IIIRC FORM 195 (2-78)
UN. NUCLEAR REGULATORY CG-o ISSION DOCKE UMBER NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL FILE NUMBER TO:
Mr., Victor Stello I
Florida Power G Light Co.
Miami, FL Robert E. Uhrig DATE OF DOCUMENT 8 577 DATE RECEI VE D 8
8 ETTE R ORIGINAL QCOPY OTOR IZED UNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED 8
G DESCRIPTION t)() g)y 5.M0%
ENCLOSURE License gDPR-31, Application for Amed:
tech specs proposed change concerning T%
continued operation of the Turkey Point Unit untillthe next refueling without conducting an inspection of the steam generators.
Notarized on88/5/77.
PLANT NAME:
\\
VT 8
9 77
((2'-R))
(1-P)
FOR ACTION/INFORMATION ENVIRHNMENTAL CT MANAGER:
CENSING ASSISTANT:
ASSIGNED AD:
V~ MOORE LTR BRANCH CHIEF.
PROJECT MANAGER:
LICENSING ASSISTANT:
INTERNAL0 TFMS SAFETY E
ER ENGINEERING IST Be HARLESS R I BUTION PLACK SYSTEMS TEDESCO BENAROYA IPPOLITO OPERATING REACTORS SITE SAFETY &
ENVIRON ANALYSIS DENTON & MULLER ENVIRO TECH ERNST BALLARD GBLOOD CHECK A I ALTZP~
ERG EXTERNALDISTRIBUTION BAER B
ER GAMMILL 2
SITE ANALYSIS VOLLMER BUNCH J
COLLINS KREGER CONTROL NUMBER TIC NSIC REG IV J
HANCHETT 16 CYS ACRS SENT CATE NRC FORM 195 I2 7B).
GO
'V
0 fthm>>'ll'.
l P,)
FLORIDAPGWER & LIGHT COMPANY August 5, 1977 L-77-246 Director of Nuclear Reactor Regulation Attention:
Mr. Victor Stello, Director Division of Operating, Reactors U.
S. Nuclear Regulatory Commission Washington DC 20555
Dear Mr. Stello:
Re:
Turkey Point U
.'ocket No. 50-Proposed Amendment to Facilit 0 eratin License DPR-3l In accordance with 10 CFR 50.30, Florida Power 6 Light, Company submits herewith three
'(3) signed originals and forty (40) copies of a request to amend Facility Operating, License DPR-31.
Section 3eE of License DPR-31 requires that Unit 3 be shut-down by August 16, 1977, for the purpose of inspecting steam generators.
In view of the continued excellent operating record of Turkey Point Unit 3., Florida Power,S Light Company has concluded that Unit 3 can safely be operated until the next refueling (presently scheduled for January 1978), without conducting an inspection of the steam generators.
I'f the steam generator inspection of Unit 3 is conducted as presently required the cost to our customers will be approximately
$ 12,000,,000
($ 4'00,000/day X 30 days)'n differ-ential fuel cost and approximately 20-50 man rem exposure will be experienced.
Since the beginning of cycle 4 operation no steam generator tubes, have had to be plugged as a result of primary to secondary leakage.
Our recent inspection of Turkey Point Unit 4
(FPL letter L-77-173 of June 9,
1977) demonstrated in part that any significant, amount of steam generator tube denting would be accompanied by an increased incidence of primary to secondary leakage.
The excellent operating record at Unit 3 is strong evidence of the.continued integrity of the steam generator tubes.
PEOPLE... SERVING PEOPLE
0 0
Mr. Victor Stello L-77-246 page 2
Since there has been no evidence of steam generator tube degredation during cycle 4 operation, it is highly unlikely that an inspection of the steam generators at this time would result in any benefit.to the public.
In light of the high cost of this inspection to the public noted'bove, and the strong evidence of the continued integrity of the steam generator
- tubes,
.we have concluded that the inspection of the steam generators should be.postponed until the next refueling.
We therefore request the following. amendment to paragraph 3.E of the Turkey Point Unit 3 Facility Operating License:
E.
Steam Generator Ins ections Unit 3 steam generators shall be inspected during the next refueling outage.
Nuclear'.
Regulatory Commission approval shall 'be obtained'efore resuming power operation following this inspection..
The proposed amendment has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power 6
Light Company Nuclear Review Board..
They have concluded that continued operation of Unit 3 for the time period requested will not involve an unreviewed safety question.
\\
Very truly yours, Robert E. Uhrig Vice President.
%U:GDW:tm cc:
Norman C. Moseley, Region II Robert Lowenstein, Esquire
0 Ik
.J~
p
STATE OF FLORlDA
)
)
COWL1TY OF DADE
)
ss J.
J.. Hudibur being first duly sworn, deposes and says:
That he is Executive Vice President Light Company, the Licensee herein;
~of Florida Power That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
J/J.'udiburg Subscribed and sworn to before me th'is day of NGTARY PUB C, in and for State of Florida My commission expires:
he C unty o
- Dade, NOTARY PItBLIC STATE PF FLORIDA at LARGE AY COtRMISSION EXPIRES tlAY 5
1831 BONDED THRU VAYNARD BONDING AGENCY
Ik
~I qC L8 Ol Nf 8
6Af J.l6l "4(A 44IIVO~VMCM i))..iHAOGQ.Q3AI~'338