Informs of Intention to Commit to Rev 2 to Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants During Current Refueling Outage.Training on Welding Implementation for QC Inspector in Progress
ML20138F581
Person / Time
Site: Brunswick  
Issue date: 12/10/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
NLS-85-441, NUDOCS 8512160126
Download: ML20138F581 (1)


Text

g-Cp&L Carolina Power & Light Company SERIAL: NLS-85-441 DEC 101985 Director'of Nuclear Reactor Regulation Attentic:::

Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 -

' Division of Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 VISUAL WELD ACCEPTANCE CRITERIA FOR STRUCTURAL WELDS

Dear Mr. Vassallo:

This letter is to inform you of Carolina Power & Light Company's (CP&L) intention to commit to the " Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants"(VWAC) Revision 2 for the Brunswick Steam Electric Plant (BSEP). The Company intends to implement use of VWAC during the current BSEP-2 refueling outage.

The Nuclear Construction Issues Group prepared VWAC to resolve concerns associated with applying American Welding Society Standard D.l.1 acceptance criteria for inspections of welds in certain supports and structures. Nuclear Regulatory Commission approval of VWAC, Revision 2 was documented by Mr. James P. Knight's letter to Mr. Douglas E. Dutton dated June 26,1985. Brunswick will implement VWAC through appropriate BSEP specifications which take no significant exceptions to VWAC, Revision 2.' Changes to VWAC were made for clarification and specific applicability to the Brunswick facility.

Training on the implementation of VWAC, Revision 2 is currently being provided to

-Qualit.y Control (QC) inspectors at the Brunswick plant..The training of the first group of QC inspectors is expected to be completed by December 13, l986. The NRC regional site inspectors have been provided opportunities to review the training.

- As stated above, the Company intends to implement use of VWAC, Revision 2 during the current BSEP-2 outage. The necessary changes to the Final Safety Analysis Report will be incorporated into the next scheduled revision.

Please refer any questions regarding this request to Mr. S. D. Floyd at (919) 836-6901.

Yours very truly, 8512160126 851210g4

. R.

ir merman

- DR ADOCK 05 iager Nuclear Licensing Section SRZ/RWS/ccc (3099RWS)