Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065G534 + (Forwards Rev 1 to Test Procedure TR-213, One Hour Fire Test of Darmatt KM1 Sys for Protecting Cable Tray,Conduit, Supports & Junction Boxes In...Dg Corridors, Per Request for Info Via 940323 Telcon Re Util Thermo-Lag Test Program)
- ML20137E678 + (Forwards Rev 1 to Test Rept TS-TP-0084, Penetration C Fire & Hose-Stream Test for 10 Inches of TS-MS-0045-B Silicone Elastomer (Bus Duct Seal) & Extrapolation of Test Rept,Per 850425 Meeting & 850815 Telcon)
- ML20137E684 + (Forwards Rev 1 to Test Rept TS-TP-0084, Penetration C Fire & Hose-Stream Test for 10 Inches of TS-MS-0045-B Silicone Elastomer (Bus Duct Seal) & Extrapolation of Test Rept,Per 850425 Meeting & 850815 Telcon)
- BSEP-93-0115, Forwards Rev 1 to Test Rept for Point of Installation Electromagnetic Interference (EMI) Mapping of Controls Rooms,Brunswick Plant,Units 1 & 2 & Rev 2 to Test Rept for Analysis of EMI Main CR Mapping Data & GE Numac Ldm.. + (Forwards Rev 1 to Test Rept for Point of Installation Electromagnetic Interference (EMI) Mapping of Controls Rooms,Brunswick Plant,Units 1 & 2 & Rev 2 to Test Rept for Analysis of EMI Main CR Mapping Data & GE Numac Ldm..)
- ML20056G215 + (Forwards Rev 1 to Test Results Rept WVNS-TR-70-023, Waste Form Qualification Rept:Wvdp Stabilized Sludge Wash Cement- Waste W/Type V Portland Cement & Rev 2 to WVNS-PCP-004, Process Control Plan for Cement Solidification Of..)
- ML20155D781 + (Forwards Rev 1 to Third 10 Yr Interval Inservice Testing Program. Implementing Procedures Being Revised)
- ML20080A233 + (Forwards Rev 1 to Third-Party Const Implementation Overview Procedure. Procedure Revised for Clarity.Requirement for Monthly Repts Deleted)
- ML20042E500 + (Forwards Rev 1 to Topical Rept 028, Oyster Creek Response to NRC Reg Guide 1.97)
- ML20099D422 + (Forwards Rev 1 to Topical Rept 083, TMI-1 Cycle 9 Core Operating Limits Rept. Rev Incorporates Adjustments to Cycle 9 Rod Index Limits Using plant-specific 2% Uncertainty in Rod Position Indication in Lieu of Generic 1.5% Value)
- ML20154L121 + (Forwards Rev 1 to Topical Rept BAW-2295, Justification for Extension of AOT for Low Pressure Injection & Reactor Bldg Spray Sys)
- ML20062G738 + (Forwards Rev 1 to Topical Rept Bq 89-50-A, QA Program for Nuclear Fuel & Core Components. Rev Changes Number of Levels of Mgt Between Div Manager & First Line Mgt.Dept of Fuel Engineering Split Into Two New Depts)
- ML20070K058 + (Forwards Rev 1 to Topical Rept DPC-NE-3002, FSAR Chapter 15 Sys Transient Analysis Methodology. Rev Reflects Changes Due to Replacement SGs for McGuire & Catawba Unit 1, Corrections to Typos & Minor Methodology Changes)
- ML20081L049 + (Forwards Rev 1 to Topical Rept TR-081, Oyster Creek Plant- Specific Oxygen Generation Following Loca)
- GO2-90-149, Forwards Rev 1 to Topical Rept WPPS-FTS-129, BWR Transient Analysis Model + (Forwards Rev 1 to Topical Rept WPPS-FTS-129, BWR Transient Analysis Model)
- ML17286A326 + (Forwards Rev 1 to Topical Rept WPPS-FTS-129, BWR Transient Analysis Model.)
- AECM-86-0375, Forwards Rev 1 to Training & Qualification Plan Incorporating Name Change of Middle South Energy,Inc to Sys Energy Resources,Inc (Seri).Seri Will Assume Responsibility for Operation of Facility.Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 1 to Training & Qualification Plan Incorporating Name Change of Middle South Energy,Inc to Sys Energy Resources,Inc (Seri).Seri Will Assume Responsibility for Operation of Facility.Rev Withheld (Ref 10CFR2.790))
- TXX-3681, Forwards Rev 1 to Training Manual Procedure TRA-204, Licensed Operator Requalification Training Program + (Forwards Rev 1 to Training Manual Procedure TRA-204, Licensed Operator Requalification Training Program)
- ML20112B327 + (Forwards Rev 1 to Training Program TP-305C, NRC Licensed Operator Requalification Program, Per SER Open Item 12(b). Shift Cycle Training Section Will Be Deleted & Training Discontinued 12 Wks Prior to Exam)
- ML20094B365 + (Forwards Rev 1 to Transcript of 841022 Hearing in Hauppauge, Ny,Consisting of Replacement Pages to Be Inserted Into Original Transcript)
- ML20198Q774 + (Forwards Rev 1 to Transient Analysis Lesson Plan, in Response to NRC 860414 Request for Addl Info to Complete Review of Proposed Licensing Candidate Training Program in Util)
- VPN-047-94, Forwards Rev 1 to Trojan Nuclear Plant Defueled Sar + (Forwards Rev 1 to Trojan Nuclear Plant Defueled Sar)
- ML20198C115 + (Forwards Rev 1 to Tuba City,Az Remedial Action Insp Plan,For Review & Concurrence within 21 Days of Receipt of Ltr)
- ST-HL-AE-5782, Forwards Rev 1 to Unit 1,Cycle 6,COLR & Rev 1 to Unit 2, Cycle 8,COLR IAW TS 6.9.1.6.d + (Forwards Rev 1 to Unit 1,Cycle 6,COLR & Rev 1 to Unit 2, Cycle 8,COLR IAW TS 6.9.1.6.d)
- ML20217K754 + (Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units)
- ST-HL-AE-3062, Forwards Rev 1 to Unit 2 Pump & Valve Inservice Test Plan. Changes Incorporated Into Rev 1 of Plan listed.W/51 Oversize Drawing + (Forwards Rev 1 to Unit 2 Pump & Valve Inservice Test Plan. Changes Incorporated Into Rev 1 of Plan listed.W/51 Oversize Drawing)
- ML17310B158 + (Forwards Rev 1 to Unit 2,Cycle 5,COLR,effective on 940319. COLR Modifies Linear Heat Rate in COLR Section 3.2.1 from Kw/Ft to 13.5 Kw/Ft as Result of LOCA Reanalysis W/Increased Number of Plugged SG Tubes)
- ML17310B159 + (Forwards Rev 1 to Unit 2,Cycle 5,COLR,effective on 940319. COLR Modifies Linear Heat Rate in COLR Section 3.2.1 from Kw/Ft to 13.5 Kw/Ft as Result of LOCA Reanalysis W/Increased Number of Plugged SG Tubes)
- ML20080A213 + (Forwards Rev 1 to Updated FSAR)
- ML20077D221 + (Forwards Rev 1 to Updated FSAR)
- ML20077A227 + (Forwards Rev 1 to Updated FSAR)
- ML20076K101 + (Forwards Rev 1 to Updated FSAR)
- ML18052A211 + (Forwards Rev 1 to Updated FSAR Chapter 14, Safety Analysis, Chapter 5,Section 5.6, Dynamic Effects..., Organization Charts in Chapter 12 & Rev 0 to Figure 10-2, Sheet 1A,per 851017 Commitment to Forward Addl Updated Info)
- ML20005G716 + (Forwards Rev 1 to Updated FSAR for Braidwood & Byron Units 1 & 2.Changes in Rev 1 Include Facility & Procedures Which Were in Effect as of 890610.W/o Encl)
- ML19325C384 + (Forwards Rev 1 to Updated FSAR for Clinton Power Station & 10CFR50.59 Repts of Changes for Jan-Mar 1989.Updated FSAR Reflects Changes Through Mar 1989)
- U-601541, Forwards Rev 1 to Updated FSAR for Clinton Power Station & 10CFR50.59 Repts of Changes for Jan-Mar 1989.Updated FSAR Reflects Changes Through Mar 1989 + (Forwards Rev 1 to Updated FSAR for Clinton Power Station & 10CFR50.59 Repts of Changes for Jan-Mar 1989.Updated FSAR Reflects Changes Through Mar 1989)
- ML20077D706 + (Forwards Rev 1 to Updated FSAR for Ei Hatch Nuclear Plant, Units 1 & 2)
- AECM-86-0367, Forwards Rev 1 to Updated FSAR for Grand Gulf Nuclear Station,Unit 1 + (Forwards Rev 1 to Updated FSAR for Grand Gulf Nuclear Station,Unit 1)
- B10812, Forwards Rev 1 to Updated FSAR for Millstone Unit 2 + (Forwards Rev 1 to Updated FSAR for Millstone Unit 2)
- ML17054A854 + (Forwards Rev 1 to Updated FSAR for Nine Mile Point Nuclear Station Unit 1)
- ML18051B573 + (Forwards Rev 1 to Updated FSAR for Palisades Plant, Reflecting Removal of Electrohydraulic Door Closure Units from Inner Door of Containment Personnel Air Lock & Replacement of Auxiliary Feedwater Sparger Sys)
- ST-HL-AE-3640, Forwards Rev 1 to Updated FSAR for South Texas Project Electric Generating Station Units 1 & 2.Changes Since Rev 0 & Unreviewed Safety Question Evaluations & Change Notices cross-reference Encl + (Forwards Rev 1 to Updated FSAR for South Texas Project Electric Generating Station Units 1 & 2.Changes Since Rev 0 & Unreviewed Safety Question Evaluations & Change Notices cross-reference Encl)
- L-83-568, Forwards Rev 1 to Updated FSAR for Turkey Point,Units 3 & 4 + (Forwards Rev 1 to Updated FSAR for Turkey Point,Units 3 & 4)
- ML20028H778 + (Forwards Rev 1 to Updated Final Hazards Summary Rept (Fhsr), Superseding 910114 Submittal.Fhsr Changes Made Under 10CFR50.59 But Not Previously Submitted to NRC Listed)
- ML20214J096 + (Forwards Rev 1 to Updated Fire Hazard Analysis & Fire Protection Program,Revising Fire Loadings in Some Areas.Revs to App B Reflect Agreements Reached Between Util & NRC in 861024 Telcon)
- ML13312A627 + (Forwards Rev 1 to Updated Fire Hazards Analysis, Including Unit 1 Specific Info,Fire Hazards Analysis Matrices for Each Fire Area & Zone,Fire Area Features Drawings & Emergency Lighting Drawings.Certificate of Svc Encl)
- ML20077D326 + (Forwards Rev 1 to Updated Fsar,Denoting Changes During 820120-830120)
- ML20077F219 + (Forwards Rev 1 to Updated Fsar,Including Steam Generator Interspace Pressure Control Mod & Meteorological Equipment Mods)
- ML20077E051 + (Forwards Rev 1 to Updated Fsar,Incorporating Mark I Containment Program Results)
- ML20080A809 + (Forwards Rev 1 to Updated Fsar,Reflecting Info & Analyses Submitted to NRC & Clarification or Editorial Changes.Revs to Section 14.3 Will Be Provided During Sept 1983.Ack of Receipt Requested)
- ML18089A283 + (Forwards Rev 1 to Updated Fsar,Reporting Facility Changes Made Since 820715)
- ML20076K326 + (Forwards Rev 1 to Updated Fsar,Vol 21,for Jm Farley Nuclear Plant,Units 1 & 2.Rev Reflects Plant & Procedure Mods Through 830101 & Changes Per 10CFR50.59(b))
- ML20112J868 + (Forwards Rev 1 to Updated Fsar.Chapter 7 Re Instrumentation & Controls Reorganized.Encl Will Be Used to Perform 10CFR50.59 Reviews)
- L-86-135, Forwards Rev 1 to Updated Fsar.List of Plant Changes/Mods Made Under 10CFR50.59 Also Encl + (Forwards Rev 1 to Updated Fsar.List of Plant Changes/Mods Made Under 10CFR50.59 Also Encl)
- ML20077E233 + (Forwards Rev 1 to Updated Fsar.Replacement Pages for Typographical & Grammatical Errors Identified in 830722 Updated FSAR Also Encl)