Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards SECY-79-490". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20062J547  + (Forwards SE of Util 930128 & 0714 Supplemental Responses to IE Bulletin 79-27.Concerns Specified in Bulletin Have Been Adequately Addressed)
  • ML20128C642  + (Forwards SE of Util Application for Ol.W/O Encl)
  • ML20217B355  + (Forwards SE on EPRI & Suppls ,0521, 1021 & 970108 Re TR-105747, BWR Vessel & Intervals Project, Guidelines for Reinspection of BWR Core Shrouds (BWRVIP-07))
  • ML20198L939  + (Forwards SE on Joint OG Program on Periodic Verification of MOV Described in TR MPR-1807,rev 2.Subj Program Serves as Acceptable industry-wide Response to GL 96-05)
  • ML20198L635  + (Forwards SE on Joint Owner Group Program on Periodic Verification of motor-operated Valves Described in TR NEDC-32719,rev 2.Joint OG Program on MOV Periodic Verification Serves as Acceptable Response to GL 96-05)
  • ML20198L559  + (Forwards SE on Joint Owners Group Program on Periodic Verification of Motor Operated Valves.Nrc Considers MOV Periodic Verification Acceptable to GL 96-05.Advise within 30 Day If Any Matl Encl in SE Considered Proprietary)
  • ML18096B100  + (Forwards SE on Licensee Response to Suppl 1 to GL 87-02. Licensee Response Unclear as to Whether Licensee Intends to Implement Both SQUG Commitments & Implementation Guidance)
  • ML20236X518  + (Forwards SE on Resolution of USI A-46 Implementation Program at Plant.Staff Determined That Util C/As & Completed Physical Mods for Resolution of Outliers Will Result in Safety Enhancement Beyond Original Licensing Basis)
  • ML18058A166  + (Forwards SE on Seismic Design Criteria in Response to Insp Rept 50-255/91-202)
  • ML20057D411  + (Forwards SE-93-0088-R00, Grand Gulf Nuclear Station Unit 1 Changes,Tests or Experiments Safety & Environ Evaluation, Per 10CFR50.59 Re Secondary Containment for NRR Info)
  • RC-93-0272, Forwards SECL-93-036, Licensing Submittal to Support SG TS Changes for Vsns, Including Revised TS Pages & Proprietary Westinghouse TRs WCAP-13480 & WCAP-13605.Westinghouse TRs Withheld  + (Forwards SECL-93-036, Licensing Submittal to Support SG TS Changes for Vsns, Including Revised TS Pages & Proprietary Westinghouse TRs WCAP-13480 & WCAP-13605.Westinghouse TRs Withheld)
  • ML19289C763  + (Forwards SECY-73-311 & SECY-78-311A W/Correction Notice. Both Documents Were Inadvertently Omitted from)
  • ML19289C731  + (Forwards SECY-73-311 & SECY-78-311A W/Correction Notice. Both Documents Were Inadvertently Omitted from)
  • ML19322D263  + (Forwards SECY-74-095,SECY-74-132,package of Board Notices Re Davis-Besse,draft of TMI-2 Transfer Package & Final Transfer Package on TMI-2.SECY-74-095 Encl)
  • ML20054K423  + (Forwards SECY-77-355 Re Response to Lv Gossick 770425 Request to Inform Commission of Current Method of Treating Questions of Conservation & Need for Baseload Facility in Power Reactor Applications)
  • ML19263B212  + (Forwards SECY-78-311 & SECY-78-311A Re SAND77-1927,Transportation of Radionuclides in Urban Environs:Work Draft Assessment. Staff Recommends No Immediate Regulatory Action)
  • ML20062D753  + (Forwards SECY-78-554,Policy Session Item, W/ Licensee Regulatory Performance Evaluation. W/O Encl)
  • ML19263A693  + (Forwards SECY-78-607 Re Extension of Indemnity Coverage for Oconee Spent Fuel at McGuire Facility)
  • ML19224A638  + (Forwards SECY-78-99 Re Amend to Table S-3 of 10CFR51.W/o Encl)
  • ML19276G643  + (Forwards SECY-79-160A for Placement in PDR)
  • ML19247B063  + (Forwards SECY-79-278 & SECY-79-278A Re Physical Protection of Irradiated Fuel Shipments.W/O Encl)
  • ML20125A680  + (Forwards SECY-79-278 & SECY-79-278A Re Physical Protection of Irradiated Fuel Shipments.Nrc Approved Implementation of Interim Final Rule Imposing Requirements for Protection of Fuel in Transit 790507)
  • ML19246B291  + (Forwards SECY-79-278A & SECY-79-278 ,in Response to RP Wilson Telcon.W/O Encl)
  • ML19242B571  + (Forwards SECY-79-364 Re Application of Mitsubishi Intl Corp to Export U-235 to Japan)
  • ML19241B708  + (Forwards SECY-79-368 Re Transnuclear,Inc Application for Export License to Transport Source Matl to France)
  • ML19263E987  + (Forwards SECY-79-493 & Relevant Background Matl.W/O Encl)
  • ML19225A322  + (Forwards SECY-79-72A Re Executive Director Response on Pending Application to Export Highly Enriched U to Japan)
  • ML20154A480  + (Forwards SECY-80-319, Analysis of Alternative for Conducting Independent Verification Testing of Environmentally Qualified Equipment, Advising That Commission Approved Recommendations)
  • ML20005A766  + (Forwards SECY-81-395 & Directors Decision DD-81-9,prepared in Response to Shoreham Opponents Coalition Petition to Institute Proceedings on Whether Good Cause Exists to Extend Facility Completion Date)
  • ML20032C780  + (Forwards SECY-81-440 & Wj Dircks 811104 Memo Re Commission Policy & Guidance on Plant Staff Working Hours)
  • ML20033A539  + (Forwards SECY-81-641 Re Electromagnetic Pulse Effects on Nuclear Power Plants in Response to Commissioner Ahearne 811110 Request)
  • ML20039C573  + (Forwards SECY-81-641, Electromagnetic Pulse (Emp) - Effects on Nuclear Power Plants, in Response to Proposed Contentions I-49 (Lewis) & VIII-15 (White))
  • ML20053E634  + (Forwards SECY-82-207 Re Final Rule on Environ Qualification of safety-related Electrical Equipment for Nuclear Power Plants)
  • ML20137D659  + (Forwards SECY-82-53 Re Possible Relocation of Design Controlling Earthquakes in Eastern Us & USGS Position on Zone in Which Charleston Earthquake Could Recur.D Okrent Will Address Issue at ACRS Subcommittee Meeting)
  • ML20041D759  + (Forwards SECY-82-8A Re Final Rule on Need for Power & Alternative Energy Issues in OL Proceedings Adopted by Commission on 820304)
  • ML20083G316  + (Forwards SECY-83-472, ECCS Analysis Methods for Placement in PDR)
  • ML20133D593  + (Forwards SECY-84-209,per 840611 Request.Paper Not Yet Acted on by Commission.Document Should Be Restricted to Subcommittee.W/O Encl)
  • ML20141G914  + (Forwards SECY-84-394 & Transcript of Commission 841023 Meeting Re Proposed Rule on Consideration of Earthquakes in Context of Emergency Preparedness.W/O Encl)
  • ML20236D843  + (Forwards SECY-85-122, Georgia Power Co (Vogtle) Initiative to Conduct Operational Readiness Review Pilot Program for Placement in PDR)
  • ML20199D573  + (Forwards SECY-86-43 Re Proposed Rule 10CFR40, U Mill Tailing Regulations:Groundwater Protection & Other Issues, for Concurrence & Signature)
  • ML20210N753  + (Forwards SECY-87-035 Re Consideration of Emergency Planning Rule Changes to Deal W/Lack of Govt Cooperation in Offsite Emergency Planning.Related Correspondence)
  • ML20236P319  + (Forwards SECY-87-256 & SECY-87-262 to Be Placed in Files & Made Available in Pdr.Previous Release of SECY-87-220 Confirmed.W/O Encls)
  • ML20236M063  + (Forwards SECY-87-267 on Second Quarterly Progress Rept Re Prelicensing Phase of DOE Civilian High Level Radwaste Mgt Program Approved for Release to PDR)
  • ML20246M094  + (Forwards SECY-87-296, Substandard/Counterfeit Fasteners, Per H Myers Request.W/O Encl)
  • ML20153C477  + (Forwards SECY-88-109, Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations)
  • ML20150E288  + (Forwards SECY-88-171, Soviet Academician Legasov Memoirs, for Placement in PDR)
  • ML19325D664  + (Forwards SECY-88-232 Re Proposed Rulemaking on Fitness for Duty for Placement in Pdr.Secy Already Found in PDR)
  • ML20195D419  + (Forwards SECY-88-304 Re Staff Actions to Reduce Testing at Power & SECY-88-307 Re Tech Spec Improvement Program for Placement in PDR)
  • ML20153B600  + (Forwards SECY-88-39B & SECY-88-74 for Placement in PDR)
  • ML20196A330  + (Forwards SECY-88-88 for Purpose of Obtaining Commission Approval for Issuance of Notice of Opportunity for Hearing in Subj Proceedings That Differed from Std Part 50 Notice. Staff Recommendations Approved W/O Substantive Changes)