- ps 8toogfg UNITED STATES
,,[
g NUCLEAR REGULATORY COMMISSION 5
j WASHINGTON, D. C. 20555 June 24,1986 MEMORANDUM FOR: Thomas T. Martin, Director Division of Radiation Safety and Safeguards Region I FROM:
David B. hatthews, Chief Emergency Preparedness Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
SUBJECT:
FORWARDING 0F FEMA CORRESPONDENCE The enclosed letter, as identified below, is fontarded for action as recommended.
Subject of letter dated June 5,1986 for Artificial Island Generating Station (formerly Salem / Hope Creek):
(X) FEMA 44 CFR 350 finding for Delaware state and local plans.
() FEMA evaluation of the alert and notification system.
() FEMA coments concerning the public information brochure.
We recommend that you transmit the enclosed letter to the licensee, c
. 'u Wu David B. Matthews, Chief Emergency Preparedness Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
Enclosure:
Ltr. from S. W. Speck dtd. 6/5/86 CONTACT: Donald J. Perrotti, IE 492-4865
'Ns g(g;;)W@eS M J.p.
b{
Tay1or//?cctit'M
^,-
s' ' A i.' p (
cys:Ste11p n
Roe 4
[
\\ Federal Emergency ManagementAgency*h"
/
Washington, llc. 20472
- f Sniezek S
l Denton
_}f Murley GCunninghan
/
Kerr, SP JuN.t 006 Mr. Victor Stello, Jr.
Executive Director for Operations U. S. Nuclear Regulatory Conmission Washington, D. C.
20555
Dear Mr. Stello:
In accordance with the Federal FeucJency Manacyynent Agency (FDM) rule 44 CFR 350, the State of Iblaware submitted its State and associated local plans for radiological cynergencies related to the Artificial Island Generating Station (foonerly Salen,Aiope Creek) to the Regional Director of FDR Region III for FF2% review and approval. 'Ihe Regional Director conpleted and forwarded his final evaluation of the Delaware State and local plans to me on September 27, 1982, in accordance with section 350.11 of the rule. However, subsequent to the State's original submission, areas requiring action by the D31 aware Departnent of Public Safety were identified and resolved in a January 15, 1986, FDR finding. Included in this evaluation is a revies of exercises conducted April 3,1981, October 13, 1982, October 26,19d3, and October 29, 1985, and a public meetina held on May 27, 1931, which explained the site-specific aspects of the State and local ;31ans.
Based on an overall evaluation, I f tnd and determine that the State and local plans and preparedness for the Artificial Island Generating Station -
are adequate to protect the health and safety of the public in that there is reasonable assurance that the appropriate protective measures can be taken of fsite in the event of a raliological energency. However, while there is a public Alert and Notification (AsN) system in place and opera-tional, this approval is conditional on FDM's verification of the A&N systen in accordance with the criteria of NURErc0654/ FEMA-REP-1, Rev.1, Appendix 3; and the " Guide for the Evaluation of Alert and Notification Systems for Nuclear Power Plants" (Fr}M-RSP-10).
Sincerely, q)c.., a..t t..'.
.9amuel W. Speck Associate Director State and Incal Prograns and Support ges