January Monthly Operating Report for Millstone, Units 2 and 3
ML040550387
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/17/2004
From: Sarver S
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-104
Download: ML040550387 (14)


Text

Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Wlaterford, CT 06385 F2Dominion7 FEB I 7 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.

MPS Lic/web Docket Nos.04-104 RD 50-336 50423 DPR-65 NPF-49 License Nos.

DOMINION NUCLEAR CONNECTICUT, INC.

  • MILLSTONE POWER STATION UNITS 2 AND 3 JANUARY 2004 MONTHLY OPERATING REPORT AND REVISED MONTHLY
OPERATING REPORTS -FOR MILLSTONE UNIT NO. 2 FOR NOVEMBER AND DECEMBER 2003.

In accordance with the reporting requirements of Technical Specification 6.9.1.7 for

-Millstone Unit No. 2, and Technical Specification 6.9.1.5 for Millstone Unit No. 3, enclosed are the Monthly Operating Reports for the month of January 2004. contains the Millstone Unit No. 2 Monthly Operating Report and contains the Millstone Unit No. 3 Monthly Operating Report.

In addition, enclosed are revised Operating Reports for Millstone Unit 2 for the months of November and December 2003. The net generation numbers originally provided were derived from an incorrect data source. Attachment 3 contains the Millstone Unit No. 2 Revised Monthly Operating Report for November 2003 and Attachment 4 contains the Millstone Unit No. 2 Revised Monthly Operating Report for December 2003.

If you have any questions or require additional information, please contact Mr. 'David W.

Dodson at (860) 447-1791, extension 2346.

Very truly yours, Step P. Sarver, Director Nuclear Station Operations and Maintenance I --l'

, q a

eD

Serial No.04-104 JANUARY 2004 MONTHLY OPERATING REPORT AND REVISED MONTHLY OPERATING REPORTS FOR MILLSTONE UNIT NO.2 FOR NOVEMBER AND DECEMBER 2003 Page 2 of 2 Attachments: 4 Commitments made in this letter: None.

cc:

U.S. Nuclear Regulatory Commission Region I 475 Aliendale Road King of PrussiaPA 19406-1415

Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station January 2004 Monthly ODeratinci Report for Millstone Unit 2 Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 02/02/2004 S. Stark (860) 447-1791 4419 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 2

2. Reporting Period:

January 2004

3. Licensed Thermal Power (MWt):

2700.0

4.

Design Electrical Rating (Net MWe):

  • 870.0
5.

Maximum Dependable Capacity (Net MWe) 866.2 15

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 744.0 744.0 158770.3

8.

Hours Generator On-Line 744.0 744.0 152979.8

9.

Unit Reserve Shutdown Hours 0.0 0.0 468.2

10.

Net Electrical Energy Generated (MWH) 659347.7 659347.7 125536923.5

  • The Design Electrical Rating (Net Mwe) value is under review pending post LP Rotor Replacement Testing.

OPERATING

SUMMARY

The unit operated at 100% for the month of January.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 02/02/2004 S. Stark (860) 447-1791 4419 REPORTING MONTH:

January 2004 NO.

DATE TYPE' DURATION R E 2

METhOD OF SIIUrING CAUSE I CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR 

COMMENTS There were no unit shutdowns during the month of January 2004.

2 3

F:

Forced Reason:

Method:

5:

Scheduled A - Equipment Failure (Explain) 1 - M anual B - Maintenance or Test 2 - Manual Trip C - R efueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

P - Admi nistrative 0 - Operational Error (Explain)

H - Other (Explain)

January 2004 Monthly Operating Report for Millstone Unit 3 Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 02/01/2004 K. Cook (860) 447-1791 6572 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 3

2.

Reporting Period:

JANUARY 2004

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1153.6

5. Maximum Dependable Capacity (Net MWe) 1130.5
6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Repo, Give Reasons:

This Month Year-to-Date Cumulative

7. Number of Hours Reactor Was Critical 744 744.0 111848.7



Hours Generator On-Line 744 744.0 110119.1

9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 859085.1 859085.1 120706289.4

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50.423 Millstone 3 02/01/04 K. Cook (860) 447-1791 6572 REPORTING MONTH:

JANUARY 2004 NO.

DATE TYPE' DURATION REASON 2 METhOD OF SHUTFING CAUSEI CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR 

COMMENTS There were no unit shutdowns in January 2004.

2 3

F:

Forced Reason:

Method:

5:

Scheduled A Equipment Failure (Explain)

I - Manual 13

- Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatoiy Restriction 4 Continued from previous month E -Operator Training I License Examination 5-Other (Explain)

F - Administrative G - Operational Error (Explain)

H -Other (Explain)

Revised November 2003 Monthly Operating Report for Millstone Unit 2 Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 1/22/2004 Revised S. Stark (860) 447-1791 4419 OPERATING STATUS

1. UnitName:

Millstone Unit No.2

2. Reporting Period:

November 2003

3.

Licensed Thermal Power (MWt):

2700.0

4.

Design Electrical Rating (Net MWe):

870.0

5. Maximum Dependable Capacity (Net MWe) 866.215
6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 90.4 6433.1 157282.3

8. Hours Generator On-Line 12.1 6339.4 151491.8
9.

Unit Reserve Shutdown Hours 0.0 0.0 468.2

10.

Net Electrical Energy Generated (MXVII) 360.0 5477296.7 124243415.8 OPERATING

SUMMARY

The unit continued with Refueling Outage 15, which had begun on October 11, 2003. The reactor was achieved criticality at 0400 on November 26,2003. Low power physics testing was performed and the unit was placed on-line at 2219 on November 26,2003. The generator was taken off-line at 0335 on November 27, 2003 for main turbine overspeed testing and was reconnected to the grid at 0446. The reactor was manually tripped at 0617 on November 27, 2003 from approximately 25% power in response to high turbine vibrations. The reactor was restarted at 1521 on November 27, 2003. The generator was connected to the grid at 2209 on November 27, 2003 and was taken off-line at 2240 due to high turbine vibrations. The generator was connected to the grid at 0937 on November 28, 2003 and was taken off-line at 1051 due to high turbine vibrations. The reactor was manually tripped at 2205 on November 28, 2003 from approximately 11% power in response to high turbine vibrations during turbine startup. The reactor was restarted at 1436 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.46398e-4 months <br /> on November 29, 2003. The generator was connected to the grid at 0235 on November 30, 2003 and was taken off-line at 0336 due to high turbine vibrations.

The generator was connected to the grid at 1157 on November 30, 2003 and was taken off-line at 1338 due to high turbine vibrations. The generator was connected to the grid at 2309 on November 30, 2003.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-3 3 6 Millstone 2 12/04/2003 S. Stark (860) 447-1791 4419 REPORTING MONTH: November 2003 NO.

DATE TYPE' DURATION REASON 2 METHOD OFSJIUTTING CAUSE/CORRECTJVEACTIONS (HOURS)

DOWN REACTOR 

COMMENTS 03-02 10/I 112003 S

622.3 C

4 Continuation of refucling outage from previous month 03-03 1112712003 S

1.2 B

Main turbine ovcrspccd test. Reactor remained critical.

03-04 11/27/2003 F

15.9 H

2 Manual reactor and turbine trip from 25% powcr due to vibration of main turbine.

03.05 11/27/2003 F

10.9 H

Main turbinc.gcncrator trip due to vibration of main turbine. Reactor remained critical 03-06 11/28/2003 F

39.7 H

5.2 Main turbine-gencrator trip due to vibration of main turbine. Reactor remained critical, but was later manually tripped during startup of main turbine.

03-07 11/30/2003 F

84 II Main turbine-generator trip due to vibration of main turbine. Reactor remained critical 03-08 11/30/2003 F

9.5 It Main turbine-generator trip due to vibration of main turbine. Reactor remained critical I

2 3

F:

Forced Reason:

Method:

S:

Scheduled A-Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D. Regulatory Restriction 4-Continued from previous month E - Operator Training / Liccnse Examination S - Other (Explain)

F-Administrative G - Operational Error (Explain) 11-Other (Explain)

Revised December 2003 Monthly ODeratinci Report for Millstone Unit 2 Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 01/22/2004 Revised S. Stark (860) 447-1791 4419 OPERATING STATUS

1. Unit Name:

Millstone Unit No.2

2.

Reporting Period:

December 2003

3.

Licensed Thermal Power (MWt):

2700.0

4.

Design Electrical Rating (Net MWe):

  • 870.0
5. Maximum Dependable Capacity (Net MWe) 866.215
6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 744.0 7177.1 158026.3

8. Hours Generator On-Line 744.0 7083.4 152235.8
9.

Unit Reserve Shutdown Hours 0.0 0.0 468.2

10. Net Electrical Energy Generated (MWH) 634159.9 6111456.7 124877575.8
  • The Design Electrical Rating (Net Mwe) value is under review pending post LP Rotor Replacement Testing.

OPERATING

SUMMARY

The unit continued power ascension from the previous months refueling outage. The unit reached 100% power on December 7' and continued to run at or near 100% power for the rest of the month.

UNIT SHUTDOWNS V

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 01/05/2004 S.

Stark (860) 447-1791 4419 REPORTING MONTH:

December 2003 NO.

DATE TYPE' DURATION REASON 2 METHOD OF SIIUTHNG CAUSE I CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR' COMMENTS There were no unit shutdowns during the month of December 2003.

2 1

F:

Forced Reason:

Method:

5:

Scheduled A - Equipment Failure (Explain) 1 - M anual B - Maintenance or Test 2 - Manual Trip C - R efueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training I License Examination 5 - Other (Explain)

F - Admi nistrative G - Operational Error (Explain)

H - Other (Explain)