Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137C590 + (Forwards STP Unit 2 Cycle 6 Colr.)
- ML20151Q789 + (Forwards STP.1154, Remote Shutdown Panel Test, Casualty Procedure OP-C.13A, Remote Shutdown, Comparison of Subj Procedures & Evaluation of Appropriateness of Casualty Procedure OP-C.13A Steps to Secure Reactor Coolant Pumps)
- ML20138G527 + (Forwards STS Change Review Re Relocation of Resistance Temp Detector & Thermocouple Calibr Details)
- ML20024G358 + (Forwards STS Re Administrative Controls. W/O Encl)
- ML20141F613 + (Forwards STS Re Mark III Hydrogen Ignition Sys.Detailed Justification Encl.Hydrogen Control Owners Group Members May Ref Ltr as Being Applicable to Specific Plants)
- ML20141F617 + (Forwards STS Re Mark III Hydrogen Ignition Sys.Detailed Justification Encl.Hydrogen Control Owners Group Members May Ref Ltr as Being Applicable to Specific Plants)
- ML20006A029 + (Forwards STS Sections 3.1,3.2 & 3.4.First Drafts of Sections 2.0 & 3.5 on ECCS & Two Guidance Documents for Developing New STS Bases Also Encl)
- ML20140B254 + (Forwards SV Heisler 841128 Comments on Draft Generic Technical Position Re in Situ Testing During Site Characterization for High Level Nuclear Waste Repositories)
- B14414, Forwards SW & ESW Sys Insp/Replacement Strategy for Unit 1. Mod to Sys Based on Ongoing Monitoring of Sys Parameters or Visual & Ultrasonic Insp of Components + (Forwards SW & ESW Sys Insp/Replacement Strategy for Unit 1. Mod to Sys Based on Ongoing Monitoring of Sys Parameters or Visual & Ultrasonic Insp of Components)
- ML19312C291 + (Forwards SW Jensch Re Facility.W/O Encl)
- ML17339A398 + (Forwards SW Meyerson Re Problems at Plant. Requests Comment)
- ML20046A197 + (Forwards SW Operation Performance Insp (Swopi) Proposed Milestone Schedule,Swopi Organization & Conceptual Functional Descriptions of Areas to Be Assessed During Insp of SW Sys,Per NRC Temporary Instructions 2515/118)
- ML20100G325 + (Forwards SW Shields to HR Denton Re Surrendering CPPR-170 & CPPR-171 & Summarizing Util Plan to Stabilize Site & Motion to Terminate Proceeding)
- ML20137T715 + (Forwards SW Speck 851008 Ltr Providing FEMA 44CFR350 Finding & Determination on Adequacy of Offsite Plans & Preparedness for Facility.State of La & Local Plans & Preparedness Adequate to Protect Public)
- ML20138P033 + (Forwards SW Speck 851008 Memo Transmitting Results of FEMA Regional Assistance Committee Review of Rev 5 to Offsite Transition Plan & RW Krimm 851024 Memo Containing Correction to Page 49 of Evaluation.Six Inadequacies Remain in Rev 5)
- ML20206J302 + (Forwards SW Speck Re State of DE & Local Emergency Plans,For Transmittal to Licensee)
- 3F0295-08, Forwards SWS Operational Performance Assessment Rept, Performed at Plant 941003-1110.Concludes Operation of SWS Found to Be Satisfactory W/Four Areas Identified as Requiring Addl Mgt Attention + (Forwards SWS Operational Performance Assessment Rept, Performed at Plant 941003-1110.Concludes Operation of SWS Found to Be Satisfactory W/Four Areas Identified as Requiring Addl Mgt Attention)
- ML18038B335 + (Forwards SWS Operational Performance Insp (Swsopi) Browns Ferry Nuclear Plant. TVA Plans to Meet W/Nrc Region II to Discuss Encl Rept & to Provide NRC W/Status of Corrective Actions for Weaknesses Noted in Swsopi self-assessment Rept)
- ML18038B336 + (Forwards SWS Operational Performance Insp (Swsopi) Browns Ferry Nuclear Plant. TVA Plans to Meet W/Nrc Region II to Discuss Encl Rept & to Provide NRC W/Status of Corrective Actions for Weaknesses Noted in Swsopi self-assessment Rept)
- ML17179A941 + (Forwards SWS Operational Performance Insp Repts 50-237/93-08 & 50-249/93-08 on 930329-0430 & Notice of Violation)
- ML20057E479 + (Forwards SWS Operational Performance Insp Repts 50-348/93-13 & 50-364/93-13 on 930816-0903,per GL 89-13 & Notice of Violation)
- ML20043D057 + (Forwards Sabotage Hardening Evaluation & Response,Per Meeting Re Reactor Sabotage Study.Encl Withheld)
- ML20036B677 + (Forwards Sacramento Municipal Util District 1992 Annual Rept,For Info.W/Svc List)
- ML18086A929 + (Forwards Safe Shutdown & Interaction Analyses, Reflecting Util Approach to Safe Shutdown & Interaction Analyses, Response to Info Requests & Program Changes Per NRC Fire Protection Review.Rept Supersedes 810717 Interim Rept)
- ML17249A378 + (Forwards Safe Shutdown - Fire Study)
- ML17249A379 + (Forwards Safe Shutdown - Fire Study.)
- ML18018B669 + (Forwards Safe Shutdown Analysis Summary,Per 840511 Meeting Request for Addl Info.Info Details Fire Area,Safe Shutdown Analysis Area,Fire Zones & Plant Location)
- ML17320A457 + (Forwards Safe Shutdown Capability Assessment & Proposed Mods,10CFR50,App R Section III G,Units 1 & Ii,Dc Cook Nuclear Plant, Per .Request for Approval of Alternative Shutdown Sys Encl)
- ML17320A458 + (Forwards Safe Shutdown Capability Assessment & Proposed Mods,10CFR50,App R Section III G,Units 1 & Ii,Dc Cook Nuclear Plant, Per 820719 Ltr.Request for Approval of Alternative Shutdown Sys Encl)
- ML14190A535 + (Forwards Safe Shutdown Capability Position Paper Specifying Info Necessary to Complete Review of Safety Evaluation Supporting Amend 31 to License DPR-23)
- JPN-92-064, Forwards Safe Shutdown Capability Reassessment,10CFR50 App R, in Ref to Util Re Fire Protection Improvement Program & NRC Re Insp Rept 50-333/92-80 on Fire Protection + (Forwards Safe Shutdown Capability Reassessment,10CFR50 App R, in Ref to Util Re Fire Protection Improvement Program & NRC Re Insp Rept 50-333/92-80 on Fire Protection)
- ML18102A915 + (Forwards Safe Shutdown Capability Reassessment for Plant Units 1 & 2 & Technical Evaluation Rept)
- ML18101A746 + (Forwards Safe Shutdown Equipment List Rept, Relay Evaluation Rept Volumes 1 & 2, & Seismic Evaluation Rept, for Salem Generating Station Units 1 & 2, in Response to GL 87-02/USI A-46)
- ML18101A747 + (Forwards Safe Shutdown Equipment List Rept, Relay Evaluation Rept Volumes 1 & 2, & Seismic Evaluation Rept, for Salem Generating Station Units 1 & 2, in Response to GL 87-02/USI A-46)
- L-80-174, Forwards Safe Shutdown Evaluations for Auxiliary Bldg Hallway & Cable Spreading Room in Response to NRC 791029 Request for Fire Protection Info.Reactivity Control Sys Assures Safe Subcritical Core Conditions After Reactor Trip + (Forwards Safe Shutdown Evaluations for Auxiliary Bldg Hallway & Cable Spreading Room in Response to NRC 791029 Request for Fire Protection Info.Reactivity Control Sys Assures Safe Subcritical Core Conditions After Reactor Trip)
- ML17258A888 + (Forwards Safe-Shutdown Capability Assessment & Proposed Mods - 10CFR50,App R - Ginna Unit 1, Per Revised NRC Criteria.Review of Fire Protection Items Should Include Integrated Approach)
- ML17258A889 + (Forwards Safe-Shutdown Capability Assessment & Proposed Mods - 10CFR50,App R - Ginna Unit 1, Per Revised NRC Criteria.Review of Fire Protection Items Should Include Integrated Approach)
- ML20248H966 + (Forwards Safeguard Amend SG-2 to License SNM-368,based on Review of 890616 Submittal of FNMCP)
- ML20134Q198 + (Forwards Safeguard Info Re Potential Problem Involving Protected Area Access Control Sys.W/O Encl)
- ML17333A784 + (Forwards Safeguard Info Re Potential Problem Involving Protected Area Access Control Sys.W/O Encl)
- ML20134Q258 + (Forwards Safeguard Info Re Potential Problem Involving the Protected Area Access Control Sys.W/O Encl)
- ML20134P343 + (Forwards Safeguard Info Re Protected Area Access Control at Nuclear Reactor Sites.Encl Being Withheld Due to Sensitive Info Contained within)
- ELV-02851, Forwards Safeguard Info Task Force Final Rept Re Implementing Program to Minimize Future Safeguards + (Forwards Safeguard Info Task Force Final Rept Re Implementing Program to Minimize Future Safeguards)
- ML20246C875 + (Forwards Safeguard Insp Rept 50-255/89-11 on 890410-14 & Notice of Violation.Notice Withheld (Ref 10CFR73.21))
- ML20137J329 + (Forwards Safeguard Insp Repts 50-275/85-44 & 50-323/85-42 on 851217-19 & 860102 & Notice of Violation.Insp Repts & Notice of Violation Withheld (Ref 10CFR2.790))
- ML19332A876 + (Forwards Safeguard Plan for Shipments of Irradiated Test Reactor Fuel.Plan Withheld (Ref 10CFR2.790))
- IR 05000224/1989001 + (Forwards Safeguards & Radiological Protection Insp Rept 50-224/89-01 on 890701 & 06.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)))
- ML19321B087 + (Forwards Safeguards Amend Fee for NRC Review of Physical Security Plan.Requests Reconsideration of Fee.Licensee Submitted Plan in Response to Regulatory Requirement & Was Not Applying to Amend License SNM-21)
- ML20132D154 + (Forwards Safeguards Amend SG-1 to License SNM-368,reflecting Review & Approval by Region I of Revised Fundamental Nuclear Matl Control Plan Pages Submitted on 830823 & 850114.Amend Replaces Matl & Plant Protection Amend MPP-1)
- ML20132D158 + (Forwards Safeguards Amend SG-1 to License SNM-368,reflecting Review & Approval by Region I of Revised Fundamental Nuclear Matl Control Plan Pages Submitted on 830823 & 850114.Amend Replaces Matl & Plant Protection Amend MPP-1)
- ML20237A926 + (Forwards Safeguards Amend SG-1 to License SNM-33 in Response to Jan 1986 Submittal of Revised 10CFR74 Fundamental Nuclear Matl Control Plan)