Forwards SE on Joint Owner Group Program on Periodic Verification of motor-operated Valves Described in TR NEDC-32719,rev 2.Joint OG Program on MOV Periodic Verification Serves as Acceptable Response to GL 96-05
ML20198L635
Person / Time
Issue date: 10/30/1997
From: Essig T
NRC (Affiliation Not Assigned)
To: Rausch T
BWR OWNERS GROUP, COMMONWEALTH EDISON CO., NUCLEAR FUEL SERVICES, INC.
Shared Package
ML20198L638 List:
References
PROJECT-691 FACA, GL-96-05, GL-96-5, NUDOCS 9801160080
Download: ML20198L635 (2)


Text

F

\\

r

> f WUCLEAR RECULATORY COMMISSION

'g UntTED STAtas wasmwereg,s.o.samem

\\e.,,e octeNr 30, 1997 l

1 Mr. Thomas J. Rausch, Chairman Solling Water Reactor Owners' Group i

CawrOEdison Company Nuclear Fuel Services 1400 Opus Place,4th Floor ETWill Downers Grove,IL 80616

SUBJECT:

BAFETY EVALUATION ON JOINT OWNERS' GROUP PROGRAM ON PER VERIFICATION OF MOTOR OPERATED VALVES DESCRIBED IN l

TOPICAL REPORT NEDC 3271g (REVISION 2)

~!

Dear Mr. Rausch:

. The NRC staff has redewedI w subject topical report submitted by the Boiling Water Reactor l

Owners' Group (BWROG) on July 30,19g7. With the conditio.7: M Hmht!ons desonoodin i

the enclosed safety es elustiu, the staff considers that the Joint owners' Group (JOG) Program on MOV Periodic Vermestion serves as an acceptable industry wide response to Generic Letter i

(GL) 96 05, " Periodic Vertfication of Design Basis capability of Safety-Related Motor-Operated l

Valves." As specmed in the enclosed safety evaluation,' JOG must submit for NRC review and approval a revision to (or replacement report for) the subject topical report describing the final test criteria for the long-term MOV Periodic Vertfication Program, and the justification for those criteria following completion of the 5 year JOG dynamic test program.

The final version of the topical report should incorporate this letter, the safety evaluation, NRC staff written comments provided to BWROG on the JOG program, and the submitted JOG responses.

t Please advise us within 30 days whether any material in the enclosed safety evaluation is considered proprietary. Without such notification, the staff will place the safety evaluation in the NRC Public Document Room.

4 O

Tho nas H. Essig.

Chief Generic issues and l

Environmental Projects Branch

,9),

Division of Reactor Program Management

Enclosure:

Safety Evaluation Office of Nuclear Reactor Regulation t

i oc w/o encl: See next page Projed No. Og1

\\

L fvoj OI e

9001160000 971030 PDR TOPRP EPfvoENE L

l

,eA*..

2-l in.-.-._,,._a__..,,_u__,.-,..,.._..s-.._,.. _ ___ _ __ _ __~_ _ ___

4

Project No. 001 M.

Boiling Water Reactor Owners Group oc w/o enclosure:

Carl D. Terry Vice Prooldent, Nuclear Engineering Niagara Mohewk Power Corporation Nne Mile Point 2 P.O. Box 63 Lycoming,NY 13093 Drew B. Fetters PECO Energy Nuclear Group Headquarters MC62C3 965 Chesterbrook Ehnf.

Wayne, PA 19087 John Hosner Commonwealth Edison Company Executive Towers,4th Floor 1400 Opus Place Downers Grove,IL 60515 George T. Jones Pennsylvania Power & Light MC A61 Two North Ninth Street Allentown, PA 18101 Lewis H. Sumner Southeh, auclear/Georgle Power Company E. l. Hatch Nuclear Power Plant U.S. Route 1 North, Box 439 Baxley, GA 31513 L A. England Entergy Operations, Inc.

P.O. Box 31995 Jackson,MS 39286 K. K. Sedney GE Nuclear Energy 175 Curtner Ave., M/C 182 -

San Jose, CA 95125

_ _ _ _ _. _.. _ _ _. _ _ _ _. _ _ -. -. _ _