Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML19130A1672019-05-14014 May 2019 May 8, 2019 Summary of Teleconference with Northern States Power Company, Doing Business as Xcel Energy, to Discuss a Response to a Request for Additional Information Related to the License Amendment Request to Adopt 10 CFR 50.69 Project stage: RAI ML23087A0222023-03-15015 March 2023 Submittal of X Energy, LLC (X-energy) Xe-100 Slide Deck, Control Room Operator Qualification Discussion Project stage: Request PMNS20230299, Meeting with X Energy, LLC Regarding the Structure of the Xe-100 Construction Permit Application2023-03-22022 March 2023 Meeting with X Energy, LLC Regarding the Structure of the Xe-100 Construction Permit Application Project stage: Meeting PMNS20230339, Meeting with X Energy, LLC Regarding the Xe-100 Slide Deck Control Room Operator Qualification Discussion2023-04-0505 April 2023 Meeting with X Energy, LLC Regarding the Xe-100 Slide Deck Control Room Operator Qualification Discussion Project stage: Request ML23104A4352023-04-14014 April 2023 Submittal of X Energy, LLC (X-energy) Slides for Xe-100 White Paper, Graphite Material Qualification Project stage: Request PMNS20230413, Discussion of the X-energy White Paper, Graphite Qualification Methodology2023-04-18018 April 2023 Discussion of the X-energy White Paper, Graphite Qualification Methodology Project stage: Request ML23159A0202023-06-13013 June 2023 Letter and Enclosure 1 - Summary of the April 17, 2023, Closed Meeting with X-Energy, LLC Regarding the XE-100 Slide Deck Control Room Operator Qualification Discussion Project stage: Meeting ML23172A2352023-06-21021 June 2023 Summary of Meeting with X-Energy, LLC Regarding the Structure of the XE-100 Construction Permit Application Project stage: Meeting ML23207A1882023-07-0808 July 2023 Summary for April 24, 2023 Partially-closed Meeting with X-energy Regarding the Graphite Material Qualification Methodology White Paper - Redacted Project stage: Meeting ML23212B2112023-07-31031 July 2023 Submittal of X Energy, LLC (X-energy) Xe-100 Graphite Qualification Regulatory Engagement Plan Project stage: Request ML23258A1052023-09-15015 September 2023 X-Energy, LLC, Xe-100 Spent Fuel Management Licensing Approach White Paper Project stage: Request PMNS20231062, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-09-21021 September 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting PMNS20231063, Pre-Application Meeting with X-energy to Discuss the Proposed White Paper on Spent Fuel Management for the Xe-100 High Temperature Gas Reactor2023-09-25025 September 2023 Pre-Application Meeting with X-energy to Discuss the Proposed White Paper on Spent Fuel Management for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML23271A2562023-10-12012 October 2023 X-Energy, LLC, Xe-100 Graphite Engagement: Xe-100 Graphite Engagement: Ignis Graphite Modeling Toolset Used in Xe-100 Analyses and Qualification Approach Project stage: Request PMNS20231069, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-10-12012 October 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting PMNS20231213, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-11-0606 November 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML23303A2082023-11-0909 November 2023 X-Energy, LLC, Xe-100 Graphite Engagement: ASME Service Level Definition, LBE Mapping, and Design Loadings for Graphite Core Assembly Project stage: Request ML23325A2412023-11-21021 November 2023 X-Energy, LLC, Xe-100 Preliminary Safety Analysis Report (PSAR) Chapter 2 Site Characteristics and Environmental Report Project stage: Request PMNS20231302, Notice of Meeting with X Energy, LLC2023-11-29029 November 2023 Notice of Meeting with X Energy, LLC Project stage: Request ML23319A2392023-11-30030 November 2023 October 5 2023 Meeting Summary Public Meeting with X-Energy to Discuss Graphite Qualification Project stage: Meeting ML23332A7652023-12-12012 December 2023 X-Energy, LLC, Xe-100 Principal Design Criteria (PDC) Project stage: Request ML23244A2732023-12-31031 December 2023 Enclosure 2: X-Energy, LLC, Presentation Materials - Xe-100 Graphite Engagement: Material Model Project stage: Request ML23319A3592024-01-0404 January 2024 Summary of Public Meeting with X-Energy, Llc., to Discuss Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting ML23355A0762024-01-0404 January 2024 Summary of Public Meeting with X-Energy, Llc., to Discuss Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting ML24004A0212024-01-10010 January 2024 Summary of Public Meeting with X-Energy, Llc., Spent Fuel Management White Paper Project stage: Meeting ML24002B1662024-01-17017 January 2024 Enclosure 2: Xe-100 Graphite Engagement: Transient, Fatigue, and Seismic Assessment Methodology Presentation - Open Meeting - Non-Proprietary (Public) Project stage: Request PMNS20231413, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2024-01-17017 January 2024 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML24011A2402024-01-25025 January 2024 X-Energy, LLC - Xe-100 Fuel Qualification Update Project stage: Request PMNS20231412, Pre-Application Meeting with X-energy to Discuss Their Fuel Qualification Plan for the Xe-100 High Temperature Gas Reactor2024-01-25025 January 2024 Pre-Application Meeting with X-energy to Discuss Their Fuel Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML24017A2552024-01-31031 January 2024 X-Energy, LLC, Use of Meteorological Data for Project Long Mott Project stage: Request ML24060A0012024-02-29029 February 2024 Meeting Summary - December 7, 2023 Public Meeting with X-Energy to PSAR Chapter 2 Project stage: Meeting ML24067A3002024-03-25025 March 2024 Letter - Request for Withholding Information from Public Disclosure for X Energy, LLC XE-100 Pre-Application Engagement Presentation Materials (EPID No. L-2018-RM-0076) Project stage: Withholding Request Acceptance ML24093A0852024-04-15015 April 2024 Summary of the January, 2024, Public Meeting with X Energy, LLC (X-Energy), XE-100 Fuel Qualification Update Project stage: Meeting ML24109A2872024-04-25025 April 2024 December 12 2023 Meeting Summary of Public Meeting with X-Energy to Discuss Principal Design Criteria Project stage: Meeting ML24109A2932024-04-25025 April 2024 January 31 2024 Meeting Summary of Public Meeting with X-Energy to Meteorological Data for Project Long Mott (1).docx Project stage: Meeting ML24122A9922024-05-23023 May 2024 Summary of the January 17, 2024 Public Meeting with X Energy, Llc. Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting 2023-06-21
[Table View] |
Text
MEMORANDUM TO:
Michael Wentzel, Chief Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Jorge Hernandez, Project Manager Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE JANUARY 31, 2024, PUBLIC MEETING WITH X ENERGY, LLC. (X-ENERGY), USE OF METEOROLOGICAL DATA FOR PROJECT LONG MOTT (EPID NO. L-2018-LRM-0076)
Meeting Information:
Applicant: X ENERGY, LLC. (X-energy)
Docket/Project No.(s): 99902071 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML24031A052 Applicant Presentation Slides ADAMS Accession No.: ML24017A255 Meeting Attendees: See the enclosure for a list of meeting attendees.
CONTACT:
Jorge Hernandez, NRR/DANU 301-287-9096 April 25, 2024 Signed by Hernandez Munoz, Jorge on 04/25/24
M. Wentzel Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271).
The purpose of the meeting was to conduct a regulatory engagement to discuss X-energys plans for installing a meteorological tower and the data collection to support deployment of their Xe-100 high gas temperature reactor at the Dow Chemical Company Long Mott Site, in Seadrift, TX.
The X-energys staff presentation discussed the following topics:
Current use of meteorological data in support of the construction permit application.
Relevant regulatory requirements and guidance.
Proposed use of meteorological data sources as an alternative to installing an onsite met tower.
No regulatory decisions were made as a result of this meeting.
Project No. 99902071
Enclosure:
List of Meeting Attendees cc: X-energy Xe-100 via GovDelivery
M. Wentzel
SUBJECT:
SUMMARY
OF THE JANUARY 31, 2024, PUBLIC MEETING WITH X ENERGY, LLC. (X-ENERGY), USE OF METEREOLOGICAL DATA FOR PROJECT LONG MOTT (EPID NO. L-2018-LRM-0076) DATED: APRIL 25, 2024 DISTRIBUTION:
PUBLIC RidsNrrDanuUal1 Resource RidsNrrDanuUal2 Resource RidsNrrDanu Resource AMuniz, NRR IJung, NRR Aghosh, NRR IJung, NRR RWang, NRR JWhite, NRR JThomson, NRR STabatabi, NRR NTiruneh, NRR PVokoun, NMSS JGiacinto, NMSS BParks, NRR GOberson, NRR ODukes, NRR JHernandez, NRR ADAMS Accession Number: ML24109A293 NRC-001 OFFICE NRR/DANU/UAL2/PM NRR/DANU/UAL2/BC NRR/DANU/UAL2/PM NAME JHernandez MWentzel JHernandez DATE 4/25/2024 4/25/ 2024 4/25/2024 OFFICIAL RECORD COPY
Enclosure List of Meeting Attendees For the January 31, 2024 Public Meeting With X Energy, LLC. (X-Energy), Use of Meteorological Data for Project Long Mott Name Organization Adrian Muniz U.S. Nuclear Regulatory Commission (NRC)
Barbara Hayes NRC Donald Palmrose NRC Greg Oberson NRC Ian Jung NRC Ian Tseng NRC Jason White NRC Jorge Hernandez Munoz NRC Jose Pires NRC Joseph Giacinto NRC Kevin Quinlan NRC Madelyn Nagel NRC Michael Wentzel NRC Michelle Hart NRC Nebiyu Tiruneh NRC Ondra Dukes NRC Patricia Vokoun NRC Rosalynn Wang NRC Zach Gran NRC Brian Froese X-energy Jessa Hultgren X-energy Jessica Maddocks X-energy Michael I. Dudek X-energy Milton Gorden X-energy Stephanie Yazzie X-energy Steve Vaughn X-energy Bobby Kunkle X-energy Daniel Strohmeyer X-energy Julia Sharma X-energy Erwin T Prater X-energy (Contractor)
Greg Boswell X-energy (Contractor)
Harley D Hutchins X-energy (Contractor)
Jessica E Howe X-energy (Contractor)
Maury A Pressburger X-energy (Contractor)
Russell S Light X-energy (Contractor)
Mark Feltner Dow Chemical Company David Yarwood U.S. Department of Energy Bradley G Fritz Pacific Northwest National Laboratory Dave Goodman Pacific Northwest National Laboratory Ed Everett American Nuclear Insurers Addison Hall Dominion Energy Rachel Turney Enercon Tim Basham Enercon Woody Wodrich Enercon
2 Name Organization Jan Mazza Holtec Steven Mitchell Holtec Steven Pope ISL Art Zaremba Duke Energy Jon Facemire Nuclear Energy Institute Martin O'Neill Nuclear Energy Institute Tony Brown Nuclear Energy Institute William Maher Preferred Licensing Services, Inc.
Kristen Lloyd WSP William Grimes WSP