ML20134P343
| ML20134P343 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 02/20/1997 |
| From: | Kugler A NRC (Affiliation Not Assigned) |
| To: | Gipson D DETROIT EDISON CO. |
| References | |
| NUDOCS 9702250358 | |
| Download: ML20134P343 (3) | |
Text
,
' Mr. Douglas R. Gipson Senior Vice Presid:nt uary 20, 1997 Nuclear G:neration Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
PROTECTED AREA ACCESS CONTROL AT NUCLEAR REACTOR SITES
Dear Mr. Gipson:
The Nuclear Regulatory Commission (NRC) is notifying all nuclear power reactor licensees of a potential problem involving the protected area access control system that may exist at your site. As a result of an unauthorized entry at one of the operating reactor sites, the NRC has determined that this situation may be a generic problem that should be analyzed by all licensees to verify that regulatory requirements are being met.
This letter is to inform you that information is being provided to your plant security manager that could assist in your efforts to protect your plant against the " insider" requirement of the design-basis threat.
This information includes a Safeguards Information enclosure that is being sent only to your site security manager.
The enclosure is being withheld from public disclosure due to the sensitive information that it contains.
It is suggested that the information in the safeguards enclosure be reviewed for applicability to your plant and actions be considered, as appropriate.
Should you have any questions, please contact Barry Manili in the Safeguards Branch, Nuclear' Reactor Regulation at (301) 415-2912.
Sincerely, An'drewJ.Kuglfr,NjeNSaNahr Project Directorate III-l Division of Reactor Projects - III/IV Off. ice of Nuclear Reactor Regulation Docket No. 50-341 cc w/ encl:
Joe Korte Director, Nuclear Security Fermi 2 6400 North Dixie Highway Newport, MI 48166 cc w/out encl:
See next page s(S\\
DISTRIBUTION w/o encl.
\\y Docket. File E. Adensam (EGA1) B. Burgess, RIII PUBLIC ACRS B. Manili J. Roe OGC J. F. Williams 0
1 DOCUMENT NAME: G:\\WPDOCS\\ FERMI \\SFGD.LTR To receive e copy of this document, indicate in the box: *C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy 0FFICE PD31-LA C
PD31-PM l C PD31-D 1/ l C NAME CJamerson:mc pil/ AKugler(Nb JHannon W DATE 02/19/97
/?
02/19/97" 02//Q/97 0F F If.I A l RFfARD CAPV W
9702250358 970220
%dgQ$7 ADOCK0500g1 g
y PDR
kBEECp p
1 UNITED STATES g
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON. D.C. 20666-0001 6
4,,,,,4 February 20, 1997 i
l Mr. Douglas R. Gipson Senior Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
PROTECTED AREA ACCESS CONTROL AT NUCLEAR REACTOR SITES
Dear Mr. Gipson:
j The Nuclear Regulatory Commission (NRC) is notifying all nuclear power reactor licensees of a potential problem involving the protected area access control system that may exist at your site. As a result of an unauthorized entry at one of the operating reactor sites, the NRC has determined that this situation i'
may be a generic problem that should be analyzed by all licensees to verify that regulatory requirements are being met.
This letter is to inform you that information is being provided to your plant security manager that could assist in your efforts to protect your plant against the " insider" requirement of the design-basis threat. This information includes a Safeguards Information enclosure that is being sent only to your site security manager. The enclosure is being withheld from public disclosure due to the sensitive information that it contains.
It is suggested that the information in the safeguards enclosure be reviewed for applicability to your plant and actions be considered, as appropriate.
I Should you have any questions, please contact Barry Manili in the Safeguards Branch, Nuclear Reactor Regulation at (301) 415-2912.
Sincerely, b
Andrew J. Kug er, Project O nager Project Directorate 111-1 Division of Reactor Projects - III/IV t
Office of Nuclear Reactor Regulation Docket No. 50-341 cc w/ encl:
1 Joe Korte Director, Nuclear Security Fermi 2 l
6400 North Dixie Highway
)
Newport, MI 48166 cc w/o encl: See next page
{
C Mr. Douglas R. Gipson Fermi-2 Detroit Edison Company cc:
John Flynn, Esquire Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing, Michigan 48909-8130 j
U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Peter W. Smith Director, Nuclear Licensing Detroit Edison Company Fermi 270 TAC 6400 North Dixie Highway Newport, Michigan 48166
%:m