ML20141H813
| ML20141H813 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/30/1997 |
| From: | Fields M NRC (Affiliation Not Assigned) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| References | |
| NUDOCS 9708010191 | |
| Download: ML20141H813 (2) | |
Text
..
_ _ _ _ _. _. _ _ _.__.. _ _ _ _ ~
d July 30,1997 Mr. Harold B. Ray Executive Vice President Southern California Edison Company i
San Onofre Nuclear Generating Station l
i P. O. Box 128
}-
San Clemente, California 92674-0128 -
)
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION PROBABILISTIC RISK ASSESSM MODEL 1-i
Dear Mr. Ray:
i i
This letter is in regard to the plant-specific probabilistic risk assessment
)
(PM) model developed for the San Onofre Nuclear Generating Station, Units 2 and*3, that you have provided to the NRC and which has been included in the NRC's " library" of PM models that are developed using the " Systems Analysis j
Programs for Hands-on Integrated Reliability Evaluations" (SAPHIRE) code.
i 1
This letter is to inform you of our intention of placing the San Onofre PRA model on the docket and in the public document room 30 days from the date of
{
this letter.
If you claim that your PRA model contains proprietary information, please submit an affidavit as required by 10 CFR 2.790 within L
this 30 day interval. We will review your proposed claim and inform you of i
our acceptance or rejection of your claim. Please contact me at (301) 415-3062 if you have any questions.on ~ this subject.
4 Sincerely, Original Signed By
)
Mel B. Fields, Project Manager
?
Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
-Docket Nos. 50-361 DISTRIBUTION:
I and 50-362
'DocketiFile#
ACRS, TWFN PUBLIC OGC, 015B18 h
cc: See next page PDIV-2 Reading KPerkins,'RIV/WCF0 JRoe EPeyton 3 x EAdensam TGwynn, RIV/WCF0 k(V WBateman DOCUMENT NAME:
SAPHIRE.LTR OFC PDIV-2/PM PDIV-2/LA NAME MFids EPeyI.k DATE 7////97 7/10/97 0FFICIAL RECORD COPY 9708010191 970730 PDR ADOCK 05000361 g
[ hhh h P
PDR it
~. -
i t
i j {
Mr. Harold B. Ray July 30,1997
~
cc:
Mr. R. W. Krieger, Vice President Resident Inspector / San Onofre NPS Southern California Edison Company c/o U.S. Nuclear Regulatory Commission San Onofre Nuclear Generating Station Post Office Box 4329 P. O. Box 128 San Clemente, California 92674 I
San Clemente, California 92674-0128 Mayor Chairman, Board of Supervisors City of San Clemente County of San Diego 100 Avenida Presidio 1600 Pacific Highway, Room 335 San Clemente, California 92672 San Diego, California 92101 i
Mr. Dwight E. Nunn, Vice President i
Alan R. Watts, Esq.
Southern California Edison Company g
Woodruff, Spradlin & Smart San Onofre Nuclear Generating Station i
701 S. Parker St. No. 7000 P.O. Box 128 j
Orange, California 92668-4702 San Clemente, C:lifornia 92674-0128 Mr. Sherwin Harris 1
Resource Project Manager i
Public Utilities Department City of Riverside 3900 Main Street 4'
Riverside, California 92522 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management California Department of Health Services P. O. Box 942732 Sacramento, California 94234-7320 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064' Mr. Terry Winter Manager, Power Operations San Diego Gas & Electric Company P.O. Box 1831 San Diego, California 92112-4150 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94234
., _