Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063K845 + (Informs of Intent to Reduce Position Verification Procedure on Locked,Manual Valves in ECCS from Daily to Monthly.Daily Verification Program Implemented in Response to IE Bulletin 79-08,Item 6)
- ML20029C909 + (Informs of Intent to Relinquish License & Requests That FY93 Annual Fees Be Waived)
- ML20137R688 + (Informs of Intent to Remove Engelhard Site from Sdmp Now That NRC No Longer Has Regulatory Jurisdiction Over Radioactive Matl Being Managed at Plainville Site)
- ML20203M973 + (Informs of Intent to Request Addl Info &/Or Clarification Re Application for License,Including Name & Qualifications of Assistant Radiation Safety Officer If Different than Ej Olgivie & Training Program for Lab Technicians)
- ML20137R094 + (Informs of Intent to Request Addl Info from Nuclear Assurance Corp Re Financial Condition for Approval of Purchase of NFS & Renewal of License SNM-986 for 5 Yrs for Research & Teaching Purposes)
- ML20204J477 + (Informs of Intent to Request Amends to Licenses NPF-4 & NPF-7 to Permit Redesign of Reactor Coolant Pump & Steam Generator Supports Per Requirements of GDC 4.Scope & Justification for Pending Request Encl)
- ML20238C280 + (Informs of Intent to Respond to 870127 Request for Info Re Criterion 3 of Sequoyah Restart Criteria by 870401.Ofc of Special Projects in Process of Becoming Familiar W/History & Status of Issues at TVA)
- NPL-98-0903, Informs of Intent to Respond to 980902 RAI Re GL 97-01, Degradation of Crdm/Cedm & Other Vessel Closure Head Penetrations, by 990115 + (Informs of Intent to Respond to 980902 RAI Re GL 97-01, Degradation of Crdm/Cedm & Other Vessel Closure Head Penetrations, by 990115)
- ML20151U030 + (Informs of Intent to Respond to Assertions in Ocre Re Summary of 851218 Meeting Between NRC & Hydrogen Control Owners Group.Motion to Reopen Has Not Been Filed by Ocre.Svc List Encl.Related Correspondence)
- ML20094A020 + (Informs of Intent to Respond to Govt Accountability Project 840926 & 1026 Comments Re NRC Staff Technical Review Team Findings)
- AECM-84-0182, Informs of Intent to Restart Plant on or Before 840326 to Regenerate Units Installed in-core Startup Neutron Sources. Util Believes Immediate Restart & Operation of Plant at Power Levels of Less than 5% Core Thermal Power Is Safe + (Informs of Intent to Restart Plant on or Before 840326 to Regenerate Units Installed in-core Startup Neutron Sources. Util Believes Immediate Restart & Operation of Plant at Power Levels of Less than 5% Core Thermal Power Is Safe)
- ML20151Y956 + (Informs of Intent to Staff Fire Brigade W/Personnel from New Onsite Fire Emergency Response Organization,Effective on 880429.Encl 1 Provides Overview of Plan for Incorporating Onsite Fire Emergency Response Organization Into Brigade)
- L-83-127, Informs of Intent to Submit Assessment of Operability of Large Pratt Purge & Vent Valves by 830331,per NRC 830216 Request + (Informs of Intent to Submit Assessment of Operability of Large Pratt Purge & Vent Valves by 830331,per NRC 830216 Request)
- ML20141B172 + (Informs of Intent to Submit Encl Paper, Cooling of Igneous Dike Twenty Yrs After Intrusion, for Publication in Geology)
- FVY-83-118, Informs of Intent to Submit Final Radiological ETS No Later than 831216 & Final Offsite Dose Calculation Manual No Later than 840116 + (Informs of Intent to Submit Final Radiological ETS No Later than 831216 & Final Offsite Dose Calculation Manual No Later than 840116)
- ML20149F003 + (Informs of Intent to Submit Formal Rept Re Vibration Surveillance Program for Tdi Diesel Generators.Actions to Be Taken in Future to Monitor Diesels for Vibration Listed)
- ML20058K552 + (Informs of Intent to Submit Rept Re ATWS by 741001)
- 3F0597-22, Informs of Intent to Submit Response to Requested Info in GL 97-01 within 120 Days of Issue Date of Gl.Util Will Participate W/Other B&W Reactor Owners to Develop Integrated CRD Mechanism Nozzle Insp Program for Application at Plant + (Informs of Intent to Submit Response to Requested Info in GL 97-01 within 120 Days of Issue Date of Gl.Util Will Participate W/Other B&W Reactor Owners to Develop Integrated CRD Mechanism Nozzle Insp Program for Application at Plant)
- ML20078L379 + (Informs of Intent to Submit Revised Proposed Change to Address Issue of Improved TS for Diesel Fuel Oil at Later Date)
- PY-CEI-NRR-0021, Informs of Intent to Submit Updated Description of Corporate Nuclear QA Program Used for Design & Const of Plants,In Response to .Info Will Be Incorporated Into FSAR Chapter 17.1 + (Informs of Intent to Submit Updated Description of Corporate Nuclear QA Program Used for Design & Const of Plants,In Response to .Info Will Be Incorporated Into FSAR Chapter 17.1)
- ML20081K618 + (Informs of Intent to Testify Re Contentions V-3a & 3b)
- ML20199K935 + (Informs of Intent to Transfer Author as End User on Current General License to Colleague at Thomas J Lipton Co Re Ni-63 Electron Capture Detector,Model HP19233,serial L6574)
- ML20058E364 + (Informs of Intent to Uncouple All Control Rod Drive Mechanism Leadscrews Following Quick Look Project,Utilizing Procedures Per Tech Spec 6.8.2)
- ML20058D044 + (Informs of Intent to Uncouple All Control Rod Drive Mechanism Leadscrews Immediately Following Quick Look Project.Proposed Activities Will Cover Period of Approx 3-4 Wks.Previous Safety Evaluations Re Subj Acceptable)
- ML19345C823 + (Informs of Intent to Use ASME Code Case N-275, Repair of Welds,Section Iii,Div 1, Approved 800515,for Utilization of Alternate Rules for Examination Prepared for Repair of Welds.Requests Acknowledgement of Acceptability)
- L-91-166, Informs of Intent to Use ASME Code Case N-426 + (Informs of Intent to Use ASME Code Case N-426)
- ML20095D242 + (Informs of Intent to Use Alternative Shutdown Method Described in 10CFR50,App R,Section Iii.L as Primary Basis for Satisfying Requirements on Fire Protection for Control Ctr Complex.Review & Approval Requested)
- L-88-327, Informs of Intent to Use C-E Methodology Described in Rept CEN-373-P, Realistic Small Break LOCA Evaluation Model. Methodology Employed Designed for Use W/Proposed Rev to 10CFR50,App K, ECCS Evaluation Models + (Informs of Intent to Use C-E Methodology Described in Rept CEN-373-P, Realistic Small Break LOCA Evaluation Model. Methodology Employed Designed for Use W/Proposed Rev to 10CFR50,App K, ECCS Evaluation Models)
- ML20214S486 + (Informs of Intent to Use NRC-approved Transportation Casks Listed in Encl to Transport Licensed Matl)
- ML20095B881 + (Informs of Intent to Use Tip Diffraction Sizing Techniques for Evaluation of Flaws Detected During Ultrasonic Exam of Reactor Pressure Vessel Welds)
- ML20215E570 + (Informs of Intent to Utilize Return Flowpath Described in 870429 Technical Evaluation Rept in Support of Proposed Mod to Fuel Transfer/Spent Fuel Pool Cleanup Sys Portion of Defueling Water Cleanup Sys)
- ML20093H146 + (Informs of Intention Not to File Motion to Compel Per Listed TMI Alert Responses to Request for Documents Re Dieckamp Mailgram Issue.Related Correspondence)
- ML19345D010 + (Informs of Intention of Making Licensing Determination for Continued Operation of Uravan by 801231.Suggests 801119-21 Meeting W/Nrc to Resolve Remaining Relicensing Issues)
- ML20210P773 + (Informs of Intention of Placing Oyster Creek PRA Model on Docket & in PDR 30 Days from Today)
- ML20149H434 + (Informs of Intention of Placing PRA Model on Docket & in PDR within 30 Days)
- ML20149E720 + (Informs of Intention of Placing Plant PRA Model on Docket & in PDR 30 Days from Date of Ltr.If Claim Contains Proprietary Info,Affidavit as Required by 10CFR2.790 Should Be Submitted within 30 Days)
- ML20141H813 + (Informs of Intention of Placing San Onofre Probabilistic Risk Assessment Model on Docket & in Public Document Room 30 Days from Date of Ltr.If PRA Model Contains Proprietary Info,Submit Affidavit as Required by 10CFR2.790)
- ML19325D206 + (Informs of Intention to Cancel Application for Export Licenses XB-1257,XB-1258,XB-1259,XB-1260,XB-1261,XB-1262, XB-1263,XB-1264,XB-1265 & XB-1266)
- ML20085H383 + (Informs of Intention to Change Chairmanship of Nuclear Review Board from Full Time to Part Time Position.Concludes That Changes Does Not Represent Unreviewed Safety Question)
- ML17264A834 + (Informs of Intention to Change Reactor Coolant Pump Flywheel Insp Interval from Current 3-yr Interval to 10-yr Interval, Consistent w/WCAP-14535A)
- ML18058B051 + (Informs of Intention to Change Two Commitments Conveyed in Util 890103 Response to GL 88-17, Loss of DHR, in Ref to Frequency of Operator Training on Subjs of Reduced Inventory Operations & Emergency Equipment Hatch Closure)
- ML20138F581 + (Informs of Intention to Commit to Rev 2 to Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants During Current Refueling Outage.Training on Welding Implementation for QC Inspector in Progress)
- ML20113A233 + (Informs of Intention to Complete Environ Qualification of Electrical Equipment Important to Safety by 851130,in Accordance w/10CFR50.49.If Environ Qualification Incomplete by 851130,shutdown Planned)
- ST-HL-AE-5531, Informs of Intention to Comply W/Requirements That Apply to Protection of Info Collected Re FFD & Access Authorization Rules,In Response to + (Informs of Intention to Comply W/Requirements That Apply to Protection of Info Collected Re FFD & Access Authorization Rules,In Response to)
- ML20133B117 + (Informs of Intention to Defer Submittal of Final IPEEE Rept Until 970228)
- ML20056D993 + (Informs of Intention to Devote Time Reviewing Comments in Near Future to Be Sure Intent Clear Prior to Forwarding Final Written Response)
- ST-HL-AE-2269, Informs of Intention to Disable Transfer Switch So That 13.8-kV Switchgear Will Be Connected to Normal 125 Volt Dc Control Power Source.Corrective Action Will Be Implemented by First Refueling Outage + (Informs of Intention to Disable Transfer Switch So That 13.8-kV Switchgear Will Be Connected to Normal 125 Volt Dc Control Power Source.Corrective Action Will Be Implemented by First Refueling Outage)
- ML20138K975 + (Informs of Intention to Disclose Confidential Info to Ez Kezelis,Rj Lauer,Ga Kruse,Lm Woolworth,Mj Payne,Se Babb & LO Delgeorge,Per 851206 Protective Order.Affidavits of Nondisclosure Encl.W/O Encl.Related Correspondence)
- ML20054G508 + (Informs of Intention to Dismantle full-scale Test Facility by End of June 1982.Notification Requested by 820621 If Dismantling Believed to Be Inappropriate.Release of Suppl 1 to NUREG-0661 Prior to Above Date Would Be Helpful)
- ML20059J641 + (Informs of Intention to Exercise Discretion Not to Enforce Compliance W/Requirements of TS 3.1.1.3 for Period from 940116 & Not to Exceed 940123)
- ML20044F926 + (Informs of Intention to Exercise Discretion for Period from 930517 Until 930521,not to Enforce Compliance W/Required Actions of TS LCO 3.5.B.9)