Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Informs of Intent to Use ASME Code Case N-426". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20095D242  + (Informs of Intent to Use Alternative Shutdown Method Described in 10CFR50,App R,Section Iii.L as Primary Basis for Satisfying Requirements on Fire Protection for Control Ctr Complex.Review & Approval Requested)
  • L-88-327, Informs of Intent to Use C-E Methodology Described in Rept CEN-373-P, Realistic Small Break LOCA Evaluation Model. Methodology Employed Designed for Use W/Proposed Rev to 10CFR50,App K, ECCS Evaluation Models  + (Informs of Intent to Use C-E Methodology Described in Rept CEN-373-P, Realistic Small Break LOCA Evaluation Model. Methodology Employed Designed for Use W/Proposed Rev to 10CFR50,App K, ECCS Evaluation Models)
  • ML20214S486  + (Informs of Intent to Use NRC-approved Transportation Casks Listed in Encl to Transport Licensed Matl)
  • ML20095B881  + (Informs of Intent to Use Tip Diffraction Sizing Techniques for Evaluation of Flaws Detected During Ultrasonic Exam of Reactor Pressure Vessel Welds)
  • ML20215E570  + (Informs of Intent to Utilize Return Flowpath Described in 870429 Technical Evaluation Rept in Support of Proposed Mod to Fuel Transfer/Spent Fuel Pool Cleanup Sys Portion of Defueling Water Cleanup Sys)
  • ML20093H146  + (Informs of Intention Not to File Motion to Compel Per Listed TMI Alert Responses to Request for Documents Re Dieckamp Mailgram Issue.Related Correspondence)
  • ML19345D010  + (Informs of Intention of Making Licensing Determination for Continued Operation of Uravan by 801231.Suggests 801119-21 Meeting W/Nrc to Resolve Remaining Relicensing Issues)
  • ML20210P773  + (Informs of Intention of Placing Oyster Creek PRA Model on Docket & in PDR 30 Days from Today)
  • ML20149H434  + (Informs of Intention of Placing PRA Model on Docket & in PDR within 30 Days)
  • ML20149E720  + (Informs of Intention of Placing Plant PRA Model on Docket & in PDR 30 Days from Date of Ltr.If Claim Contains Proprietary Info,Affidavit as Required by 10CFR2.790 Should Be Submitted within 30 Days)
  • ML20141H813  + (Informs of Intention of Placing San Onofre Probabilistic Risk Assessment Model on Docket & in Public Document Room 30 Days from Date of Ltr.If PRA Model Contains Proprietary Info,Submit Affidavit as Required by 10CFR2.790)
  • ML19325D206  + (Informs of Intention to Cancel Application for Export Licenses XB-1257,XB-1258,XB-1259,XB-1260,XB-1261,XB-1262, XB-1263,XB-1264,XB-1265 & XB-1266)
  • ML20085H383  + (Informs of Intention to Change Chairmanship of Nuclear Review Board from Full Time to Part Time Position.Concludes That Changes Does Not Represent Unreviewed Safety Question)
  • ML17264A834  + (Informs of Intention to Change Reactor Coolant Pump Flywheel Insp Interval from Current 3-yr Interval to 10-yr Interval, Consistent w/WCAP-14535A)
  • ML18058B051  + (Informs of Intention to Change Two Commitments Conveyed in Util 890103 Response to GL 88-17, Loss of DHR, in Ref to Frequency of Operator Training on Subjs of Reduced Inventory Operations & Emergency Equipment Hatch Closure)
  • ML20138F581  + (Informs of Intention to Commit to Rev 2 to Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants During Current Refueling Outage.Training on Welding Implementation for QC Inspector in Progress)
  • ML20113A233  + (Informs of Intention to Complete Environ Qualification of Electrical Equipment Important to Safety by 851130,in Accordance w/10CFR50.49.If Environ Qualification Incomplete by 851130,shutdown Planned)
  • ST-HL-AE-5531, Informs of Intention to Comply W/Requirements That Apply to Protection of Info Collected Re FFD & Access Authorization Rules,In Response to  + (Informs of Intention to Comply W/Requirements That Apply to Protection of Info Collected Re FFD & Access Authorization Rules,In Response to)
  • ML20133B117  + (Informs of Intention to Defer Submittal of Final IPEEE Rept Until 970228)
  • ML20056D993  + (Informs of Intention to Devote Time Reviewing Comments in Near Future to Be Sure Intent Clear Prior to Forwarding Final Written Response)
  • ST-HL-AE-2269, Informs of Intention to Disable Transfer Switch So That 13.8-kV Switchgear Will Be Connected to Normal 125 Volt Dc Control Power Source.Corrective Action Will Be Implemented by First Refueling Outage  + (Informs of Intention to Disable Transfer Switch So That 13.8-kV Switchgear Will Be Connected to Normal 125 Volt Dc Control Power Source.Corrective Action Will Be Implemented by First Refueling Outage)
  • ML20138K975  + (Informs of Intention to Disclose Confidential Info to Ez Kezelis,Rj Lauer,Ga Kruse,Lm Woolworth,Mj Payne,Se Babb & LO Delgeorge,Per 851206 Protective Order.Affidavits of Nondisclosure Encl.W/O Encl.Related Correspondence)
  • ML20054G508  + (Informs of Intention to Dismantle full-scale Test Facility by End of June 1982.Notification Requested by 820621 If Dismantling Believed to Be Inappropriate.Release of Suppl 1 to NUREG-0661 Prior to Above Date Would Be Helpful)
  • ML20059J641  + (Informs of Intention to Exercise Discretion Not to Enforce Compliance W/Requirements of TS 3.1.1.3 for Period from 940116 & Not to Exceed 940123)
  • ML20044F926  + (Informs of Intention to Exercise Discretion for Period from 930517 Until 930521,not to Enforce Compliance W/Required Actions of TS LCO 3.5.B.9)