Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14035A575 + (January 28, 2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, LRA)
- ML19029A017 + (January 28, 2019, Teleconference with TSTF TSTF-542 Impementation Guidance)
- ML26029A451 + (January 28, 2026, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed LAR to Change TS 3.5.2, Core Makeup Tanks - Operating for Vogtle Electric Generating Plant, Units 3 and)
- ML26023A116 + (January 29 2026 Letter to J Semancik Re Connecticut Non-Standard License Condition)
- ML26027A053 + (January 29 2026 Letter to M. Gries Re Nebraska National Material Program Introduction to New Rcpd)
- ML26027A117 + (January 29 2026 Letter to T. Sonnenburg Re Utah National Material Program Introduction to New Rcpd)
- ML13015A114 + (January 29, 2013, Notice of Meeting with Constellation Energy Group LLC, Regarding Diverse and Flexible Coping Strategies (FLEX))
- ML15043A239 + (January 29, 2015, Summary of Pre-licensing Meeting with PSEG Regarding Digital Upgrade of Power Range Neutron Monitor (Prnm))
- ML24039A180 + (January 29, 2024 Teleconference Between the U.S. Nuclear Regulatory Commission and Xcel Energy)
- ML25027A411 + (January 29, 2025, Meeting Presentation for Framatome ANP-10358P, Revision 0, Increased Burnup for Pressurized Water Reactors Topical Report (Affidavit))
- ML25027A041 + (January 29, 2025, Meeting Presentation for Framatome ANP-10358P, Revision 0, Increased Burnup for Pressurized Water Reactors Topical Report (Public))
- ML18032A219 + (January 30 2018 Summary of Conference Call with Areva Holdings SAS to Preliminarily Discuss Plans to Change the Companys Name to Orano)
- ML18033B057 + (January 30, 2018 NRC-NuScale Public Meeting Summary - TSC Functions and RAI 8925)
- ML23037A890 + (January 30, 2023, Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginn)
- ML24052A348 + (January 30, 2024, Closed Meeting with GE Vernova, Global Nuclear Fuel - Americas, Terrapower, and DOE Regarding Impacts of Potential OFF-SPECIFICATION Sources of HALEU on Planned Natrium Project Related Licensing)
- ML24047A118 + (January 30, 2024, U.S. Nuclear Regulatory Commission Summary of the Observation Public Meeting on the Status of Nuscales US460 Standard Design Approval Application)
- ML24109A293 + (January 31 2024 Meeting Summary of Public Meeting with X-Energy to Meteorological Data for Project Long Mott (1).docx)
- ML24057A383 + (January 31 2024 Summary of Partially Closed Meeting with NIST to Discuss Draft RAIs (2023 License Renewal Application))
- ML25029A031 + (January 31 2025 Letter to Blackwell Re Louisiana Final Revisions to Rats Ids 2021 1 and 2021 2)
- ML12033A134 + (January 31, 2012, Summary of Telephone Conference Call Held Between the NRC and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Application)
- ML18037B032 + (January 31, 2018 Conference Call to Clarify Draft Request for Additional Information in the Areas of Integrated Safety Analysis Summary and Management Measures, Honeywell Metropolis Works (CAC 000224/04003392/L-2017-RNW-0002) and Enclosures)
- ML20045D108 + (January 31, 2020 Meeting Summary Pre-Amendment Meeting Proposed Changes to Pilgrim ISFSI Physical Security Plan)
- ML22032A311 + (January 31, 2022, Summary of Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Extending the Clinton Power Station, Unit 1, Secondary Containment to Include the Fuel Building Railroad Ai)
- ML23069A036 + (January 31, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests (EPID L-2021-LLI-0000 and EPID L-2021-LLI-0002))
- ML24029A038 + (January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions)
- ML25267A118 + (January 4 2023 Washington Revised Program Improvement Plan)
- ML110380045 + (January 4, 2011, Summary of Telephone Conference Call Held Between NRC and PG&E Regarding the Severe Accident Mitigation Analysis for the Proposed License Renewal of Diablo Canyon Nuclear Power Plant, Units 1 and 2)
- ML17005A100 + (January 4, 2017, Summary of Meeting to Discussion STPs Response to Request for Additional Information the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility)
- ML24003A853 + (January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108))
- ML25266A213 + (January 5 2023 Washington Revised Program Improvement Plan)
- ML25363A135 + (January 5 2026 Letter to M Mckinley Re Kentucky Periodic Meeting Scheduling Letter and Agenda)
- ML25344A021 + (January 5-9, 2026, Regulatory Audit Plan for Framatome Inc. Topical Report, ANP-10357P, Revision 0, Txs Compact Platform Topical Report Regarding Quality Assurance (EPID L-2024-TOP-0029) (Letter))
- ML25344A029 + (January 5-9, 2026, Regulatory Audit Plan for Framatome Inc. Topical Report, ANP-10357P, Revision 0, Txs Compact Platform Topical Report Regarding Quality Assurance (EPID L-2024-TOP-0029) (Non-Proprietary))
- ML15014A004 + (January 6, 2015 Letter to Linda Baldwin Re Agreement Between Entergy and Nysdos)
- ML15075A246 + (January 7 & 15, 2015 Summary of Meetings with Firstenergy Nuclear Operating Company to Discuss Alternative Source Term Implementation as a Result of Fuel Change)
- ML25356A129 + (January 7 2026 Letter to M Miano Re New Mexico Draft Impep Report)
- ML16028A116 + (January 7, 2016, Summary of Pre-Application Teleconference with NextEra Energy Duane Arnold, LLC, for Duane Arnold Spent Fuel Criticality Analyses)
- ML26008A147 + (January 8 2026 Letter to J Harthcock and C Goodin Re Texas Impep Scheduling Letter and Questionnaire)
- ML12356A085 + (January 8, 2013 - Notice of Teleconference with Calvert Cliffs Nuclear Power Plant, LLC)
- ML19022A244 + (January 8, 2019 Summary of Webinar for the Public on NRC Oversight of Pilgrim Nuclear Power Plant Decommissioning Activities)
- ML25255A019 + (January 9, 2025, Wy State Engineer Final Opinion, Terrapower, LLC, Kemmerer Unit 1)
- ML18018A579 + (January 9th 2018 Public Meeting Summary NUMARC 93-01 4E)
- ML13017A157 + (January Hearing File Update)
- ML040550387 + (January Monthly Operating Report for Millstone, Units 2 and 3)
- ML050630070 + (January Monthly Report on the Status of Open TIAs Assigned to NRR)
- ML20138K028 + (January Monthly Rept for Inel Technical Assistance to Nrr/ Disp)
- ML20029E946 + (January Nuclear Waste Fund Report to Congress (Enclosure))
- ML110200279 + (January Update - Projected Schedule for Completion of the Safety and Environmental Evaluations)
- ML24355A111 + (Janusz - Assessing the Impact of Nonlinearity and Liquefaction on the Local Seismic Hazard Using CPT-calibrated Soil Models)
- ML120930727 + (Japan Acknowledges Nuclear Failings. Petitioners Exhibit-5)
- PMNS20241267, Japan Atomic Energy Agency (Jaea) Floating Seismic Isolation System (Fsis) for SMRs Pre-Application Engagement to Discuss the Jaea Fsis Quality Assurance Program and the Jaea Fsis Technology + (Japan Atomic Energy Agency (Jaea) Floating Seismic Isolation System (Fsis) for SMRs Pre-Application Engagement to Discuss the Jaea Fsis Quality Assurance Program and the Jaea Fsis Technology)