ML20077A227

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Updated FSAR
ML20077A227
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/20/1983
From: Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20077A231 List:
References
NUDOCS 8307220238
Download: ML20077A227 (4)


Text

-

r PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101

",*",,7,',,",^,,",'"'#"*

1215 8414ooo OUG ENE J. BR ADLEY associar..s.unas cou.. 6 OON ALD SLANKEN RUDOLPH A. CHILLEBAI O.C.KIRKHALL T. H. M AHER CORNELL July 20, 1983 PAUL AUERBACH

...s.v...........

ODW ARD J. CULLEN, JR.

THOM AS H. MILLER, J R.

IRENE A. McMENN A As.ssvassY cow...L Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 Re:

Peach Bottom Atomic Power Station Units 2 and 3 Docket No.s. 50-277 and 50-278 Lear Mr. Denton:

Enclosed for filing with the Commission, in accordance with Section 50.71 of the Commission's Regulations, is the first annual revision of the Updated Final Safety Analysis Report for Peach Bottom Atomic Power Station Units 2 and 3.

This filing consists of an original and twelve copies of the certification required by Section 50.71(e)(2) and thirteen copies of the replacement pages to be inserted in the Updated FSAR, including instructions for making the revision and a listing of the replacement pages.

Revised Residual Heat Removal System Figures 4.8.2 and

$hbo 0

i

. =.

Mr. Harold R. Denton July 20, 1983 Page 2 7.4.6 which should be included in this revision are being prepared and will be forwarded for inclusion as soon as they are available.

Very truly yours,

,Y EU NE

. BRADLEY f

EJB:PDS enclosures 1

I

- 'd i

e 1

BEFORE THE U.S. NUCLEAR REGULATORY COMMISSION i

In the matter of

Docket No. 50-277 4

l

-PHILADELPHIA ELECTRIC COMPANY 50-278 i

(Peach Bottom Atomic Power Station, Units 2 & 3)

CERTIFICATION f

S. L. Daltroff, being first duly sworn, deposes and states as i

follows:

1.

He is Vice President of Philadelphia Electric Company,

[

Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach l

Bottom Atomic Power Station, Units 2 & 3, and is authorized to make'this l

Certification on behalf of the Licensee.

j 2.

The first revision to the Updated Final Safety Analysis i

l Report, which is filed herewith, updates the original Updated Final Safety i

Analysis Report submitted for Peach Bottom Units 2 & 3 on July 20, 1982,.

as necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement since the submittal of l

the original Updated Final Safety Analysis Report. Changes made under the provisions of 10 CRF 550.59 for the period covered by the revisions to the Updated Final Safety. Analysis Report have been previously submitted to the Commission. Modifications to'the Residual Heat Removal System l.

require that Figures 4.8.2 and 7.4.6 of the original Updated Final Safety

)

Analysis Report be revised. These revised figures will be filed by August 5, 1983.

3.

With the exception of Figures 4.8.2 and 7.4.6 referred to in the preceding paragraph, the revision to the Updated Final Safety I

Analysis Report brings the Updated Final Safety Analysis Report up to date as of at least January 22, 1983.

p

..--e

.w

~~.

-..,.Ye

'em

-t f t-te r

+---'av y-

-vt e'v-*1 4

e

- - - - * + *

-t=--w-+'*

Smrv-rw--

  • +-* "-- *

-o N'-

w t"*'e we"'s-we

c 4.

The statements and matters set forth herein are true and correct to the best of his knowledge, information and belief.

I 48 S'. L. ~ D ) t ro f f

/ 'M Subscribed and sworn to before me this 20 day of July, 1983.

oML k 04u Notary I ublic '

F PATRICIA D. SCHOLE Notary Public Philadelphia. Philadelphia Co, My Commission Expres February 10,1986 i

l