Letter Proposed Amendment to Appendix a of Operating Licenses, Concerning Exemption from Requirements with Respect to Method for Leak Testing Personnel & Emergency Airlocks After Each Opening
ML18227B241
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/27/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML18227B241 (10)


Text

NRQ FORM 195 12-78)

U.S. NUCLEAR REGULATORY i<MMISSION E

'GMMS~ I NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL E

UMBER TO:

IEII.ETTER

~ORIGINAL OCOPY DESCRIPTION MNOTORIZED RIUNCLASSIFIED Mr. Victor Stello PROP INPUT FORM ENCLOSURE FROM:

Florida Power

& Light Company Miami, Florida Robert ED Uhri DATE OF DOCUMENT 7/27/77 DATE RECEIVED 8/1/77 NUMBER OF COPIES RECEIVED

)~@5%

gg~~h+

License No DPR-31

& 41 Appl for Amend:

tech specs proposed change concerning exemption from requirements with respect to the method for leak testing personnel and emergency airlocks after each opening notorized 7/29/77 ~ ~ ~ ~ ~

PLANT NAME: Turkey Point Units 3 & 4 RJL 8/2/77 FOR ACTION/INFORMATION ENVIRHNMENTAL E

MANAGER:

ICEN ING ASSXSTAiVP:

ASSIGNED AD.

Vi MOORE LTR BRANCH CHIEF:

PROJECT MANAGER:

LICENSING ASSISTANT:

INTERNALD QTFMS SAFETY HEINI.'MAN EDER Bo HARLESS ISTRl BUTION PLANT SYSTEMS TEDESCO BENAROYA SITE SAFETY &

ENVIRON ANALYSIS DENTON & MULLER ENGINEERIiIG.

IPPOLITO OPERATING REACTORS EIIIRO TECH ERNST i'LOOD CHECK AT I A TZMAN ERG EXTERNALDISTRIBUTION B

ER RIME GAMMILL 2

SITE ANALYSIS VOLLMER BUNCH J ~ COLLINS KREGER CONTROL NUMBER TIC NSIC REG IV J

HANCHETT 16 CYS ACRS SENT CAT GO Y NRC FORM 19$ I2 76)

i5 Ip (t

P. O..BOX 013100, MIAMI, FL 33101 nA, I

)

Director of Nuclear Reactor Regulation Attention:

Mr. Victor Stello,, Directo'r.

Divi.sion of'perating Reac'tors U..

S. Nuclear Regulatory Commission Washington DC 20555,'..

Dear Mr. Stello:

Regs ad%.

Re:

Turkey Point Units 3

6 4

Docket Nos. 50-25'0'nd 50-251 Proposed Amendment to Facility Operatin Licenses DPR-31 and DPR-41 FLORIDA PGWER & L'IGHTCOMPANY July 27, 1977 L-77-239 Our letter of May 2, 1977, (L-77-134) requested'ha't Appendix A of Operating Licenses DPR-31 and DPR-41 be amended.

This letter supersedes our previous request.

On February 28,

1977, we received a letter from Mr. George Lear of your staff asking.that we revise our request of September 12,
1975, (L-75-4'37)- for exemption from certain requirements of Appendix Z to 10 CFR 50..

Specifically, we are requesting, pursuant to 10 CFR 50.12, exemption from the requirements of Section III.

B with respect to the method for leak testing personnel and emergency airlocks after each opening,.

Section III. B requires that such tests be performed by local pneumatic pressurization at a pressure

'not less than the postulated peak'accident pressure (Pa) inside containment.

However, for reasons described in our September 12, 1975, letter, we plan to use a vacuum test device to leak test the airlock door seals after each opening in lieu of a positive pressure test of the entire airlock.

This exemption request has been reviewed by the Turkey Point. Plant Nuclear Safety Committee (PNSC) and the Florida Power 6 Light Company Nuclear Review Board (CNRB) with the following conclusions:

1).

The request for exemption, as stated above, is necessary.

2)

The request appears to conform with guideline 3 in. Enclosure 2 to Mr. Lear's letter.

3)

We intend'o comply with the requirements of Appendix J regarding the frequency of airlock testing.

A Type B test of.the entire airlock will be performed at least every 6 months and a vacuum test of the door seals will be performed after each opening.

PEOPLE... SERVING PEOPLE'

'I fi

L-77-239 July 27, 1977 Mr. Victor Stello page 2

4)

One objective of airlock leak testing, as stated in 'Enclosure 2 to Mr. Lear's letter, is that the "after each opening" test will provide a means of assuring that the door seals have not been damaged or seated im-properly during airlock use.

The vacuum test will facilitate our accomplishment of this objective.

5)

The vacuum test is an industry approved alternative to a pressure test.

6)

Performance of a door seal vacuum test will not adversely affect the health and safety or the common defense and security of the public.

As a result of this exemption request.,

we propose to modify our Technical Specifications on airlock leak testing.

The present proposal supplements our previous proposal of September 20, 1974.

In accordance with 10 CFR 50.30, three (3) originals and forty (40) copies of our request to amend Appendix A of Operating Licenses DPR-31 and DPR-41 are attached.

The proposed changes are described below and shown on the accompanying Technical Specification page bearing the date of this letter in the lower right hand corner.

Pa e 4.4-2 Specification 4.4.2..2 is revised to conform with our plans for leak testing airlocks.

The PNSC and CNRB have also reviewed the proposed Technical Speci-fication amendment and have concluded that it does not involve a significant hazards consideration and should not require pre-noticing.

Very truly yours, Robert E. Uhrig Vice President REU'.NR:tm Attachment cc:

Norman C. Moseley, Region II Robert Lowenstein, Esquire

4i

~,

4.4.2 LOCAL PENETRATION'ESTS Test Procedure and Fre uenc Local leak detection tests of the following compo-nents shall be performed at a pressure not, less than 50 psig using pressure

decay, soap bubble, halogen detection or equivalent methods at <he frequency listed, unless otherwise noted:

1.

Containment purge valves (pressure applied in connecting duct) each refueling.

2.

Personnel and Emergency Airlocks a.

  • Nithin 3 days o'f every first of a series of openings when containment, integrity is re-quired, verify that door seals have not, been damaged or seated improperly by vacuum testing the volume between the door seals in. accordance with approved plant procedures.

b.

At least once per 6 months, conduct an overall airlock leakage test to verify that the overall airlock leakage rate is within its limit.

3.

Equipment. access opening (pressure applied between gaskets) annually and after use.

4'.

Fuel transfer tube flange (pressure applied between gaskets) each refueling.

5.

Electrical penetrations (pressure applied to canister) each refueling Acce tance Criteria Repairs and tests shall be made whenever the sum of the local leak rate tests, including the isolation valves discussed in 4.4'.4, exceeds sixty percent of the total containment allowable leak rate.

4.4.3 REPORT OF TEST RESULTS Each integrated leak rate test will be the subject of a summary technical report, including

In accordance with NRC Staff position.

4.4-2 7/27/77

4l, r.

STATE OF FLORIDA

)

)

'COUNTY OF'ADE

)

ss

~

Robert E. Uhrig, being first duly sworn, deposes and says:

That, he is a Vice President of Florida Power

& Light Company, the Licensee herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document, on behalf of said Licensee.

Robert E. Uhrig Subscribed and sworn to before me this day of 19~7 li

<st,!a Oy

'a V

i"c' NOTARY PU LIC, in and for t e County o

Dade,,

State of Florida IIOTAIIY PUBLIC STATS OF FLCPLOA at LAiiSE h'IY COhtiAlSSlOV EXPIBOS hlAY S,

tNI Bg(OQ TIIP) hVljYhAIIO BQ'iVQ<ViQ bi LIiQt Ny commission expires:

41

~i k

k II g

6I Qf pg

)

Qpqf g)g

,,"> p sl<isszaqa r

Li'3h'AQGQ Qgp[gg gg