Forwards SE on Resolution of USI A-46 Implementation Program at Plant.Staff Determined That Util C/As & Completed Physical Mods for Resolution of Outliers Will Result in Safety Enhancement Beyond Original Licensing Basis
ML20236X518
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/29/1998
From: Richard Laufer
NRC (Affiliation Not Assigned)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20236X520 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR TAC-M69444, NUDOCS 9808100064
Download: ML20236X518 (4)


Text

.

i I '

Mr. L:s Liu i ChiirmEn of ths Bo rd and Chief Executive Officer IES Utilities Inc.

200 First Street, SE.

P.O. Box 351 Cedar Rapids, IA 52406-0351

SUBJECT:

SAFETY EVALUATION ON THE RESOLUTION OF UNRESOLVED SAFETY ISSUE A-46 AT THE DUANE ARNOLD ENERGY CENTER (TAC NO. M69444)

Dear Mr. Liu:

Enclosed is the staff's safety evaluation (SE) of IES Utilities Inc 's Unresolved Safety issue (USI) A-46 implementation program at the Duane Amold Energy Center (DAEC). IES Utilities Inc established its USl A-46 program at the DAEC in response to Generic Letter (GL) 87-02 through a 10 CFR 50.54(f) letter. The staff concludes that IES Utilities Inc.'s A-46 implementation program has, in general, met the purpose and intent of the criteria in Generic Implementation Procedure, Revision 2 (GIP-2) and the NRC's Supplemental Safety Evaluation Report No. 2 (SSER No. 2) for the resolution of USI A-46. The staff has determined that the IES Utilities Inc.'s corrective actions and completed physical modifications for resolution of outliers will result in safety enhancements that are beyond the original licensing basis in certain iespects. Accordingly, these actions and modifications provide sufficient basis to close the USl i A-46 review at the DAEC. The staff also concludes that the IES Utilities Inc.'s implementation l programs to resolve USl A-46 at the DAEC have adequately addressed the purpose of the 10 CFR 50.54(f) request. IES Utilities Inc.'s activities related to the USl A-46 implementation are subject to NRC inspection.

l l

Sincerely, J 4

Original signed by:

Richard J. Laufer, Project Manager Project Directorate lil-3

, Division of Reactor Projects lil/IV

.L(

U, b, ~, _l Office of Nuclear Reactor Regulation Docket No. 50 '331 y.g. p .

,c yp "g E

cc: See next page b ' E "; 'M 7d C '

'I l Distribution :

j Docket File GGrant, Rlli EGA1 HAshar f l

PUBLIC ACRS OGC KDesai PD3-3 Reading RBellamy CWu GGalletti 49 1 DOCUMENT NAME: G:\DUANEARN\DA6944.SER *no major changes to SE T.)

To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

~

OFFICE PM:PD33 E. LA:FD33 ;6 EMES lC NAME RLaufer V EBarnhill f,[F RWessman*  :

f DATE 1/W98 1//)/b8 7/6/98 l OFFICIAL RECORD COPY 9808100064 980729 -

PDR ADOCK 05000331 P PDR i

4

  • Mr, LGo Liu July 29. 1998 s Ch:irm:n of th) Bo:rd

' and Chief Executive Officer IES Utilities Inc. 1 200 First Street, SE.

P.O. Box 351 Cedar Rapids, IA 52406-0351

SUBJECT:

SAFETY EVALUATION ON THE RESOLUTION OF UNRESOLVED SAFETY ISSUE A-46 AT THE DUANE ARNOLD ENERGY CENTER (TAC NO. M69444)

Dear Mr. Liu:

Enclosed is the staff's safety evaluation (SE) of IES Utilities Inc.'s Unresolved Safety issue (USI) A-46 implementation program at the Duane Arnold Energy Center (DAEC). IES Utilities Inc. established its USl A-46 program at the DAEC in response to Generic Letter (GL) 87-02 through a 10 CFR 50 54(f) letter. The staff concludes that IES Utilities Inc.'s A-46 implementation program has, in general, met the purpose and intent of the criteria in Generic Implementation Procedure, Revision 2 (GIP-2) and the NRC's Supplemental Safety Evaluation Report No. 2 (SSER No. 2) for the resolution of USl A-46. The staff has determined that the IES Utilities Inc.'s corrective actions ano completed physical modifications for resolution of outliers will result in safety enhancements that are beyond the original licensing basis in certain respects. Accordingly, these actions and modifications provide sufficient basis to close the USI A-46 review at the DAEC. The staff also concludes that the IES Utilities Inc.'s implementation programs to resolve USI A-46 at the DAEC have adequately addressed the purpose of the 10 CFR 50.54(f) request. IES Utilities Inc.'s activities related to the USl A-46 implementation are subject to NRC inspection.

Sincerely, Original signed by:

Richard J. Laufer, Project Manager Project Directorate lll-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-331 cc: See next page Distribution Docket File GGrant, Rit! EGA1 HAshar PUBLIC ACRS OGC KDesai PD3-3 Reading RBellamy CWu GGalletti DOCUMENT NAME: G:\DUANEARN\DA6944.SER *no major changes to SE To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE PM:PD33 E. LA:PD33 6 EMEB C NAME RLaufer W EBarnhill f,[7 RWessman*

i DATE 1/W98 'l p)/98 7/6/98 OFFICIAL RECORD COPY

p anero

-y t UNITED STATES

~ NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30eeH001 4>*n*** \

July 29, 1998 Mr. Lee Liu Chairman of the Board and Chief Executive Officer lES Utilities Inc. {

1 200 First Street, SE.

P.O. Box 351 Cedar Rapids, IA 52406-0351

SUBJECT:

SAFETY EVALUATION ON THE RESOLUTION OF UNRESOLVED SAFETY ISSUE A-46 AT THE DUANE ARNOLD ENERGY CENTER (TAC NO. M69444)

Dear Mr. Liu:

Enclosed is the staff's safety evaluation (SE) of IES Utilities Inc.'s Unresolved Safety issue (USI) A 46 implementation program at the Duane Amold Energy Center (DAEC). IES Utilities Inc. established its USl A-46 program at the DAEC in response to Generic Letter (GL) 87-02 through a 10 CFR 50.54(f) letter. Tne staff concludes that IES Utilities Inc.'s A-46 implementation program has, in general, met the purpose and intent of the criteria in Generic implementation Procedure, Revision 2 (GlP-2) and the NRC's Supplemental Safety Evaluation Report No. 2 (SSER No. 2) for the resolution of USl A-46. The staff has determined that the IES Utilities Inc.'c corrective actions and completed physical modifications for resolution of outliers will result in safety enhancements that are beyond the original licensing basis in certain respects. Accordingly, thei.' actions and modifications provide sufficient basis to close the USl A-46 review at the DAEC. .ne staff also concludes that the IES Utilities Inc.'s implementation programs to resolve USI A-46 at the DAEC have adequately addressed the purpose of the 10 CFR 50.54(f) request. IES Utilities Inc.'s activities related to the USl A-46 Implementation are subject to NRC inspection.

Sincerely, Richard J. Laufer, Project Manager Project Directorate 111-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-331 l cc: See next page L

  • )

l Lee Liu Duane Amold Energy Center 1 IES ' Utilities Inc. l cc:

Jack Newman, Esquire Al Gutterman, Esquire Morgan, Lewis, & Bockius 1800 M Street, NW.

Washington, DC 20036-5869 Chairman, Linn County Board of Supervisors Cedar Rapids,IA 52406 IES Utilities Inc.

ATTN: Gary Van Middlesworth Plant Superintendent, Nuclear 3277 DAEC Road Palo,IA 52324 John F. Franz, Jr.

Vice President, Nuclear Duane Arnold Enorgy Center 3277 DAEC Road Palo,IA 52324 Ken Peveler Manager of Regulatory Performance Duane Amold Energy Center 3277 DAEC Road Palo,IA 52324 U.S. Nuclear Regulatory Commission Resident inspector's Office Rursl Route #1 Palo,lA 52324 i Regional Administrator, Rlli U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4531 Parween Baig Utilities Division Iowa Department of Commerce L Lucas Office Building,5th floor Des Moines,IA 50319 l

l

!