ML17310B159

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Unit 2,Cycle 5,COLR,effective on 940319. COLR Modifies Linear Heat Rate in COLR Section 3.2.1 from Kw/Ft to 13.5 Kw/Ft as Result of LOCA Reanalysis W/Increased Number of Plugged SG Tubes
Date released: 07/31/2018 Download: ML17310B159


PVNGS Rev 1 to Unit 2,Cycle 5 Core Operating Limits Rept.
ML17310B160
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/25/1994
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
References
Download: ML17310B160 (10)
Forwards Rev 1 to Unit 2,Cycle 5,COLR,effective on 940319. COLR Modifies Linear Heat Rate in COLR Section 3.2.1 from Kw/Ft to 13.5 Kw/Ft as Result of LOCA Reanalysis W/Increased Number of Plugged SG Tubes
ML17310B158
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/25/1994
From: Krainik A
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17310B158 (6)