ML20077D706

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Updated FSAR for Ei Hatch Nuclear Plant, Units 1 & 2
ML20077D706
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/22/1983
From: Beckham J
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20077D713 List:
References
NED-83-392, NUDOCS 8307270035
Download: ML20077D706 (2)


Text

, - -

Georgia Power Company 333 Piedroont Avenue Atlanta. G%9a 30308 Telephone 404 526J020 MaAng Mo'ess:

Post once Bcx 4545 b

At aata Georg:a 30302 Georgia Power tre southem c!ec:nc system J. T. Beckham, Jr.

$c'$'r"c#[' *jn "# ' "^""#

NED-83-392 U

e,,

July 22, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC D0tXETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 FSAR AMENDMENT SUBMITTAL Gentlemen:

Pursuant to 10 CFR 50.71(e), Georgia Power Company hereby submits annual amendments to the Final Safety Analysis Reports (FSARs) for both Hatch units.

These amendments constitute revision 1 to the updated. FSAR submitted on July 22, 1982, and reflect information and analyses prepared pursuant to NRC requirements through January 22, 1983.

Identification of changes made to the plant under 10 CFR 50.59 has previously been submitted to the MC through monthly and annual operating reports.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEORGIA POWER COMPANY By.-

h - --

yJ.T.Beckham,Jr.

l Sworn-and subscribed efore ge this 22nd day of July,1983.

I

///_

Notary Public. Georgia, state at Large l

Mj M Af, My Commission Expires Sept. 20.1983 Notary Public REB /mb Enclosure ggY pc,h xc:

H. C. Nix, Jr.

g Senior Resident Inspector J. P. O'Reilly, (WC-Region II) k 6 +*p i

s 0307270035 830722 PDR ADOCK 05000321 K

PDR

Georgia Power Company 333 Piedmont Avenus At;anta. Georg:a 30308 Telepnoce 404 526 7020

(

Maihng Accress-Post off ce 80x 4545 At'anta. Georg:a 30302 Georgia Power J. T. 9eckham, Jr.

tre soutt'em e ectre system p

Vce Presicent and General M taager NED-83-392 Nuclear Geceration July 22, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, 011ef Operating Reactors Branch No. 4 i

Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 FSAR AMENDMENT SUBMITTAL Gentlemen:

Pursuant to 10 CFR 50.71(e), Georgia Power Company hereby submits annual amendments to the Final Safety Analysis Reports (FSARs) for both Hatch units.

O These amendments constitute revision 1 to the updated. FSAR submitted on July 22,1982, and reflect information and analyses prepared pursuant to NRC requirements through January 22, 1983.

Identification of changes made to the plant under 10 CFR 50.59 has previously been submitted to the PC through monthly and annual operating reports.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEORGIA POWER COMPANY By:

h pJ.T.Beckham,Jr.

Swor and subscribed before rye this 22nd day of July,1983.

(

///_

Notary Public. Georgia. state at Large

( I /

<![-r[A -[/ 4 4,/ d f j

p My Commission Loires Sept. 20.1983

()

Notary Public REB /mb Enclosure xc:

H. C. Nix, Jr.

Senior Resident Inspector O

a e o'aett1v. (*c-aeotoa tt)

-