG EXTERNALDISTRIBUTION BAER BUTLER GRIME GAMMILL 2

SI'ZE ANALYSIS VOLLiKR BUNCH J ~ COLLINS CONTROL NUMBER TIC REG IV J

HANCHETT 16 CYS ACRS SENT CAT GO Y NSIC 77i93O3yy II'

0 1

I yl

P.O. BOX 013100, MIAMI, FL 33101 FLORIDA POWER & LIGHTCOMPANY July 6, 1977 L-77-'207, Director of Nuclear Reactor Regulation Attention:

Mr. Victor Stello, Director Division of Operating Reactors U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Stello:

Re:

Turkey Point Unit 3 Docket No.

50'-250 Proposed Amendment to Facility 0 eratin License DPR-31

$ 1i IO Q

5

@(P~xs+

sa

~pa G<

y In accordance with 10 'CFR 50.30, Florida Power 6 Light Company submits herewith three (3) signed originals and forty, (40) copies of a request to amend Facility Operating License DPR-31.

Section 3.E of License DPR-31 requires that Unit 3 be shutdown within 6 equivale'nt months of operation from January 14, 1977 (approximately July 16, 1977) for the purpose of inspecting steam generators.

We would like to continue operating Unit 3 until August 16, 1977 in order to avoi.'d concurrent shutdown of Units 3 and 4.

The need for this request has been caused by our extension of the Unit 4 refueling outage for from 3 to 5 weeks beyond the scheduled completion date of July 9, 1977.

As described in the preceding paragraph, Unit 3 is required to shutdown for steam generator inspections, during this same time period.

However, because the Unit 3 st'earn generators have experienced no perceptible tube leakage since 'the beginning of Cycle 4 operation, it is reasonable to expect that Unit 3 can continue to operate beyond July 16, 1977 without adverse effect on the public health and safety.

As a result of the extended Unit 4 refueling outage, we request the following amendment to paragraph 3.E of the Turkey Point Unit 3 Facility Operating License:

77i930377 I,

PEOPLE..

~ SERVING PEOPLE

Director of Nuclear Reactor Regulation Page Two E.

Steam Generator Ins ections In order to perform an inspection of the steam generators, Unit No.

3 shall be brought to the cold shutdown condition no later than August 16, 1977.

Nuclear Regulatory Commission approval shall 'be obtained before xesuming power operation following this inspection.

,Unit No.

3 operation until August l6, 1977 is authorized provided that further information and evaluations required in, connection with continued operation of Unit 'No. 4, as a

result of Amendment No.

20 to Facility Operating License DPR-41, justify continued operation of Unit No.

3 for the full period authorized by this paragraph 3.E.

The proposed amendment has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power S Light Company Nuclear Review Board.

They have concluded that continued operation of Unit 3 for the time period requested will not adversely affect, the public health and safety.

Very truly yours, r

obert E. Uhrig Vice President

'REU/MAS/cpc cc'.

Mr. Norman C. Moseley,

.Region II Robert Lowenstein, Esquire

0 0

p

STATE OF FLORIDA

)

)

COUNTY OF DADE

)

st Robert E. Uhrig, being first. duly sworn, deposes and says:

That he is a Vice President of Florida Power

.s Light. Company, the Licensee herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

Robert E. Uhrig Subscribed and sworn to before me this aay oZ NOTARY UBLIC, in and for the County of Dade, ROTARY PUBLIC STATE OF FLORIDA at LARGE State of Florida 4Y COhtMISSIOM EXPIRES APRIL 2,

lSSO

~

~

~

~

tOHDED THRU hIAYblARD BOIIDIIIG'GENCY Ny commission expires:

IO il

~ ~